More than four years after earthquakes first damaged home in Christchurch, hundreds of Canterbury homeowners are finding out that they may have to wait another two years before their damaged homes are repaired.
Oral historian Alison Parr has given voice to the people of Christchurch five years on from the devastating earthquake that shattered their city in her recently released 'Remembering Christchurch: Voices from Decades Past'.
As the future of the world’s oil reserves becomes progressively more uncertain, it is becoming increasingly important that steps are taken to ensure that there are viable, attractive alternatives to travel by private motor vehicle. As with many of New Zealand’s major urban centres, Christchurch is still exceptionally reliant on private motor vehicles; although a significant proportion of the population indicate that they would like to cycle more, cycling is still an underutilised mode of transport. Following a series of fatal earthquakes that struck the city in 2010 and 2011, there has been the need to significantly redevelop much of the city’s horizontal infrastructure – subsequently providing the perfect platform for significant changes to be made to the road network. Many of the key planning frameworks governing the rebuild process have identified the need to improve Christchurch’s cycling facilities in order to boost cycling numbers and cyclist safety. The importance of considering future growth and travel patterns when planning for transport infrastructure has been highlighted extensively throughout literature. Accordingly, this study sought to identify areas where future cycle infrastructure development would be advantageous based on a number of population and employment projections, and likely future travel patterns throughout the city. Through the use of extensive GIS analysis, future population growth, employment and travel patterns for Christchurch city were examined in order to attain an understanding of where the current proposed major cycleways network could be improved, or extended. A range of data and network analysis were used to derive likely travel patterns throughout Christchurch in 2041. Trips were derived twice, once with a focus on simply finding the shortest route between each origin and destination, and then again with a focus on cyclist safety and areas where cyclists were unlikely to travel. It was found that although the proposed major cycleways network represents a significant step towards improving the cycling environment in Christchurch, there are areas of the city that will not be well serviced by the current proposed network in 2041. These include a number of key residential growth areas such as Halswell, Belfast and Prestons, along with a number of noteworthy key travel zones, particularly in areas close to the central city and key employment areas. Using network analysis, areas where improvements or extensions to the proposed network would be most beneficial were identified, and a number of potential extensions in a variety of areas throughout the city were added to the network of cycle ways. Although it has been found that filling small gaps in the network can have considerable positive outcomes, results from the prioritisation analysis suggested that initially in Christchurch demand is likely to be for more substantial extensions to the proposed major cycleways network.
The New Zealand city of Christchurch suffered a series of devastating earthquakes in 2010-11 that changed the urban landscape forever. A new rebuilt city is now underway, largely based on the expressed wishes of the populace to see Christchurch return to being a more people-oriented, cycle-friendly city that it was known for in decades past. Currently 7% of commuters cycle to work, supported by a 200km network of mostly conventional on-road painted cycle lanes and off-road shared paths. The new "Major Cycleways" plan aims to develop approximately 100km of high-quality cycling routes throughout the city in 5-7 years. The target audience is an unaccompanied 10-year-old cycling, which requires more separated cycleways and low-volume/speed "neighbourhood greenways" to meet this standard. This presentation summarises the steps undertaken to date to start delivering this network. Various pieces of research have helped to identify the types of infrastructure preferred by those currently not regularly cycling, as well as helping to assess the merits of different route choices. Conceptual cycleway guidelines have now been translated into detailed design principles for the different types of infrastructure being planned. While much of this work is based on successful designs from overseas, including professional advice from Dutch practitioners, an interesting challenge has been to adapt these designs as required to suit local road environments and road user expectations. The first parts of the new network are being rolled out now, with the hope that this will produce an attractive and resilient network for the future population that leads to cycling being a major part of the local way of life.
Deep shear wave velocity (Vs) profiles (>400 m) were developed at 14 sites throughout Christchurch, New Zealand using surface wave methods. This paper focuses on the inversion of surface wave data collected at one of these sites, Hagley Park. This site is located on the deep soils of the Canterbury Plains, which consist of alluvial gravels inter-bedded with estuarine and marine sands, silts, clays and peats. Consequently, significant velocity contrasts exist at the interface between geologic formations. In order to develop realistic velocity models in this complex geologic environment, a-priori geotechnical and geologic data were used to identify the boundaries between geologic formations. This information aided in developing the layering for the inversion parameters. Moreover, empirical reference Vs profiles based on material type and confining pressure were used to develop realistic Vs ranges for each layer. Both the a-priori layering information and the reference Vs curves proved to be instrumental in generating realistic velocity models that account for the complex inter-bedded geology in the Canterbury Plains.
Documenting earthquake-induced ground deformation is significant to assess the characteristics of past and contemporary earthquakes and provide insight into seismic hazard. This study uses airborne light detection and ranging (LiDAR) and conducts multi-disciplinary field techniques to document the surface rupture morphology and evaluate the paleoseismicity and seismic hazard parameters of the Hurunui segment of the Hope Fault in the northern South Island of New Zealand. It also documents and evaluates seismically induced features and ground motion characteristics of the 2010 Darfield and 2011 Christchurch earthquakes in the Port Hills, south of Christchurch. These two studies are linked in that they investigate the near-field coseismic features of large (Mw ~7.1) earthquakes in New Zealand and produce data for evaluating seismic hazards of future earthquakes. In the northern South Island of New Zealand, the Australian-Pacific plate boundary is characterised by strike-slip deformation across the Marlborough Fault System (MFS). The ENE-striking Hope Fault (length: ~230 km) is the youngest and southernmost fault in the MFS, and the second fastest slipping fault in New Zealand. The Hope Fault is a major source of seismic hazard in New Zealand and has ruptured (in-part) historically in the Mw 7.1 1888 Amuri earthquake. In the west, the Hurunui segment of the Hope Fault is covered by beech forest. Hence, its seismic hazard parameters and paleoearthquake chronology were poorly constrained and it was unknown whether the 1888 earthquake ruptured this segment or not and if so, to what extent. Utilising LiDAR and field data, a 29 km-long section of the Hurunui segment of the Hope Fault is mapped. LiDAR-mapping clearly reveals the principal slip zone (PSZ) of the fault and a suite of previously unrecognised structures that form the fault deformation zone (FDZ). FDZ width measurements from 415 locations reveal a spatially-variable, active FDZ up to ~500 m wide with an average width of 200 m. Kinematic analysis of the fault structures shows that the Hurunui segment strikes between 070° and 075° and is optimally oriented for dextral strike-slip within the regional stress field. This implies that the wide FDZ observed is unlikely to result from large-scale fault mis-orientation with respect to regional stresses. The analysis of FDZ width indicates that it increases with increased hanging wall topography and increased topographic relief suggesting that along-strike topographic perturbations to fault geometry and stress states increase fault zone complexity and width. FDZ width also increases where the tips of adjacent PSZ strands locally vary in strike, and where the thickness of alluvial deposits overlying bedrock increases. LiDAR- and photogrammetrically-derived topographic mapping indicates that the boundary between the Hurunui and Hope River segments is characterised by a ~850-m-wide right stepover and a 9º-14° fault bend. Paleoseismic trenching at Hope Shelter site reveals that 6 earthquakes occurred at A.D. 1888, 1740-1840, 1479-1623, 819-1092, 439-551, and 373- 419. These rupture events have a mean recurrence interval of ~298 ± 88 yr and inter-event times ranging from 98 to 595 yrs. The variation in the inter-event times is explained by (1) coalescing rupture overlap from the adjacent Hope River segment on to the Hurunui segment at the study site, (2) temporal clustering of large earthquakes on the Hurunui segment, and/or (3) ‘missing’ rupture events. It appears that the first two options are more plausible to explain the earthquake chronologies and rupture behaviour on the Hurunui segment, given the detailed nature of the geologic and chronologic investigations. This study provides first evidence for coseismic multi-segment ruptures on the Hope Fault by identifying a rupture length of 44-70 km for the 1888 earthquake, which was not confined to the Hope River segment (primary source for the 1888 earthquake). LiDAR data is also used to identify and measure dextral displacements and scarp heights from the PSZ and structures within the FDZ along the Hurunui segment. Reconstruction of large dextrally-offset geomorphic features shows that the vertical component of slip accounts for only ~1% of the horizontal displacements and confirms that the fault is predominantly strike-slip. A strong correlation exists between the dextral displacements and elevations of geomorphic features suggesting the possibility of age correlation between the geomorphic features. A mean single event displacement (SED) of 3.6 ± 0.7 m is determined from interpretation of sets of dextral displacements of ≤ 25 m. Using the available surface age data and the cumulative dextral displacements from Matagouri Flat, McKenzie Fan, Macs Knob and Hope River sites, and the mean SED, a mean slip rate of 12.2 ± 2.4 mm/yr, and a mean recurrence interval of ~320 ± 120 yr, and a potential earthquake magnitude of Mw 7.2 are determined for the Hurunui segment. This study suggests that the fault slip rate has been constant over the last ~15000 yr. Strong ground motions from the 2010 Darfield (Canterbury) earthquake displaced boulders and caused ground damage on some ridge crests in the Port Hills. However, the 2011 Christchurch earthquake neither displaced boulders nor caused ground damage at the same ridge crests. Documentation of locations (~400 m a.s.l.), lateral displacements (8-970 cm), displacement direction (250° ± 20°) of displaced boulders, in addition to their hosting socket geometries (< 1 cm to 50 cm depth), the orientation of the ridges (000°-015°) indicate that boulders have been displaced in the direction of instrumentally recorded transient peak ground horizontal displacements nearby and that the seismic waves have been amplified at the study sites. The co-existence of displaced and non-displaced boulders at proximal sites suggests small-scale ground motion variability and/or varying boulder-ground dynamic interactions relating to shallow phenomena such as variability in soil depth, bedrock fracture density and/or microtopography on the bedrock-soil interface. Shorter shaking duration of the 2011 Christchurch event, differing frequency contents and different source characteristics were all factors that may have contributed to generating circumstances less favourable to boulder displacement in this earthquake. Investigating seismically induced features, fault behaviour, site effects on the rupture behaviour, and site response to the seismic waves provides insights into fault rupture hazards.
A photograph of street art on a wall near Brighton Mall.
A photograph of street art on a building between Brighton Mall and Beresford Street. There is a shopping trolley in front of the artwork.
Description: Observations of RC building performance in recent earthquakes with a special focus on the devastating events in Christchurch, New Zealand. These events have highlighted the complexity of post-earthquake decisions for damaged buildings and the impacts on communities. The presentation will reflect on factors influencing demolition decisions and emerging challenges for the earthquake engineering community. http://atc-sei.org/
This week marked the 4th anniversary of the Christchurch and Canterbury earthquake. New research from the University of Otago in Christchurch with earthquake survivors is shedding some light on the question of what makes some people cope better with trauma than others. A group of psychiatrists and psychologists from the University have been studying a group of more than 100 Cantabrians exposed to high levels of stress during the earthquakes who coped well. They compared this group against a group of patients with post-earthquake trauma, being treated by the Adult Specialist Services Earthquake Treatment Team, or ASSETT, set up by the Canterbury DHB. Dr Gini McIntosh from the Otago University is part of the research team, and one of the psychologists with ASSETT.
1. PHIL TWYFORD to the Minister for State Owned Enterprises: What reports, if any, has he received about KiwiRail's plans to get rid of electric locomotives on the North Island Main Trunk Line and replace them with diesel locomotives? 2. JULIE ANNE GENTER to the Minister for State Owned Enterprises: Is he considering replacing the electric locomotives with diesel locomotives on the Main Trunk Line, and would this mean removing electrification on that line. 3. DAVID BENNETT to the Minister of Finance: What reports has he received on the New Zealand economy and business sentiment? 4. Rt Hon WINSTON PETERS to the Minister for Primary Industries: Does he believe the Dairy Industry Restructuring Amendment Act 2012 has achieved "a stable, permanent capital base for the Co-operative, secures our future and will support progress with our strategy to grow volumes and value"; if so, why? 5. MATT DOOCEY to the Minister for Social Development: What announcements has she made to improve statutory child protection in New Zealand? 6. Dr DAVID CLARK to the Minister for Economic Development: What lessons, if any, on regional economic development has he drawn from his recent ministerial visits to Northland? 7. CATHERINE DELAHUNTY to the Minister for State Owned Enterprises: Will he stop any further work on dairy conversions by Landcorp, in light of the drop in the dairy price yesterday and concerns about the impact that those conversions will have on water quality; if not, why not? 8. MARK MITCHELL to the Minister of Trade: What recent steps has the Government taken to promote and support New Zealand exporters? 9. Hon DAVID PARKER to the Minister of Trade: What monetary and other assistance was provided by the New Zealand Government in support of his bid for appointment as Director-General of the World Trade Organisation? 10. BARBARA KURIGER to the Minister for Small Business: How are small businesses benefiting from the Better for Business - Result 9 Programme? 11. POTO WILLIAMS to the Minister for Social Housing: Why are Christchurch's social housing organisations facing increased homelessness four years after the last major earthquake? 12. MAHESH BINDRA to the Minister of Corrections: Does he stand by all his answers given to the House on 1 April 2015?
A report commissioned by the Ministry of Health has found Canterbury residents are unlikely to suffer any health risks from asbestos exposure during the canterbury earthquake repairs. The Report is a review of Scientific Evidence of Non Occuptional Risks - and was convened by the Royal Society and the Prime Minister's Chief Science Advisor. Sir David Skegg, president of the Royal Society of New Zealand and Dr Alistair Humphrey, Canterbury Medical Officer of Health.
Elric Hooper is a recognisable face in Christchurch theatre both on and off stage. He spent his early years with Dame Ngaio Marsh, the influential woman for whom the theatre at The University of Canterbury was named after. The theatre was damaged during the Christchurch earthquakes and is now under threat. But is it worth keeping it?
A photograph of a section of a piece of street art on the wall of a building between Brighton Mall and Hawke Street.
A photograph of street art on the shutter of a shop in Brighton Mall. The artwork depicts flamingos, and is signed 'Muz Flamingo, 2013'.
A photograph of street art on the shutter of a shop in Brighton Mall. The artwork depicts flamingos, and is signed 'Muz Flamingo, 2013'.
A photograph of street art on the shutter of a shop in Brighton Mall. The artwork depicts flamingos, and is signed 'Muz Flamingo, 2013'.
A photograph of street art on the shutter of a shop in Brighton Mall. The artwork depicts flamingos, and is signed 'Muz Flamingo, 2013'.
A photograph of street art on the wall of a building in Brighton Mall. The artwork depicts two flamingos. The photographer believes that the artwork was created by the artist 'Muz Flamingo'.
A photograph of street art on the side of a building between Brighton Mall and Hawke Street.
A photograph of a section of a piece of street art on the wall of a building between Brighton Mall and Hawke Street.
A photograph of a section of a piece of street art on the wall of a building between Brighton Mall and Hawke Street.
A photograph of a section of a piece of street art on the side of a building between Brighton Mall and Hawke Street.
A photograph of a section of a piece of street art on the wall of a building between Brighton Mall and Hawke Street.
A photograph of a section of a piece of street art on the wall of a building between Brighton Mall and Hawke Street.
A photograph of a section of a piece of street art on the wall of a building between Brighton Mall and Hawke Street.
A photograph of a section of a piece of street art on the wall of a building between Brighton Mall and Hawke Street. This section of the artwork depicts a landscape.
A photograph of a section of a piece of street art on the wall of a building between Brighton Mall and Hawke Street. This section of the artwork depicts a landscape.
A photograph of a section of a piece of street art on the wall of a building between Brighton Mall and Hawke Street. This section of the artwork depicts a landscape.
A photograph of a section of a piece of street art on the side of a building between Brighton Mall and Hawke Street.