A photograph of a sign protesting the red stickering of Avoca Valley houses. The sign reads, "459 days since being evicted from our Avoca Valley homes. Communities make a city. Decisions now! Let us go home. Facebook: Avoca Valley Earthquake Recovery Authority".
A video of the first part of an address by Joseph Thomas, CEO of NZIM Southern, at the 2012 Seismics and the City forum. The talk explores how post-quake Christchurch has become a laboratory for new ways of working and accelerated change, and how it is important for organisations to identify and develop the cadre of new leaders who came to the forefront during and after the February quake.
A video of the second part of an address by Joseph Thomas, CEO of NZIM Southern, at the 2012 Seismics and the City forum. The talk explores how post-quake Christchurch has become a laboratory for new ways of working and accelerated change, and how it is important for organisations to identify and develop the cadre of new leaders who came to the forefront during and after the February quake.
A video of the first part of an address by Roger Sutton, Chief Executive of Canterbury Earthquake Recovery Authority, at the 2012 Seismics and the City forum. The talk focuses on Sutton's roles as the CEO of Orion during the September and February earthquakes, and the co-ordinator of the recovery and rebuild of Christchurch.
A video of the second part of an address by Dr. Rod Carr, Vice Chancellor of the University of Canterbury, at the 2012 Seismics and the City forum. Dr. Carr talks about how the University coped with the immediate disruption caused by the February earthquake, and turned a crisis into an opportunity by strengthening its learning and innovation roles in seismic-related areas and other domains.
A video of the first part of an address by Dr. Rod Carr, Vice Chancellor of the University of Canterbury, at the 2012 Seismics and the City forum. Dr. Carr talks about how the University coped with the immediate disruption caused by the February earthquake, and turned a crisis into an opportunity by strengthening its learning and innovation roles in seismic-related areas and other domains.
A video of the second part of an address by Roger Sutton, Chief Executive of Canterbury Earthquake Recovery Authority, at the 2012 Seismics and the City forum. The talk focuses on Sutton's roles as the CEO of Orion during the September and February earthquakes, and the co-ordinator of the recovery and rebuild of Christchurch.
A video examining the New Brighton Master Plan released by the Christchurch City Council. The plan proposes extending Oram Avenue through to the car park on Hawke Street and moving the supermarket to the back of the Hawke Street car park. The slow road through the top part of the mall will also be extended through the pedestrianized section, and a bus exchange will be built on Beresford Street.
In the period between September 2010 and December 2011, Christchurch (New Zealand) and its surroundings were hit by a series of strong earthquakes including six significant events, all generated by local faults in proximity to the city: 4 September 2010 (Mw=7.1), 22 February 2011 (Mw=6.2), 13 June 2011 (Mw=5.3 and Mw=6.0) and 23 December 2011 (M=5.8 and (M=5.9) earthquakes. As shown in Figure 1, the causative faults of the earthquakes were very close to or within the city boundaries thus generating very strong ground motions and causing tremendous damage throughout the city. Christchurch is shown as a lighter colour area, and its Central Business District (CBD) is marked with a white square area in the figure. Note that the sequence of earthquakes started to the west of the city and then propagated to the south, south-east and east of the city through a set of separate but apparently interacting faults. Because of their strength and proximity to the city, the earthquakes caused tremendous physical damage and impacts on the people, natural and built environments of Christchurch. The 22 February 2011 earthquake was particularly devastating. The ground motions generated by this earthquake were intense and in many parts of Christchurch substantially above the ground motions used to design the buildings in Christchurch. The earthquake caused 182 fatalities, collapse of two multi-storey reinforced concrete buildings, collapse or partial collapse of many unreinforced masonry structures including the historic Christchurch Cathedral. The Central Business District (CBD) of Christchurch, which is the central heart of the city just east of Hagley Park, was practically lost with majority of its 3,000 buildings being damaged beyond repair. Widespread liquefaction in the suburbs of Christchurch, as well as rock falls and slope/cliff instabilities in the Port Hills affected tens of thousands of residential buildings and properties, and shattered the lifelines and infrastructure over approximately one third of the city area. The total economic loss caused by the 2010-2011 Christchurch earthquakes is currently estimated to be in the range between 25 and 30 billion NZ dollars (or 15% to 18% of New Zealand’s GDP). After each major earthquake, comprehensive field investigations and inspections were conducted to document the liquefaction-induced land damage, lateral spreading displacements and their impacts on buildings and infrastructure. In addition, the ground motions produced by the earthquakes were recorded by approximately 15 strong motion stations within (close to) the city boundaries providing and impressive wealth of data, records and observations of the performance of ground and various types of structures during this unusual sequence of strong local earthquakes affecting a city. This paper discusses the liquefaction in residential areas and focuses on its impacts on dwellings (residential houses) and potable water system in the Christchurch suburbs. The ground conditions of Christchurch including the depositional history of soils, their composition, age and groundwater regime are first discussed. Detailed liquefaction maps illustrating the extent and severity of liquefaction across Christchurch triggered by the sequence of earthquakes including multiple episodes of severe re-liquefaction are next presented. Characteristic liquefaction-induced damage to residential houses is then described focussing on the performance of typical house foundations in areas affected by liquefaction. Liquefaction impacts on the potable water system of Christchurch is also briefly summarized including correlation between the damage to the system, liquefaction severity, and the performance of different pipe materials. Finally, the characteristics of Christchurch liquefaction and its impacts on built environment are discussed in relation to the liquefaction-induced damage in Japan during the 11 March 2011 Great East Japan Earthquake.
Helicopter Flight over Christchurch New Zealand
An aerial photograph captioned by BeckerFraserPhotos, "Hereford Street bridge (centre)".
A photograph captioned by BeckerFraserPhotos, "Demolition of the Brannigans Building".
A photograph of a shipping container suspended from a crane. The photograph is captioned by BeckerFraserPhotos, "The container is being placed against the end of the building being demolished to protect the building beneath it from falling debris".
A photograph taken from the top of the BNZ building. The photograph is captioned by BeckerFraserPhotos, "From left to right are the Brannigans building (under demolition), former Government Life Building, Farmers building, MFL building (under demolition), Forsyth Barr building (staying) , PricewaterhouseCoopers building (going) and the roof of the cathedral in the foreground".
A photograph taken from the top of the BNZ building. The photograph is captioned by BeckerFraserPhotos, "The Grant Thornton Building in Cathedral Square. This building will be demolished".
A video of soldiers from Delta Company from 2/1 Battalion Royal NZ Infantry Regiment using the Environment Canterbury (ECan) building on Kilmore Street for a training exercise.
Helicopter Flight over Christchurch New Zealand
Helicopter Flight over Christchurch New Zealand
Helicopter Flight over Christchurch New Zealand
Helicopter Flight over Christchurch New Zealand
Helicopter Flight over Christchurch New Zealand
Helicopter Flight over Christchurch New Zealand
Helicopter Flight over Christchurch New Zealand
Helicopter Flight over Christchurch New Zealand
Helicopter Flight over Christchurch New Zealand
Helicopter Flight over Christchurch New Zealand
Helicopter Flight over Christchurch New Zealand
A view down High Street from the corner of Colombo and Hereford Streets. In the distance, the Holiday Inn City Centre is being demolished. Taken on a day when a walkway was opened up between Re:Start Mall and Cathedral Square to allow temporary public access.
A video of a tour of the Christchurch central city Red Zone. The video shows footage of the Edmond's Band Rotunda, Gloucester Street, the CTV building site, Poplar Lane, the McKenzie & Willis building, High Street, Lichfield Street, Colombo Street, Cathedral Square, and ChristChurch Cathedral.
A photograph captioned by BeckerFraserPhotos, "Provincial Council Chambers".