Search

found 1471 results

Images, Alexander Turnbull Library

The New Zealand public contemplate a dead drought stricken landscape. As well as lack of water, there is a lack of moderate pay scales for CEOs, satisfaction with EQC, quality TV, generous insurance companies, brilliant Solid Energy management, the integrity of John Banks (and by implication that of other MPs), quality education ministers, worthwhile overseas trips by the Prime Minister, 'clever' NZ First MPs and a boost for the West Coast among others. Considered from a Canterbury perspective, the drought of early 2013 becomes a symbol for many of the recent political and social ailments afflicting the land. Quantity: 1 digital cartoon(s).

Articles, UC QuakeStudies

This study analysed liquefaction susceptibility and estimated ground settlements for two earthquake scenarios (foothills and Alpine Fault) for eastern Waimakariri District. The report was later partially superseded by Earthquake hazard assessment for Waimakariri District (Yetton and McCahon, 2009), which while not using such detailed analytical methods as the 2000 Beca report, reviewed new information available since 2000 (including that collected as part of the Pegasus Town development). This showed that the liquefaction susceptibility in eastern Waimakariri district was in fact much more variable than suggested in the 2000 Beca maps, and that liquefaction susceptibility was extremely difficult to predict without a site-specific investigation. See Object Overview for background and usage information.

Articles, UC QuakeStudies

The Christchurch liquefaction study was initiated to better determine liquefaction susceptibility in Christchurch city. It aimed to improve on earlier liquefaction susceptibility maps, which were based on soil type and distribution, by incorporating soil strength data into liquefaction analysis. This stage of the study included collating available geological and geotechnical data from Environment Canterbury and Christchurch City Council into a database, modelling liquefaction hazard and ground damage and presenting these as maps. The report contains many recommendations, which were taken up in subsequent stages of the study. (Note that the results of Stage 1 of the Christchurch liquefaction study were provided to Environment Canterbury as a letter rather than a report. This was a summary of work completed to 30 June 2001, including a review of geological and geotechnical data available within Environment Canterbury and Christchurch City Council records.) See Object Overview for background and usage information.

Articles, UC QuakeStudies

This study determined areas of different liquefaction susceptibility in Hurunui District based mainly on geological data, with some limited borehole strata interpretation. Geotechnical data was not analysed. This was the same method used in the earthquake hazard assessments for engineering lifelines in other districts in Canterbury. Hurunui District was the first district that a hazard assessment for engineering lifelines was undertaken for (in 2000) and it did not include a liquefaction susceptibility map like the other district earthquake hazard assessments did. There are no recommendations associated with this report. See Object Overview for background and usage information.

Articles, UC QuakeStudies

Stage IV of the Christchurch liquefaction study updated the Stage II liquefaction hazard and ground damage maps with further data collected from other organisations, and included two additional maps indicating liquefaction sensitivity to groundwater levels. Stage IVa of the Christchurch liquefaction study used revised groundwater levels and adjustments to the liquefaction prediction algorithm. The outputs of the report were liquefaction hazard and ground damage maps for both average summer (low) and average winter (high) groundwater levels. The maps produced as part of Stage IVa of the report were subsequently included in an Environment Canterbury public education poster The Solid Facts on Christchurch Liquefaction which also contained information on how liquefaction occurs and what can be done to mitigate the liquefaction hazard. Stage IV of the Christchurch liquefaction study contained a number of recommendations to improve the liquefaction potential and ground damage maps for Christchurch. See Object Overview for background and usage information.

Articles, UC QuakeStudies

This report was the first report in the district series, and has a different format to later reports. It includes all natural hazards, not only earthquake hazards. It describes earthquake, flooding, meteorological, landslide and coastal hazards within Hurunui district and gives details of historic events. It includes district-scale (1:250,000) active fault and flood hazard maps. The report describes an earthquake scenario for a magnitude 6.9 earthquake near Cheviot, as well as flooding, meteorological, landslide, coastal erosion, storm surge, and tsunami scenarios.

Articles, UC QuakeStudies

This report provides information on the locations and character of active geological faults and folds in Ashburton District. The faults are mapped at a district scale and the information is intended to highlight areas where there is a risk of permanent fault movement at the ground surface, and where more detailed investigations should be done if development is proposed in that area (depending on the potential activity of the fault and the type of development proposed). See Object Overview for background and usage information. Most of the faults and folds identified at the ground surface in Ashburton District are in rural or very sparsely populated areas. In addition, most of the faults have relatively long recurrence intervals (long-term average time between fault movements) in the order of several thousand years. Following the Ministry for the Environment Active Fault Guidelines, normal residential development would be allowed on or near faults with recurrence intervals this long. There are no recommendations associated with this report. The information in the report will be reviewed as required, after the remaining district reports are completed in the region.