Search

found 1672 results

Images, UC QuakeStudies

A car drives onto the damaged Dallington bridge. The bridge has visibly moved relative to the road, there is a large gap at the side of the bridge, and the railings are warped. The photographer comments, "Dallington Bridge northern approach, Gayhurst Rd".

Articles, UC QuakeStudies

A plan which defines the procurement activities to be applied to SCIRT and explains how those activities are to be undertaken to meet SCIRT objectives and requirements. The first version of this plan was produced on 14 September 2011.

Images, UC QuakeStudies

A photograph of the platform for the Townsend Telescope amongst the rubble of the Observatory tower at the Christchurch Arts Centre. The tower collapsed during the 22 February 2011 earthquake, severely damaging the telescope.

Articles, UC QuakeStudies

A plan which describes how SCIRT will manage the coordination of utility authority liaison and utility relocation or protection during the design and construction phases of the rebuild schedule. The first version of this plan was produced on 15 November 2011.

Images, UC QuakeStudies

University of Canterbury students attend a lecture in a tent while lecture theatres were closed for structural testing. The photographer comments, "The University restarts its teaching, and the techies in e-learning move out of NZi3. Lectures in progress in UC's tent village".