A copy of the CanCERN online newsletter published on 27 January 2012
An entry from Deb Robertson's blog for 23 June 2011 entitled, "Living in the red zone...".
This paper analyses the city of Christchurch, New Zealand, which has been through dramatic changes since it was struck by a series of earthquakes of different intensities between 2010 and 2011. The objective is to develop a deeper understanding of resilience by looking at changes in green and grey infrastructures. The study can be helpful to reveal a way of doing comparative analysis using resilience as a theoretical framework. In this way, it might be possible to assess the blueprint of future master plans by considering how important the interplay between green and grey infrastructure is for the resilience capacity of cities.
Summary of oral history interview with Amber Henderson about her experiences of the Canterbury earthquakes.
Transcript of Robyn Anderson's earthquake story, captured by the UC QuakeBox project.
Transcript of participant number LY960's earthquake story, captured by the UC QuakeBox project.
Transcript of Dr Niall Hamilton's earthquake story, captured by the UC QuakeBox project.
A copy of the CanCERN online newsletter published on 15 February 2013
A copy of the CanCERN online newsletter published on 9 May 2014
A copy of the CanCERN online newsletter published on 18 April 2014
A copy of the CanCERN online newsletter published on 4 October 2013
An entry from Deb Robertson's blog for 5 August 2011 entitled, "A birthday quilt for nana....".
The increase in urban population has required cities to rethink their strategies for minimising greenhouse gas impacts and adapting to climate change. While urban design and planning policy have been guided by principles such as walkability (to reduce the dependence on cars) and green infrastructure (to enhance the quality of open spaces to support conservation and human values), there have been conflicting views on what spatial strategies will best prepare cities for a challenging future. Researchers supporting compact cities based upon public Transit Oriented Development have claimed that walkability, higher density and mixed-uses make cities more sustainable (Owen, 2009) and that, while green spaces in cities are necessary, they are dull in comparison with shopfronts and street vendors (Speck, 2012, p 250). Other researchers claim that green infrastructure is fundamental to improving urban sustainability and attracting public space users with improved urban comfort, consequently encouraging walkability (Pitman and Ely, 2013). Landscape architects tend to assume that ‘the greener the better’; however, the efficiency of urban greenery in relation to urban comfort and urbanity depends on its density, distribution and the services provided. Green infrastructure can take many forms (from urban forests to street trees) and provide varied services (amended microclimate, aesthetics, ecology and so forth). In this paper, we evaluate the relevance of current policy in Christchurch regarding both best practice in green infrastructure and urban comfort (Tavares, 2015). We focus on the Christchurch Blueprint for rebuilding the central city, and critically examine the post-earthquake paths the city is following regarding its green and grey infrastructures and the resulting urban environment. We discuss the performance and appropriateness of the current Blueprint in post-earthquake Christchurch, particularly as it relates to the challenges that climate change is creating for cities worldwide.
Summary of oral history interview with Caroline about her experiences of the Canterbury earthquakes.
A copy of the CanCERN online newsletter published on 20 December 2013
A copy of the CanCERN online newsletter published on 7 March 2014
A copy of the CanCERN online newsletter published on 31 January 2014
Summary of oral history interview with Belinda Grant about her experiences of the Canterbury earthquakes.
Transcript of Lavina's earthquake story, captured by the UC QuakeBox project.
Summary of oral history interview with Kirsten Rennie about her experiences of the Canterbury earthquakes.
A photograph captioned by BeckerFraserPhotos, "A section of Avonside Drive shows how the infrastructure is no longer maintained to the same level, with regard to roading, sewage and water services. The houses behind show the crazy angles that the earth movement has left them at".
Transcript of Ann's earthquake story, captured by the UC QuakeBox project.
A photograph captioned by BeckerFraserPhotos, "A section of Avonside Drive shows how the infrastructure is no longer maintained to the same level, with regard to roading, sewage and water services. Even the grass on the banks of the River Avon is no longer mown as regularly".
Summary of oral history interview with Sharon Torstonson about her experiences of the Canterbury earthquakes.
Objectives • To develop a system dynamics model of Christchurch post-quake reconstruction process that captures all the critical dynamics influencing its pathway • To investigate the implications of current rebuild pathway • To build a reconstruction module to be integrated in MERIT (Measuring the Economics of Resilient Infrastructure Tool)
Transcript of Tony Dowson's earthquake story, captured by the UC QuakeBox project.
This paper shows an understanding of the availability of resources in post-disaster reconstruction and recovery in Christchurch, New Zealand following its September 4, 2010 and February 22, 2011 earthquakes. Overseas experience in recovery demonstrates how delays and additional costs may incur if the availability of resources is not aligned with the reconstruction needs. In the case of reconstruction following Christchurch earthquakes, access to normal resource levels will be insufficient. An on-line questionnaire survey, combined with in-depth interviews was used to collect data from the construction professionals that had been participated in the post-earthquake reconstruction. The study identified the resources that are subject to short supply and resourcing challenges that are currently faced by the construction industry. There was a varied degree of impacts felt by the surveyed organisations from resource shortages. Resource pressures were primarily concentrated on human resources associated with structural, architectural and land issues. The challenges that may continue playing out in the longer-term reconstruction of Christchurch include limited capacity of the construction industry, competition for skills among residential, infrastructure and commercial sectors, and uncertainties with respect to decision making. Findings provide implications informing the ongoing recovery and rebuild in New Zealand. http://www.iiirr.ucalgary.ca/Conference-2012
Numerous rockfalls released during the 2010–2011 Canterbury earthquake sequence affected vital road sections for local commuters. We quantified rockfall fatality risk on two main routes by adapting a risk approach for roads originally developed for snow avalanche risk. We present results of the collective and individual fatality risks for traffic flow and waiting traffic. Waiting traffic scenarios particularly address the critical spatial-temporal dynamics of risk, which should be acknowledged in operational risk management. Comparing our results with other risks commonly experienced in New Zealand indicates that local rockfall risk is close to tolerability thresholds and likely exceeds acceptable risk.
A PDF copy of the six signs that together read, "Share the love." The signs were used at the 'Outrageous Burst of All Right: Bacon Bombing' in December 2013. This saw team members from All Right? dress up as bacon butties and provide bacon butties for SCIRT workers. From allright.org.nz: SCIRT workers are tasked with the enormous job of rebuilding and repairing the damaged underground infrastructure and roads. With the help of Hellers and an anonymous giant bacon buttie, the All Right? team visited several SCIRT sites in December 2013 to show the workers a bit of (rather unusual) love. For photographs from the event, see: https://quakestudies.canterbury.ac.nz/store/object/21635
The Canterbury region of New Zealand experienced a sequence of strong earthquakes during 2010-2011. Responses included government acquisition of many thousands of residential properties in the city of Christchurch in areas with severe earthquake effects. A large and contiguous tract of this ‘red zoned’ land lies in close proximity to the Ōtākaro / Avon River and is known as the Avon-Ōtākaro Red Zone (AORZ). The focus of this study was to provide an overview of the floodplain characteristics of the AORZ and review of international experience in ecological restoration of similar river margin and floodplain ecosystems to extract restoration principles and associated learnings. Compared to pre-earthquake ground levels, the dominant trend in the AORZ is subsidence, together with lateral movement especially in the vicinity of waterway. An important consequence of land subsidence in the lower Ōtākaro / Avon River is greater exposure to flooding and the effects of sea level rise. Scenario modelling for sea level rise indicates that much of the AORZ is exposed to inundation within a 100 year planning horizon based on a 1 m sea level rise. As with decisions on built infrastructure, investments in nature-based ‘green infrastructure’ also require a sound business case including attention to risks posed by climate change. Future-proofing of the expected benefits of ecological restoration must therefore be secured by design. Understanding and managing the hydrology and floodplain dynamics are vital to the future of the AORZ. However, these characteristics are shared by other floodplain and river restoration projects worldwide. Identifying successful approaches provides a useful a source of useful information for floodplain planning in the AORZ. This report presents results from a comparative case study of three international examples to identify relevant principles for large-scale floodplain management at coastal lowland sites.