The quake-damaged facade of the Baptist Church at the Kilmore Street / Madras Street intersection being propped up while repairs are in progress.
The quake-damaged facade of the Baptist Church at the Kilmore Street / Madras Street intersection being propped up while repairs are in progress.
Time stands still on the Science Museum clock tower as a poignant reminder of the moment the trembler struck Christchurch in the early hours of Saturday 4 September 2010.
The quake-damaged facade of the Baptist Church at the Kilmore Street / Madras Street intersection being propped up while repairs are in progress.
The quake-damaged facade of the Baptist Church at the Kilmore Street / Madras Street intersection being propped up while repairs are in progress.
Time stands still on the Science Museum clock tower as a poignant reminder of the moment the trembler struck Christchurch in the early hours of Saturday 4 September 2010.
Makes sense that the end of the detour is where the road closes, right? msh1014: 12. Dead End
The South New Brighton Domain jetty into the Avon-Heathcote Estuary. A new jetty replaced an older one about 6-8 years ago, then the earthquakes happened! Before the earthquakes it was straight and level and open!
Helicopter Flight over Christchurch New Zealand
None
Helicopter Flight over Christchurch New Zealand
None
Very sad - was a nice looking building. This is near the top of the building and there is signs of the top being displaced horizontally.
The window that was hanging precariously finally fell when the Boxing Day 4.9 shock hit at 10.30am
The Crown Masonic Centre damaged in the 6.3 earthquake that hit Christchurch 22/02/11
Cordon Barrier on Manchester Street South as the clean-up of the CBD continues after the 6.3 earthquake hit Christchurch 22 February 2011.
Christchurch's old central city police station building will now be demolished on Sunday by implosion. Another one of Christchurch recognisable buildings to be given a death sentence following the earthquakes of 2010/2011. Photo by Geoff Trotter at www.dreamdreams.co.nz
Sadly the Chapel has been badly damaged in the magnitude 6.3 earthquake that hit Christchurch 22 February 2011. See below. The Rose Historic Chapel formerly St Mary’s Convent Chapel is the sole survivor of a group of heritage buildings in Christchurch that once comprised the St Mary’s Convent complex for the Sisters of Mercy in North Colombo St...
Rugby World Cup 2011 (RWC 2011) Tournament partners have reluctantly announced that Christchurch will be unable to host the seven matches currently scheduled to be played at the AMI/Lancater Park Stadium in Christchurch. This follows a detailed assessing of damage to the Stadium, grounds and infrastructure caused by the 6.3 magnitude earthquake ...
Revealed after the SoulFood Cafe building was demolished - Haircutting for 6d and a shave for thruppence? how old is this?
20100904_3313_1D3-24 Anzac Drive, Christchurch earthquake Kenta with crack in ANZAC Drive #372
Nearing the end of demolition of the Westend Jewellers site on the corner of Worcester and Manchester Streets, Christchurch. Badly damaged in the September 4th earthquake.
Nearly two weeks after the 7.1 earthquake, and a week after demolition started, this is the end of The Valley Inn in Heathcote.
After the liquefaction has been cleaned up we have piles of the stuff on our streets waiting for the council to pick it up. This little Gnome is obviously doing its bit as Christchurch cleans up after the 6.3 magnitude quake 22 February 2011.
"Open Theatre" - The Odeon Built in 1883 and known as the Tuam Street Hall or Theatre and was New Zealand's oldest masonry, purpose built theatre. In 1930, it became the St. James Theatre, It became The Odeon Movie Theatre in 1960. Demolition started in September 2012 after the Christchurch earthquakes of 2010/2011 but seems to have stopped!?
Christ Church Cathedral has been granted a stay of execution after a High-Court ruling today to stop the planned demolition of the earthquake-damaged Christchurch central landmark.
Post the earthquakes land has sunk and in this case the track is below high tide level. It would have been at least 500mm above the highest tide level prior to the recent earthquakes that started on 04/09/10.
Photo taken Jan 2011 as the church is demolished.
Photo taken Jan 2011 as the church is demolished.
None