Search

found 1342 results

Images, Alexander Turnbull Library

In six small cameos Prime Minister John Key ponders over things economic and ends up dancing; he says 'I'm bereft of ideas for the economy gambling the lives of our troops in the Afghanistan mess I'm presiding over the biggest budget deficit in our history borrowing $300m a week to cushion our slide into oblivion Using lots of World Cup piffle to distract from the real issues Yet I'm still rating miles higher than Goff so how hopeless is he??? A little man in the last frame comments 'Spoiled for choice eh?' Context - New Zealand's rather dire economic situation made so much worse by the Christchurch earthquakes of 4 September 2010 and 22 February 2011, the consistently high poll rating of John Key and the series of disasters suffered by the Labour Party in the run up to the 2011 election in November. Quantity: 1 digital cartoon(s).

Audio, Radio New Zealand

Our Christchurch correspondent, Katy Gosset takes us on a musical journey with the help of one of the city's longest serving pianists. For 23 years Peter Lewis played the piano in the Crowne Plaza Hotel before being made redundant by the February 2011 earthquake. Peter has since struggled to find a way to share his music with others. Today Katy seeks out some city pianos and takes him on a mystery tour to rediscover the pleasure of playing.

Audio, Radio New Zealand

Twelve years after the CTV building collapsed during the Christchurch earthquake, families of the victims killed inside have told an engineering disciplinary hearing they want justice and accountability. 115 people died when the six-storey building came down in February 2011. A complaint against an engineer whose firm designed the building is being heard by an Engineering New Zealand disciplinary committee. Dr Alan Reay lost a High Court bid to stop the hearing. Anna Sargent reports.

Research papers, University of Canterbury Library

The Christchurch earthquake sequence has been on-going since September 4th 2010. The largest two earthquakes, magnitude (M) 7.1 on September 4th and the M 6.3 on February 22nd 2011 caused immediate and significant damage to the city of Christchurch. As a consequence of the earthquakes, the tourism sector in the Canterbury region has been heavily impacted, with broader impacts being felt throughout the South Island. Resilient Organisations and the University of Canterbury began a series of quantitative investigations into the recovery and response of key business sectors to the earthquakes. The purpose of this study was to build on this work by exploring the outcomes of the earthquakes on the tourism sector, a critical economic driver in the region. Two postal surveys were sent to 719 tourism business managers; the first to businesses in the ‘Impact Zone’ defined as areas that experienced Modified Mercalli intensities greater than 6. The second survey was sent to the remaining businesses throughout the Canterbury region (‘Rest of Canterbury’). Response rates were 46% response for the Impact Zone, and 29% for the Rest of Canterbury. Key findings:

Audio, Radio New Zealand

Questions to Ministers 1. Hon RODNEY HIDE to the Acting Minister of Energy and Resources: Does she accept her Ministry's advice that the value of New Zealand's onshore minerals excluding hydrocarbons is $194 billion overall with $80 billion estimated in Schedule 4 land; if so, what plans does the Government have to allow their development? 2. Hon PHIL GOFF to the Minister for the Rugby World Cup: What advice has the Prime Minister, the Government or Rugby New Zealand 2011 been given on Christchurch's ability to host Rugby World Cup matches later this year? 3. CHESTER BORROWS to the Minister of Finance: What reports has he received on the economy's prospects after New Zealand meets the immediate challenges of the Christchurch earthquake? 4. Hon DAVID CUNLIFFE to the Minister for Communications and Information Technology: Would he indicate his agreement to a further extension, if it were required, to the report back date for the Telecommunications (TSO, Broadband and Other Matters) Amendment Bill? 5. TE URUROA FLAVELL to the Minister of Agriculture: Is he concerned to learn that New Zealand's first majority Māori-owned dairy company, Miraka, has reportedly stated that there is a serious risk that Fonterra's proposed Trading Among Farmers exchange will be illiquid, volatile and unstable; if so, what assurances can he give Miraka and other dairy processors and industry groups, that anti-competitive behaviour will not be tolerated? 6. Hon DAVID PARKER to the Acting Minister for Economic Development: Has he been advised by the Prime Minister whether his appointment as Acting Minister for Economic Development is temporary or expected to carry on to the election? 7. JO GOODHEW to the Minister of Education: What progress has been made on re-opening Christchurch schools and early childhood education centres since the 22 February earthquake? 8. GRANT ROBERTSON to the Minister of Health: Does he favour the sale of any public hospitals in New Zealand; if so, which one or ones? 9. SIMON BRIDGES to the Minister for Building and Construction: What advice has he received from the Department of Building and Housing regarding last month's Christchurch earthquake? 10. DARIEN FENTON to the Minister of Labour: What factors did she consider in deciding to increase the minimum wage by 25 cents from 1 April in her latest review? 11. CHRIS TREMAIN to the Minister of Transport: What progress has been made on roading projects in the Hawke's Bay region? 12. GARETH HUGHES to the Minister of Finance: What steps, if any, is he taking to reduce New Zealand's economic vulnerability that stems from dependence on oil? Questions to Members 1. Hon DAVID CUNLIFFE to the Chairperson of the Finance and Expenditure Committee: How many submissions have been received so far on the Telecommunications (TSO, Broadband and Other Matters) Amendment Bill? 2. Hon DAVID CUNLIFFE to the Chairperson of the Finance and Expenditure Committee: How many submitters on the Telecommunications (TSO, Broadband and Other Matters) Amendment Bill have requested an oral hearing? 3. Hon DAVID CUNLIFFE to the Chairperson of the Finance and Expenditure Committee: Is he aware of any complaints about times allocated to submitters on the Telecommunications (TSO, Broadband and Other Matters) Amendment Bill?

Research papers, University of Canterbury Library

Disasters that significantly affect people typically result in the production of documents detailing disaster lessons. This was the case in the 2010 and 2011 Canterbury earthquakes, as government and emergency response agencies, community organisations, and the media, engaged in the practice of producing and reporting disaster lessons. This thesis examines the disaster lessons that were developed by emergent groups following the Canterbury earthquakes (4 September 2010 and 22 February 2011). It adopts a Foucauldian analysis approach to investigate both the construction of disaster lessons and to document how this practice has come to dominate postdisaster activity following the Canterbury earthquakes. The study involved an analysis of academic literature, public documents and websites and interviews with key members of a range of Canterbury based emergent community groups. This material was used to generate a genealogy of disaster lessons, which was given in order to generate an account of how disaster lessons emerged and have come to dominate as a practice of disaster management. The thesis then examines the genealogy through the concept of governmentality so as to demonstrate how this discourse of disaster lessons has come to be used as a governing rationale that shapes and guides the emergent groups conduct in postdisaster New Zealand.

Research Papers, Lincoln University

Though there is a broad consensus that communities play a key role in disaster response and recovery, most of the existing work in this area focuses on the activities of donor agencies, formal civil defence authorities, and local/central government. Consequently, there is a paucity of research addressing the on-going actions and activities undertaken by communities and ‘emergent groups’ , particularly as they develop after the immediate civil defence or ‘response’ phase is over. In an attempt to address this gap, this inventory of community-led recovery initiatives was undertaken approximately one year after the most devastating February 2011 earthquake. It is part of on-going project at Lincoln University documenting – and seeking a better understanding of - various emergent communities’ roles in recovery, their challenges, and strategies for overcoming them. This larger project also seeks to better understand how collaborative work between informal and formal recovery efforts might be facilitated at different stages of the process. This inventory was conducted over the December 2011 – February 2012 period and builds on Landcare Research’s Christchurch Earthquake Activity Inventory which was a similar snapshot taken in April 2011. The intention behind conducting this updated inventory is to gain a longitudinal perspective of how community-led recovery activities evolve over time. Each entry is ordered alphabetically and contact details have been provided where possible. A series of keywords have also been assigned that describe the main attributes of each activity to assist searches within this document.This inventory was supported by the Lincoln University Research Fund and the Royal Society Marsden Fund.

Research Papers, Lincoln University

The disastrous earthquakes that struck Christchurch in 2010 and 2011 seriously impacted on the individual and collective lives of Māori residents. This paper continues earlier, predominantly qualitative research on the immediate effects on Māori by presenting an analysis of a survey carried out 18 months after the most destructive event, on 22 February 2011. Using a set-theoretic approach, pathways to Māori resilience are identified, emphasising the combination of whānau connectivity and high incomes in those who have maintained or increased their wellbeing post-disaster. However, the results show that if resilience is used to describe a “bounce back” in wellbeing, Māori are primarily enduring the post-disaster environment. This endurance phase is a precursor to any resilience and will be of much longer duration than first thought. With continued uncertainty in the city and wider New Zealand economy, this endurance may not necessarily lead to a more secure environment for Māori in the city.

Images, Alexander Turnbull Library

Governor of the Reserve Bank Allan Bollard holds a spade over his shoulder and a roll of toilet paper in his hand. Text reads 'Reserve Bank governor moves to restore confidence after the quake -' and Bollard says '..past the silver beet, left at the last of the beans and it's right by the caulis!' The little Evans man says 'What a relief!' Context - Two earthquakes and hundreds of aftershocks have hit Christchurch, the first on 4 September 2010 and a second more devastating one on 22 February 2011. Toilets have been a real problem after the earthquakes with thousands of chemical toilets and portaloos being shipped in - some people, however, use the old kiwi method of digging a long-drop in the back garden. The Reserve Bank has made a relatively large 50-point cut in its benchmark interest rate, the Official Cash Rate (from 3% to 2.5 per cent). Critics say that inflation is already running unacceptably high and there is a threat of much higher inflation in a year or two when the rebuilding of Christchurch begins to put pressure on limited resources. The Reserve Bank acknowledged these factors, but it has chosen instead to focus on the immediate impact of the earthquake on the economy and particularly on all-important business and consumer sentiment. (Press editorial 12 March 2011) Colour and black and white versions available Quantity: 2 digital cartoon(s).

Research papers, University of Canterbury Library

The Canterbury region of New Zealand experienced four earthquakes greater than MW 6.0 between September 2010 and December 2011. This study employs system dynamics as well as hazard, recovery and organisational literature and brings together data collected via surveys, case studies and interviews with organisations affected by the earthquakes. This is to show how systemic interactions and interdependencies within and between industry and geographic sectors affect their recovery post-disaster. The industry sectors in the study are: construction for its role in the rebuild, information and communication technology which is a regional high-growth industry, trucking for logistics, critical infrastructure, fast moving consumer goods (e.g. supermarkets) and hospitality to track recovery through non-discretionary and discretionary spend respectively. Also in the study are three urban centres including the region’s largest Central Business District, which has been inaccessible since the earthquake of 22 February 2011 to the time of writing in February 2013. This work also highlights how earthquake effects propagated between sectors and how sectors collaborated to mitigate difficulties such as product demand instability. Other interacting factors are identified that influence the recovery trajectories of the different industry sectors. These are resource availability, insurance payments, aid from central government, and timely and quality recovery information. This work demonstrates that in recovering from disaster it is crucial for organisations to identify what interacting factors could affect their operations. Also of importance are efforts to reduce the organisation’s vulnerability and increase their resilience to future crises and in day-to-day operations. Lastly, the multi-disciplinary approach to understanding the recovery and resilience of organisations and industry sectors after disaster, leads to a better understanding of effects as well as more effective recovery policy.

Audio, Radio New Zealand

Thousands of Christchurch refugees have poured into Timaru since the earthquake on February 22, boosting its population by nearly 20 per cent. Social services are giving out hundreds of food parcels, blankets, toiletries and clothes every day as well as finding accommodation for people who have turned up in town with nothing. Major Dean Herring of the Salvation Army in Timaru has been helping evacuees find places to live as well as dealing with the huge piles of donated goods.

Research Papers, Lincoln University

There is a critical strand of literature suggesting that there are no ‘natural’ disasters (Abramovitz, 2001; Anderson and Woodrow, 1998; Clarke, 2008; Hinchliffe, 2004). There are only those that leave us – the people - more or less shaken and disturbed. There may be some substance to this; for example, how many readers recall the 7.8 magnitude earthquake centred in Fiordland in July 2009? Because it was so far away from a major centre and very few people suffered any consequences, the number is likely to be far fewer than those who remember (all too vividly) the relatively smaller 7.1 magnitude Canterbury quake of September 4th 2010 and the more recent 6.3 magnitude February 22nd 2011 event. One implication of this construction of disasters is that seismic events, like those in Canterbury, are as much socio-political as they are geological. Yet, as this paper shows, the temptation in recovery is to tick boxes and rebuild rather than recover, and to focus on hard infrastructure rather than civic expertise and community involvement. In this paper I draw upon different models of community engagement and use Putnam’s (1995) notion of ‘social capital’ to frame the argument that ‘building bridges’ after a disaster is a complex blend of engineering, communication and collaboration. I then present the results of a qualitative research project undertaken after the September 4th earthquake. This research helps to illustrate the important connections between technical rebuilding, social capital, recovery processes and overall urban resilience.

Videos, UC QuakeStudies

A video about the reopening of the city branch of the Punting on the Avon route, which has been closed since the 22 February 2011 earthquake. The video includes an interview with Mayor Bob Parker about tourism in Christchurch. He mentions that Australia has updated its travel advisory on Christchurch to say that it is as safe as the other cities in New Zealand. The video also includes footage of Parker poling a punt.

Videos, UC QuakeStudies

A video about the reopening of the trams in Christchurch after the 22 February 2011 earthquake. The video includes an interview with tram driver Brian Erikson. Erikson talks about taking a job at a supermarket while the trams were closed, and the feeling he gets when he drives the trams. The video also includes an interview with Syleyman Sekman, whose son, Jubiter Ubukata Sekman, could not sleep because he was so excited to ride the trams again.

Research papers, University of Canterbury Library

The Canterbury earthquake and aftershock sequence in New Zealand during 2010-2011 subjected the city’s structures to a significant accumulated cyclic demand and raised significant questions regarding the low-cycle fatigue demands imposed upon the structures. There is a significant challenge to quantify the level of cumulative demand imposed on structures and to assess the percentage of a structure's fatigue life that has been consumed as a result of this earthquake sequence. It is important to be able to quantify the cumulative demand to determine how a building will perform in a subsequent large earthquake and inform repair and re-occupancy decisions. This paper investigates the cumulative fatigue demand for a structure located within the Christchurch Central Business District (CBD). Time history analysis and equivalent cycle counting methods are applied across the Canterbury earthquake sequence, using key events from September 4th 2010 and February 22nd , 2011 main shocks. The estimate of the cumulative fatigue demand is then compared to the expected capacity of a case study reinforced concrete bridge pier, to undertake a structure-specific fatigue assessment. The analysis is undertaken to approximate the portion of the structural fatigue capacity that has been consumed, and how much residual capacity remains. Results are assessed for recordings at the four Christchurch central city strong motion recording sites installed by the GeoNet programme, to provide an estimate of variation in results. The computed cyclic demand results are compared to code-based design methods and as assessment of the inelastic displacement demand of the reinforcing steel. Results are also presented in a fragility context where a de minimis (inconsequential), irreparable damage and full fatigue fracture are defined to provide a probabilistic assessment of the fatigue damage incurred. This methodology can provide input into the overall assessment of fatigue demands and residual capacity.

Videos, UC QuakeStudies

A video of interviews with four enterprising young Christchurch residents recorded two years after the 22 February 2011 earthquake. The video includes interviews with Gap Filler Director Coralie Winn, Arts Centre Director Andrew Lovatt, artist Mike Hewson, and Student Volunteer Army leader Jason Pembleton. The interviewees are asked four questions: 'What do you think Christchurch city centre will look like in 10 years?', 'What do you most want to see in the new city?', 'What do you miss most about the old city?', and 'What keeps you in Christchurch?'.

Audio, Radio New Zealand

1. Hon PHIL GOFF to the Prime Minister: Does he have confidence in his Minister of Finance? 2. CRAIG FOSS to the Minister of Finance: How much does the Government expect to spend over the next few years to help rebuild Christchurch in the aftermath of the two earthquakes? 3. Hon ANNETTE KING to the Minister for Social Development and Employment: Does she stand by her statement in regard to hardship assistance that "…I think it proves that the help is there when people need it,"; if so, why? 4. RAHUI KATENE to the Minister of Health: What action, if any, has been taken in light of the study Ethnicity and Management of Colon Cancer in New Zealand: Do Indigenous Patients Get a Worse Deal?, which concluded that Māori New Zealanders with colon cancer were less likely to receive adjuvant chemotherapy and experienced a lower quality of care compared with non-Māori patients? 5. CHRIS AUCHINVOLE to the Minister for the Environment: What steps is the Government taking to increase renewable electricity generation in light of reports that greenhouse gas emissions from this sector have increased by 120 percent, which is more than any other sector since 1990? 6. Hon CLAYTON COSGROVE to the Minister of Finance: Excluding the banks and non-bank financial institutions covered by the deposit guarantee scheme, are there any other companies that might be provided with a government guarantee while the Rt Hon John Key is Prime Minister? 7. JONATHAN YOUNG to the Acting Minister of Energy and Resources: What is Petrobras able to do under the permit granted to it in the Raukumara Basin? 8. DAVID CLENDON to the Acting Minister of Energy and Resources: What environmental protection provisions, if any, did the Government include in the permit granted to Petrobras to explore for oil and drill off the East Cape? 9. Hon TREVOR MALLARD to the Prime Minister: Does he have confidence in all Ministers involved in the Mediaworks frequency payment arrangement? 10. AARON GILMORE to the Minister of Revenue: What has Inland Revenue done to assist the people in Christchurch after the February earthquake? 11. GRANT ROBERTSON to the Minister responsible for Ministerial Services: Does he stand by his statements in relation to the purchase of 34 BMWs by Ministerial Services, including one with heated seats, that "Yeah I don't know what's in Dunedin" and "It's beyond me, it's not my car anyway"? 12. SHANE ARDERN to the Minister of Fisheries and Aquaculture: What has been the result of enforcement action taken by the Ministry of Fisheries under Operation Paid and Taskforce Webb?

Audio, Radio New Zealand

If you've used your eftpos card, caught a bus or taxi, taken a photo on your smartphone or mapped a run or walk then you've probably used GPS - the global positioning system developed by the US military. Christchurch city council is using location technology to keep tabs on the city's rubbish bins. With nearly half a million wheelie bins in circulation, it's hoping to track down 16.000 wheelie bins that are missing following the February 2011 earthquake.

Audio, Radio New Zealand

Matthew McEachen should have had most of his life ahead of him when he died on February 22, 2011. The 25-year-old was a talented artist and designer, putting his skills to good use at the Southern Ink tattoo shop on Colombo St. But when the earthquake struck, Bruce, Jeanette and Sarah McEachen lost their much-loved son and older brother. Ten years on, Matti's legacy lives on. Checkpoint reporter Nick Truebridge and cameraman Nate McKinnon with his story.

Research papers, University of Canterbury Library

There has not been substantial research conducted in the area of fraud and natural disasters. Therefore, this study sought to examine the perceptions of Canterbury residents toward the recovery process following the September 2010 and February 2011 earthquakes and whether residents felt as though contractor fraud occurs in Canterbury. A questionnaire was developed to gauge information about Canterbury residents’ self-reports involving the earthquakes, specific contractors involved, parties involved with the recovery process in general, and demographic information. Participants included a total of 213 residents from the Canterbury region who had been involved with contractors and/or insurance companies due to the recovery process. Results indicated that a high percentage of the participants were not satisfied with the recovery process and that almost half of the participants reported feeling scammed by contractors in Canterbury after the 2010 and 2011 earthquakes. Moreover, the results indicate that participants neither agreed with the assessments made about their property losses nor the plans made to recover their properties. In many cases, participants felt pressured and even reluctant to accept these assessments and/or plans. The present study does not seek to explain why contractor fraud exists or what motivates scammers. Conversely, it attempts to demonstrate the perceptions of contractor fraud and satisfaction that have taken place in the aftermath of the Canterbury earthquakes.

Research papers, University of Canterbury Library

The collapse of Redcliffs’ cliff in the 22 February 2011 and 13 June 2011 earthquakes were the first times ever a major failure incident occurred at Redcliffs in approximately 6000 years. This master’s thesis is a multidisciplinary engineering geological investigation sought to study these particular failure incidents, focusing on collecting the data necessary to explain the cause and effect of the cliff collapsing in the event of two major earthquakes. This study provides quantitative and qualitative data about the geotechnical attributes and engineering geological nature of the sea-cut cliff located at Redcliffs. Results from surveying the geology of Redcliffs show that the exposed lithology of the cliff face is a variably jointed rock body of welded and (relatively intact) unwelded ignimbrite, a predominantly massive unit of brecciated tuff, and a covering of wind-blown loess and soil deposit (commonly found throughout Canterbury) on top of the cliff. Moreover, detailing the external component of the slope profile shows that Redcliffs’ cliff is a 40 – 80 m cliff with two intersecting (NE and SE facing) slope aspects. The (remotely) measured geometry of the cliff face comprises of multiple outstanding gradients, averaging a slope angle of ~67 degrees (post-13 June 2011), where the steepest components are ~80 degrees, whereas the gentle sloping sections are ~44 degrees. The physical structure of Redcliffs’ cliff drastically changed after each collapse, whereby seismically induced alterations to the slope geometry resulted in material deposited on the talus at the base of the cliff. Prior to the first collapse, the variance of the gradient down the slope was minimal, with the SE Face being the most variable with up to three major gradients on one cross section. However, after each major collapse, the variability increased with more parts of the cliff face having more than one major gradient that is steeper or gentler than the remainder of the slope. The estimated volume of material lost as a result of the gradient changes was 28,267 m³ in February and 11,360 m³ in June 2011. In addition, surveys of the cliff top after the failure incidents revealed the development of fissures along the cliff edge. Monitoring 10 fissures over three months indicated that fissured by the cliff edge respond to intense seismicity (generally ≥ Mw 4) by widening. Redcliffs’ cliff collapsed on two separate occasions as a result of an accumulated amount of damage of the rock masses in the cliff (caused by weathering and erosion over time), and two Mw 6.2 trigger earthquakes which shook the Redcliffs and the surrounding area at a Peak Ground Acceleration (PGA) estimated to be around 2 g. The results of the theoretical study suggests that PGA levels felt on-site during both instances of failure are the result of three major factors: source of the quake and the site affected; topographic amplification of the ground movement; the short distance between the source and the cliff for both fault ruptures; the focus of seismic energy in the direction of thrust faulting along a path that intercepts Redcliffs (and the Port Hills). Ultimately, failure on the NE and SE Faces of Redcliffs’ cliff was concluded to be global as every part of the exposed cliff face deposited a significant volume of material on the talus at the base of the cliff, with the exception of one section on the NE Face. The cliff collapses was a concurrent process that is a single (non-monotonic) event that operated as a complex series of (primarily) toppling rock falls, some sliding of blocks, and slumping of the soil mantle on top of the cliff. The first collapse had a mixture of equivalent continua slope movement of the heavily weathered / damaged surface of the cliff face, and discontinuous slope movement of the jointed inner slope (behind the heavily weathered surface); whereas the second collapse resulted in only discontinuous slope movement on account of the freshly exposed cliff face that had damage to the rock masses, in the form of old and (relatively) new discontinuous fractures, induced by earthquakes and aftershocks leading up to the point of failure.

Research Papers, Lincoln University

The devastating earthquakes of September 2010 and February 2011 have without question upset the Christchurch City way of life for all. Families and businesses, as well as the natural and built environments have been directly affected, and our social landscapes have since evolved to accommodate the visible changes. Though not perhaps seen as a priority, the Christchurch nightlife has been profoundly altered by the quakes and the once popular CBD clubbing scene has ceased to exist. The concern highlighted in this article is the way in which this has put pressure on suburban bars and the the implications of this for local residents.

Audio, Radio New Zealand

Despite a hasty retreat from its iconic building in Christchurch's Square following the February earthquake, 'The Press', is in celebration mode. It's 150 years since the paper began with a six page edition that sold for six pence. It's first pages warned of the crippling cost of a new tunnel and rail line connecting Lyttelton to Christchurch, and on the back, a for sale ad for 100,000 gorse plants! Deb Nation finds the paper celebrated their centenary 50 years earlier, with memories of pigeon post and paper boys.

Videos, UC QuakeStudies

A video about the removal of 'Rocky', a 15-tonne boulder which tore through a house in Heathcote during the 22 February 2011 earthquake. The video includes an interview with Jan Kupec, Chief Geotechnical Engineer at CERA, about the dimensions and path of the boulder. It also includes interviews with James McKenzie, the manager at the Mt Hutt Ski Area who purchased the rock, and Phil Johnson, the owner of the Heathcote property who put the rock on sale.

Images, UC QuakeStudies

Two cardboard coffee cups in a takeaway tray sit on a wooden counter. The photographer comments, "What is the story of these coffees and that sad muffin? Were these an order when the earthquake struck Christchurch on 22 February 2011? Were these a workman's and a colleague's having a quick coffee break when a later aftershock caused them to leave everything behind when they fled the red zoned building, or were they just forgotten when the building was cleared out and abandoned?".

Videos, UC QuakeStudies

A video of an interview with Jenny Beecroft and Warren Beecroft about the housing shortage in Christchurch. Jenny's daughter Selena Beecroft had to move into Jenny's house with her two sons after the 22 February 2011 earthquake damaged her rental property. Selena has epilepsy and can only move into a rental property in walking distance of her work and her children's school. The family is one of many living in difficult situations despite the government's claim that there is no housing crisis in Christchurch.

Images, UC QuakeStudies

Large cracks run through the brick cladding of this house in Wainoni. The photographer comments, "During the numerous earthquakes in Christchurch the land which ran alongside the Avon river on Avonside Drive slumped towards the waterway. Houses which were wooden framed and had an external brick veneer started to sink into the liquefied soil. This caused the brick walls to crack, but the houses' occupants though shook up were saved by the wooden framework from the houses collapsing on them".

Research papers, The University of Auckland Library

This paper explores the responses by a group of children to an art project that was undertaken by a small school in New Zealand after the September 2010 and February 2011 Christchurch earthquakes. Undertaken over a period of two years, the project aimed to find a suitable form of memorialising this significant event in a way that was appropriate and meaningful to the community. Alongside images that related directly to the event of the earthquakes, the art form of a mosaic was chosen, and consisted of images and symbols that clearly drew on the hopes and dreams of a school community who were refusing to be defined by the disaster. The paper 'writes' the mosaic by placing fragments of speech spoken by the children involved in relation to ideas about memory, affect, and the 'sublime', through the work of Jean-Francois Lyotard. The paper explores the mosaic as constituted by the literal and metaphorical 'broken pieces' of the city of Christchurch in ways that confer pedagogic value inscribed through the creation of a public art space by children. AM - Accepted Manuscript

Audio, Radio New Zealand

Questions to Ministers 1. Hon PHIL GOFF to the Prime Minister: Does he have confidence in all his Ministers? 2. METIRIA TUREI to the Acting Minister of Energy and Resources: What emergency response, safety, and environmental protection provisions, if any, were included in the permit granted to Anadarko Petroleum Corporation to undertake deepwater oil exploration and drilling in the Canterbury Basin? 3. SIMON BRIDGES to the Minister of Finance: What signs are there that New Zealanders are saving more? 4. GRANT ROBERTSON to the Prime Minister: Does he have confidence in his Minister of Health? 5. JOHN HAYES to the Minister for Communications and Information Technology: What benefit will rural communities receive from the Rural Broadband Initiative signed last month? 6. SUE MORONEY to the Prime Minister: Does he have confidence in his Minister of Education? 7. MELISSA LEE to the Minister of Corrections: How are Corrections Department staff showing support for their Christchurch colleagues following the earthquake? 8. DAVID SHEARER to the Minister of Defence: Does he agree with all of the statements made by the Minister of Foreign Affairs on that Minister's use of RNZAF aircraft to travel to Vanuatu in February of this year? 9. KANWALJIT SINGH BAKSHI to the Minister of Customs: What recent reports has he received on the success of SmartGate? 10. CLARE CURRAN to the Prime Minister: Does he have confidence in the Minister for Communications and Information Technology? 11. KEITH LOCKE to the Minister of Defence: Did the New Zealand Defence Force, when preparing their response dated 2 May 2011, talk to any of the Afghan civilians interviewed by Jon Stephenson in the Metro article "Eyes Wide Shut" and seen on the subsequent 60 Minutes TV special; if so, who? 12. HONE HARAWIRA to the Acting Minister of Energy and Resources: Does the survey and drilling arrangement between the Government and Petrobras have the prior and informed consent of Te-Whanau-a-Apanui; if not, will this lack of consent breach the United Nations Declaration on the Rights of Indigenous Peoples?

Research papers, University of Canterbury Library

Following the recent earthquakes in Chile (2010) and New Zealand (2010/2011), peculiar failure modes were observed in Reinforced Concrete (RC) walls. These observations have raised a global concern on the contribution of bi-directional loading to these failure mechanisms. One of the failure modes that could potentially result from bidirectional excitations is out-of-plane shear failure. In this paper an overview of the recent experimental and numerical findings regarding out-of-plane shear failure in RC walls are presented. The numerical study presents the Finite Element (FE) simulation of wall D5-6 from the Grand Chancellor Hotel that failed in shear in the out-of-plane direction in the February 2011 Christchurch earthquake. The main objective of the numerical study was to investigate the reasons for this failure mode. The experimental campaign includes the recent experiments conducted in the Structural Engineering Laboratory of the University of Canterbury. The experimental study included three rectangular slender RC walls designed based on NZS3101: 2006-A3 (2017) for three different ductility levels, namely: nominally ductile, limited ductile and ductile. The numerical results showed that high axial load combined with bi-directional loading caused the out-of-plane shear failure in wall D5-6 from the Grand Chancellor Hotel. This was also confirmed and further investigated in the experimental phase of the study.