
The ceiling of the 10 square metre office building, soon to be Gap Filler Headquarters. Metal bracing can be seen between the wooden beams.
The construction of the 10 square metre office building which is to serve as Gap Filler Headquarters. Two men add insulation to the back wall.
The construction of the 10 square metre office building which is to serve as Gap Filler Headquarters. Two men put the walls together.
A port-a-loo standing outside The Church of Jesus Christ of Latter Day Saints. Liquefaction can be seen on the footpath and road.
A pdf copy of a post from the One Voice Te Reo Kotahi blog. The post is titled, "Friendly reminder".
The stitching of felt hearts on the anniversary of the first earthquake on the site of the demolished Ground Culinary Centre, which is now the Lyttelton Petanque Club grounds, a gathering spot for many community events and activities.
A photograph of street art in Brighton Mall, between Beresford Street and Hawke Street. The artist is Drowsy.
A photograph of street art on the sports pavilion and public toilets at Waltham Park.
A photograph of street art in Brighton Mall, between Beresford Street and Hawke Street. The artist is Drowsy.
The site in Sydenham where the 10 square metre office building of Gap Filler Headquarters sits, with the Coffee Zone shack next door.
Volunteers drill holes in corrugated iron on the outside of the 10 square metre office building, soon to be Gap Filler Headquarters.
Workers nail recycled metal sheets to the outside of the 10m2 office building, soon to be Gap Filler's Headquarters.
A pdf copy of a post from the One Voice Te Reo Kotahi blog. The post is titled, "July Forum".
The "As Far as Eye Can See" artwork on display in a window of The Colombo shopping centre, viewed from Colombo Street.
The construction of the 10 square metre office building which is to serve as Gap Filler Headquarters. A volunteer putting the roof together.
A photograph of an office in the Department of Civil and Natural Resources Engineering at the University of Canterbury after the 4 September 2010 earthquake.
A pdf copy of a post from the One Voice Te Reo Kotahi blog. The post is titled, "Forum presentation".
The construction of the 10 square metre office building which is to serve as Gap Filler Headquarters. Three volunteers putting the roof together.
The construction of the 10 square metre office building which is to serve as Gap Filler Headquarters. Two men nail the walls together.
A photograph of an office in the Department of Civil and Natural Resources Engineering at the University of Canterbury after the 4 September 2010 earthquake.
A photograph of an office in the Department of Civil and Natural Resources Engineering at the University of Canterbury after the 4 September 2010 earthquake.
Workers nail recycled metal sheets to the outside of the 10m2 office building, soon to be Gap Filler's Headquarters.
A photograph of an office in the Department of Civil and Natural Resources Engineering at the University of Canterbury after the 4 September 2010 earthquake.
The TimeBank book swap in front of the library. As the library has been closed since the earthquake, members of the community put together a book swap service which was later continued in the information centre.
Transcript of Emma Parnell's earthquake story, captured by the UC QuakeBox project.
Summary of oral history interview with Susan Hird about her experiences of the Canterbury earthquakes.
Summary of oral history interview with Erica Wheeler about her experiences of the Canterbury earthquakes.
Summary of oral history interview with Jane Higgins about her experiences of the Canterbury earthquakes.
Summary of oral history interview with Dee Turner about her experiences of the Canterbury earthquakes.
Summary of oral history interview with Marie Rean about her experiences of the Canterbury earthquakes.