Search

found 1226 results

Images, eqnz.chch.2010

Known by the locals as the "Owner's House" of the large Farnley Brick and Tile Works which was situated nearby. Established by the Austin brothers in 1863 the brickworks were named after the town of Farnley in Yorkshire England, from where the family had come. I remember the brickworks as a child and I think they were demolished in the 1970's. V...

Images, eqnz.chch.2010

Of what many in Christchurch know as the Millers building, but for many recent years was the home to the Christchurch City Council, till just a week or two before the first earthquake of 2010. Now, in mid-2014 it is finally being demolished after nearly 45 months empty. A bus is leaving the new (temporary) bus exchange onto Tuam Street. But n...

Images, eqnz.chch.2010

Another house has gone from Seabreeze Close, Pacific Park, Bexley, leaving just the concrete base, a few floor tiles and the smashed toilet (throne). Houses are being demolished (85%) or deconstructed/shifted (15%) as a result of land damage in the major earthquakes of 4th September 2010, 22nd February 2011, 13th June 2011 and 23rd December 2...

Images, eqnz.chch.2010

AMI Stadium (Lancaster Park), not used since the February 2011 earthquake. It was used predominantly for rugby and cricket. We are still waiting to see what the outcome is for this stadium. Government want a new one closer to the CBD, so there is talk of this being demolished, while others want it repaired. The concrete pad lower left is ...

Audio, Radio New Zealand

Hundreds of children and 12 schools have pre-registered for swimming lessons at Christchurch's new Taiora QE2 sports centre, which opens today. The Canterbury earthquakes damaged the complex beyond repair, and almost six years after it was demolished, a new QE2 has risen from rubble - admittedly smaller and without the athletics track the old one was so well known for. Schools in particular are welcoming today's opening, after having to spend big bucks on transport to get their students to pools for lessons since the quakes. Logan Church reports.

Audio, Radio New Zealand

A review of the week's news including: national earthquake memorial service announced, former defence chief to be new Governor General, Reserve Bank slashes official cash rate, Christchurch businesses say OCR cut alone won't save them, mounting concern over Christchurch World Cup prospects, government says 10,000 Christchurch homes will be demolished, alarm over possibility of mass demolition in CBD, international crews head home, petrol prices at three year high, Pike River mine receivers take control from police and boulder sold for thousands in aid of Christchurch

Images, UC QuakeStudies

Workers seen through a gap between wooden pallets in GapFiller's Pallet Pavillion. The photographer comments, "Though it looks strange and Photoshopped this is a straight shot through pallets painted blue. The Pallet Pavilion is built on the site of the demolished Crowne Plaza Hotel. It was built by volunteers, mainly students and construction engineers over 6 weeks. Here students are being given health and safety instructions before helping out on completing the temporary structure".

Videos, UC QuakeStudies

A video about the training of search dogs for New Zealand Urban Search and Rescue (USAR). The video includes an interview with dog handler, Brenda Woolley, and Tim Drennan, the President of the New Zealand USAR Search Dog Association. Woolley talks about what they look for in search dogs, as well as how they train them. The video also includes footage of a dog being trained in the rubble from a demolished building in Christchurch.

Videos, UC QuakeStudies

A video of a tour of Gloucester Street from Dallington to Rolleston Avenue, a five kilometre journey which can be seen as a cross-section of the Canterbury rebuild. The video includes footage of the site of the demolished St George's Presbyterian Church in Linwood, New Regent Street, the Rendezvous Hotel, the Isaac Theatre Royal, the Press building, the Christchurch Art Gallery, and Christ's College.

Images, eqnz.chch.2010

8 Velsheda Street, Bexley, Christchurch, across the road from my house was demolished a week or so ago, just one of many demolitions of Red Zone properties at the moment. This house was about ten years old and suffered land damage during the 4th September 2010 and 22nd February 2011 earthquakes. The same fate awaits my house later in the year o...

Images, Alexander Turnbull Library

Shows Bishop Victoria Matthews reading a brochure offering cheap deals for cathedrals and their various accoutrements. Context: refers to the debate about the fate of the Christchurch Cathedral. Bishop Victoria Matthews is in favour of demolishing the cathedral to a certain safe level. The lobby for saving the cathedral, wrecked by the earthquakes of 2010 and 2011, is very strong. Quantity: 1 digital cartoon(s).

Images, Alexander Turnbull Library

Refers to the controversy over the decision to demolish the Christchurch Cathedral which was severely damaged in the earthquakes of 2010 and 2011. The Anglican Bishop of Christchurch Victoria Mathews says the decision to demolish the cathedral was reached through prayer, great deliberation and with the utmost concern for safety. The Bishop says a number of options were considered before deciding to bring the walls down but the turning point was 23 December 2011, when a series of strong quakes rocked the city. At that stage the Canterbury Earthquake Authority approached the church. "CERA told us that our plans for making safe and retrieving, and then stepping back and making further decisions were no longer adequate." Christchurch City council announced their support on Twitter this afternoon (17 May 2012) - tweeting an endorsement to an immediate pause on demolition of the Cathedral to enable deeper and more open consideration of options. Quantity: 1 digital cartoon(s).

Audio, Radio New Zealand

A review of the week's news, including: environmental protests against oil exploration off the East cape, changes to Legal Aid, plans to sell the Pike River coal mine, a Labour MP says his party's list is drawn up by"a gaggle of gays", confidence in the economy grows, extraordinary powers given to the Canterbury Earthquake Recovery Authority, the number of heritage buildings to be demolished after the quake grows, results from faultline mapping in Christchurch to be known within weeks, Mt Ruapehu to be monitored around the clock and Victoria Cross winners are awarded with stamps.

Images, UC QuakeStudies

A digitally manipulated image of a shop window. A vase is visible in the window, and the sillhouette of a mannequin in the background. The photographer comments, "The title came from the pot and the E on the window. This is a building that has been off limits since the Christchurch earthquake. The E was sprayed on the window by rescue teams after searching the building and finding it was empty. This is a very old wooden building that looks OK from the front, but terrible from the side as the previously adjoined building has been demolished.

Images, UC QuakeStudies

Damage to TJ's Kazbah in New Brighton. The tower and east end of the building have collapsed onto two parked cars. The photographer comments, "The occupants of the business and rooms all managed to escape alive. A digger was used to make the building safe and then used to sift through the rubble for any surviving belongings. It was a very emotional time for the ex-occupants. The damaged cars were removed before the digger demolished the building".

Images, Alexander Turnbull Library

Christchurch City Councillor Aaron Keown has brought a building down on top of himself by hammering it with a mallet in his attempt to chain himself to it. Context: Refers to the start of the demolition of the Christchurch Cathedral in the wake of the earthquakes of 2010 and 2011. Aaron Keown has said he will chain himself to the cathedral to stop it being demolished. Quantity: 1 digital cartoon(s).

Images, Alexander Turnbull Library

Cartoon drawn in the style of a pen and ink drawing of the broken Christchurch Cathedral. One version has 'RIP' printed above the non-existant spire and the second has 'RIP' and the words 'Rest in Pieces'. A decision has been made to demolish the cathedral which was severely damaged by the earthquakes of 2010 and 2011. Two versions of this cartoon are available Title from file name Quantity: 2 digital cartoon(s).

Images, Alexander Turnbull Library

A chimpanzee paints with a palette of colours. Context: After the earthquakes in Christchurch buildings and areas were designated green, blue, red or white depending on the degree of damage. Buildings in the 'red' zone were then examined to ascertain whether they should be demolished or restored and sometimes the land itself was deemed unsafe. There have been many controversial decisions made which is the point the cartoon makes. Quantity: 1 digital cartoon(s).

Audio, Radio New Zealand

TVs, shopping trolleys, beds, mattresses, even a gun. That is just some of the rubbish found by residents surrounding Christchurch's residential red zone. The area used to be filled with houses, but damage after the Canterbury earthquakes forced thousands of homes to be demolished. While many of the old suburban roads remain, the area now resembles a park. But it is now attracting those wanting to dump their rubbish for free - and Land Information NZ, which controls the land, has removed 25 tonnes of trash since January. Residents have had enough as well - with some taking matters into their own hands. Checkpoint reporter Logan Church has the story.

Audio, Radio New Zealand

Cantabrians are still surrounded broken buildings and empty spaces on the 10th anniversary of the devastating 22 February 2011 Christchurch earthquake. The disaster forced 70 percent of the CBD to be demolished. The Government launched an ambitious recovery plan to help it recover in 2012. The Christchurch Central Recovery Plan, dubbed the "blueprint" would dictate the rebuild of the central city. To support it, the Government would complete a series of "anchor projects", to encourage investment in the city and make it a more attractive place to live in. As Anan Zaki reports, the anchor projects appeared to weigh down the progress of the rebuild.

Images, UC QuakeStudies

A protest sign painted on a fence shows an image of the cathedral spire and the words "Save + restore, stone by precious stone!" The photographer comments, "The Christchurch Cathedral got very badly damaged in the earthquake. It was being demolished down to a safe level before a major protest managed to stop it going too far. There is still an ongoing debate on what to do with the Cathedral. In the meantime a cardboard cathedral made out of a steel framework and massive toilet roll tubes is being constructed close by. This is to the right of the protest about the closure of Christchurch schools".

Research papers, University of Canterbury Library

Designing a structure for higher- than-code seismic performance can result in significant economic and environmental benefits. This higher performance can be achieved using the principles of Performance-Based Design, in which engineers design structures to minimize the probabilistic lifecycle seismic impacts on a building. Although the concept of Performance-Based Design is not particularly new, the initial capital costs associated with designing structures for higher performance have historically hindered the widespread adoption of performance-based design practices. To overcome this roadblock, this research is focused on providing policy makers and stakeholders with evidence-based environmental incentives for designing structures in New Zealand for higher seismic performance. In the first phase of the research, the environmental impacts of demolitions in Christchurch following the Canterbury Earthquakes were quantified to demonstrate the environmental consequences of demolitions following seismic events. That is the focus here. A building data set consisting of 142 concrete buildings that were demolished following the earthquake was used to quantify the environmental impacts of the demolitions in terms of the embodied carbon and energy in the building materials. A reduced set of buildings was used to develop a material takeoff model to estimate material quantities in the entire building set, and a lifecycle assessment tool was used to calculate the embodied carbon and energy in the materials. The results revealed staggering impacts in terms of the embodied carbon and energy in the materials in the demolished buildings. Ongoing work is focused developing an environmental impact framework that incorporates all the complex factors (e.g. construction methodologies, repair methodologies (if applicable), demolition methodologies (if applicable), and waste management) that contribute to the environmental impacts of building repair and demolition following earthquakes.

Images, UC QuakeStudies

The dome of the Isaac Theatre Royal covered in sheeting and suspended in the backstage area. In the foreground, a small digger sits on the bed of a truck, and a crane is visible to the left. The photographer comments, "This is the 'dome' of the Isaac Theatre Royal's heritage stage. The front section of the theatre has stayed and so has the back, but the middle has been completely demolished. The best way to hide a secret is in plain sight. Could this really be an ancient UFO stored secretly in the old theatre for decades and now exposed by the earthquake? Is the waiting crane and transporter ready to whip it away to another secret location in the dead of night?".

Images, Alexander Turnbull Library

Shows a sick and damaged Christchurch Anglican Cathedral in a hospital bed with two attendants. The Cathedral asks 'Can ya just pull the plug and let me die peacefully?'. Context refers to recent comments by Bishop Victoria Matthews that the Christchurch Cathedral is 'being left to die with no dignity' because of ongoing legal battles about its future. There has been ongoing debate and controversy over whether the Cathedral should be demolished, reconstructed or restored following damage suffered in the February 2011 Earthquake. Quantity: 1 digital cartoon(s).

Research papers, Victoria University of Wellington

<b>In the late 1960s the Wellington City Council surveyed all the commercial buildings in the city and marked nearly 200 as earthquake prone. The owners were given 15 years to either strengthen or demolish their buildings. The end result was mass demolition throughout the seventies and eighties.¹ Prompted by the Christchurch earthquakes, once again the council has published a list of over 630 earthquake prone buildings that need to be strengthened or demolished by 2030.²Of these earthquake prone buildings, the majority were built between 1880 and 1930, with 125 buildings appearing on the Wellington City Council Heritage Building List.³ This list accounts for a significant proportion of character buildings in the city. There is a danger that the aesthetic integrity of our city will be further damaged due to the urgent need to strengthen these buildings. Many of the building owners are resistant because of the high cost. By adapting these buildings to house co-workspaces, we can gain more than just the retention of the building’s heritage. The seismic upgrade provides the opportunity for the office space to be redesigned to suit changes in the ways we work. Through a design-based research approach this thesis proposes a framework that clarifies the process of adapting Wellington’s earthquake prone heritage buildings to accommodate co-working. This framework deals with the key concepts of program, structure and heritage. The framework is tested on one of Wellington’s earthquake prone heritage buildings, the Wellington Working Men’s Club, in order to demonstrate what can be gained from this strengthening process. ¹ Reid, J., “Hometown Boomtown,” in NZ On Screen (Wellington, 1983).</b> ² Wellington City Council, List of Earthquake Prone Buildings as at 06/03/2017. (Wellington: Absolutely Positively Wellington. 2017). ³ ibid. 

Research Papers, Lincoln University

Purpose - The purpose of this paper is to identify through the application of Actor Network Theory (ANT) the issues and impediments to the implementation of mandatory seismic retrofitting policies proposed by the New Zealand Government. In particular the tension between the heritage protection objectives contained in the Resource Management Act 1991 and the earthquake mitigation measures contained in the Building Act 2004 are examined. Design/methodology/approach - The paper uses a case study approach based on the Harcourts Building in Wellington New Zealand and the case law relating to attempts to demolish this particular building. Use is made of ANT as a 'lens' to identify and study the controversies around mandatory seismic retrofitting of heritage buildings. The concept of translation is used to draw network diagrams.

Images, Alexander Turnbull Library

Two people stare at a demolition scene. The man thinks there must have been an earthquake but the woman advises him that it was the city council. Refers to plans to demolish three buildings in Wellington's Willis Street without public consultation. The buildings due for demolition are owned by Singaporean Grand Complex Properties, which plans eventually to build a multimillion-dollar high-rise on the site, reports stuff.co.nz. The Canterbury earthquake happened 4th September and as a result there has been a lot of discussion about the need to preserve historic buildings if at all possible. Quantity: 1 digital cartoon(s).

Images, Alexander Turnbull Library

In the living room of a house half-ruined by the Christchurch earthquake a decrepit and useless-looking man in a grubby white singlet doses in his armchair with a glass of beer in his hand; his wife whispers to a friend 'Just between you and me, I'm hoping to have him red-stickered!' Context - The two Christchurch earthquakes of 4 September 2010 and 22 February 2011 and the technique of using different coloured stickers to designate the degree of damage to buildings - 'red' indicates that it needs to be demolished. Colour and black and white versions available Quantity: 2 digital cartoon(s).

Images, Alexander Turnbull Library

Text reads 'Could the wrecking ball be used on structures outside Christchurch?' The cartoon shows Minister for the Reconstruction of Christchurch Gerry Brownlee as the wrecking ball on a crane; he says 'let the fun begin'. To one side is a large house crowded with people which represents 'the welfare state' and is surrounded by a barrier on which are printed the words 'Fiscal emergency'. Context - Gerry Brownlee is seen by many as rather too quick to demolish heritage buildings in his rush to rebuild Christchurch. The wrecking ball idea also suggests that the National government is likely to wreck the welfare state in its efforts to sort out economic problems. Quantity: 1 digital cartoon(s).

Audio, Radio New Zealand

It was so nearly lost. As the Christ Church Anglican Cathedral is being rebuilt, historian Edmund Bohan is releasing a history of the distinctive Gothic building. It shows it was controversial even before work started on designing it, let alone building in. From the laying of the foundations to the official opening, it took 40 years, after squabbles over pretty much every aspect of its construction - not to mention the huge problems raising the money to build it in the City Centre. In Heart of the City: The Story of Christchurch's Controversial Cathedral, Edmund is critical of the former Anglican Bishop Victoria Matthews' determination to demolish the badly-damaged cathedral after the Canterbury earthquakes, to replace it with a modern church. And he tells Lynn Freeman he's very much looking forward to seeing the Cathedral restored to its former glory after a lengthy and pricey rebuild. But first he sets the scene. Back in the 1860s, there was controversy over where the cathedral should go, its design, whether it should be in stone or timber - even if there should be a cathedral built at all! Heart of the City: The Story of Christchurch's Controversial Cathedral, by Edmund Bohan is published by Quentin Wilson Publishing.