Photograph captioned by BeckerFraserPhotos, "Portaloos and temporary water tank at the Heathcote Valley School".
The supply of water following disasters has always been of significant concern to communities. Failure of water systems not only causes difficulties for residents and critical users but may also affect other hard and soft infrastructure and services. The dependency of communities and other infrastructure on the availability of safe and reliable water places even more emphasis on the resilience of water supply systems. This thesis makes two major contributions. First, it proposes a framework for measuring the multifaceted resilience of water systems, focusing on the significance of the characteristics of different communities for the resilience of water supply systems. The proposed framework, known as the CARE framework, consists of eight principal activities: (1) developing a conceptual framework; (2) selecting appropriate indicators; (3) refining the indicators based on data availability; (4) correlation analysis; (5) scaling the indicators; (6) weighting the variables; (7) measuring the indicators; and (8) aggregating the indicators. This framework allows researchers to develop appropriate indicators in each dimension of resilience (i.e., technical, organisational, social, and economic), and enables decision makers to more easily participate in the process and follow the procedure for composite indicator development. Second, it identifies the significant technical, social, organisational and economic factors, and the relevant indicators for measuring these factors. The factors and indicators were gathered through a comprehensive literature review. They were then verified and ranked through a series of interviews with water supply and resilience specialists, social scientists and economists. Vulnerability, redundancy and criticality were identified as the most significant technical factors affecting water supply system robustness, and consequently resilience. These factors were tested for a scenario earthquake of Mw 7.6 in Pukerua Bay in New Zealand. Four social factors and seven indicators were identified in this study. The social factors are individual demands and capacities, individual involvement in the community, violence level in the community, and trust. The indicators are the Giving Index, homicide rate, assault rate, inverse trust in army, inverse trust in police, mean years of school, and perception of crime. These indicators were tested in Chile and New Zealand, which experienced earthquakes in 2010 and 2011 respectively. The social factors were also tested in Vanuatu following TC Pam, which hit the country in March 2015. Interestingly, the organisational dimension contributed the largest number of factors and indicators for measuring water supply resilience to disasters. The study identified six organisational factors and 17 indicators that can affect water supply resilience to disasters. The factors are: disaster precaution; predisaster planning; data availability, data accessibility and information sharing; staff, parts, and equipment availability; pre-disaster maintenance; and governance. The identified factors and their indicators were tested for the case of Christchurch, New Zealand, to understand how organisational capacity affected water supply resilience following the earthquake in February 2011. Governance and availability of critical staff following the earthquake were the strongest organisational factors for the Christchurch City Council, while the lack of early warning systems and emergency response planning were identified as areas that needed to be addressed. Economic capacity and quick access to finance were found to be the main economic factors influencing the resilience of water systems. Quick access to finance is most important in the early stages following a disaster for response and restoration, but its importance declines over time. In contrast, the economic capacity of the disaster struck area and the water sector play a vital role in the subsequent reconstruction phase rather than in the response and restoration period. Indicators for these factors were tested for the case of the February 2011 earthquake in Christchurch, New Zealand. Finally, a new approach to measuring water supply resilience is proposed. This approach measures the resilience of the water supply system based on actual water demand following an earthquake. The demand-based method calculates resilience based on the difference between water demand and system capacity by measuring actual water shortage (i.e., the difference between water availability and demand) following an earthquake.
For the latest on the damage caused by Monday's earthquakes, we're joined by the Christchurch City Council's water and waste unit manager, Mark Christison.
A pipe run over a street, supplying temporary water to people living in Avonside. A portable toilet can be seen in the distance.
Photograph captioned by BeckerFraserPhotos, "Damage to water pipes, Oxford Terrace between Lichfield and Cashel Streets".
A presentation by Dr Matthew Hughes (Department of Civil and Natural Resource Engineering) on "Liquefaction Impacts on Christchurch's Water and Wastewater Networks".
Canterbury mayors say their ratepayers are already paying for earthquake recovery, roading, water and storm water infrastructure, so a shiny new Christchurch stadium is way down the priority list.
In 1861, the city of Christchurch would have been virtually unrecognisable to a 21st century resident. Buildings were scattered sparsely throughout what is now the central business district and dirt roads and low fences traversed a landscape that was more grassland … Continue reading →
The ground at this residential property on New Brighton Road is completely water-logged.
A report which details the archaeological investigations carried out during the course of SCIRT project 11185, water main renewal work on Manchester Street.
A document which contains the slide notes to go with the PowerPoint presentation made for the Water Services Association of Australia conference.
A photograph captioned by BeckerFraserPhotos, "Stagnant water in Waygreen Avenue leads to green algae in all the puddles".
A warning sign posted on River Road beside the Avon River reads "Health warning, contaminated water. Due to sewage overflows this water is unsafe for human contact and activity and is a public health risk. Please keep all people and pets out of contact with the water and do not cosume and seafood or shellfish collected from this area." The photographer comments, "A bike ride around the CBD. River Rd subsidence".
water main? pushed out of road
The company which runs Christchurch's water and sewage systems says it expects supply and wastewater problems in the wake of the earthquake to appear for at least the next six months.
A technical paper prepared for the Water NZ conference and expo 2012, which details how GIS and InfoNet were used to complement SCIRT's asset assessment process.
Photograph captioned by BeckerFraserPhotos, "Lyttelton School".
A photograph of a damaged footpath. The photograph is captioned by Paul Corliss, "River Road, Avonside".
A photograph of a sign from the Christchurch City Council, ECan and the Canterbury District Health Board warning people over the contamination in the rivers after the September earthquake. The sign reads, "Warning, contaminated water. Due to sewage overflows this water is unsafe for human contact and activity and is a Public Health Risk. Please keep all people and pets out of contact with the water and do not consume any seafood or shellfish collected from this area". In the background, workers from Treetech clean up wood and leaves from felled trees.
©2019. American Geophysical Union. All Rights Reserved. Earthquakes have been inferred to induce hydrological changes in aquifers on the basis of either changes to well water-levels or tidal behavior, but the relationship between these changes remains unclear. Here, changes in tidal behavior and water-levels are quantified using a hydrological network monitoring gravel aquifers in Canterbury, New Zealand, in response to nine earthquakes (of magnitudes M w 5.4 to 7.8) that occurred between 2008 and 2015. Of the 161 wells analyzed, only 35 contain water-level fluctuations associated with “Earth + Ocean” (7) or “Ocean” (28) tides. Permeability reduction manifest as changes in tidal behavior and increased water-levels in the near field of the Canterbury earthquake sequence of 2010–2011 support the hypothesis of shear-induced consolidation. However, tidal behavior and water-level changes rarely occurred simultaneously (~2%). Water-level changes that occurred with no change in tidal behavior reequilibrated at a new postseismic level more quickly (on timescales of ~50 min) than when a change in tidal behavior occurred (~240 min to 10 days). Water-level changes were more than likely to occur above a peak dynamic stress of ~50 kPa and were more than likely to not occur below ~10 kPa. The minimum peak dynamic stress required for a tidal behavior change to occur was ~0.2 to 100 kPa.
Photograph captioned by Fairfax, "Major earthquake hits Christchurch. Collecting water from a water tanker on Kingsford Street are Callum McDowell (left) and Jamie McDowell".
New Zealand Army Engineers working at New Brighton beach to provide desalinated water for residents affected by the 22 February 2011 earthquake.
New Zealand Army Engineers working at New Brighton beach to provide desalinated water for residents affected by the 22 February 2011 earthquake.
New Zealand Army Engineers working at New Brighton beach to provide desalinated water for residents affected by the 22 February 2011 earthquake.
A document outlining the methodology for rebuilding horizontal infrastructure in the central city, covering wastewater (local reticulation and trunk), wastewater pump stations, storm water (local reticulation and trunk), potable water, roads, and bridges.
A document outlining how the rebuild of wastewater, water supply, storm water and roading infrastructure was to be managed and coordinated with other programmes of work in the central city.
A pdf copy of a PowerPoint presentation made for the Water Services Association of Australia conference, about SCIRT's approach to asset investigation after the Canterbury earthquakes of 2010 and 2011.
New Zealand Army Engineers working at New Brighton beach to provide desalinated water for residents affected by the 22 February 2011 earthquake.
Photograph captioned by Fairfax, "Major earthquake hits Christchurch. Collecting water from a water tanker on Kingsford Street are from left: Gracie McDowell and Jamie McDowell".
An entry from Deb Robertson's blog for 22 June 2011 entitled, "It's not just the water and food you need in an emergency...".