Search

found 122 results

Videos, UC QuakeStudies

A video of an interview with Andrew Holden, Editor of The Press, about the 4 September 2010 earthquake. Holden talks about the status of the Press Building in Cathedral Square, The Press's temporary offices in the Novotel hotel, and the importance of newspapers in a post-disaster zone.

Images, UC QuakeStudies

A view down Cashel Street, with the Crossing building and the Westpac building in the background. Taken on a day when a walkway was opened up between Re:Start Mall and Cathedral Square to allow temporary public access.

Images, eqnz.chch.2010

The temporary (10 years?) and cheap ($4-6 million) Anglican Cathedral being built a few hundred meters away from the old stone structure that was the centre of Christchurch. Both buildings (the original and this) have caused a lot of controversy, many wanting the old stone one to be repaired (the church want to demolish it), and this as a waste ...

Images, UC QuakeStudies

Two girls standing on the plinth where the statue of John Robert Godley, Canterbury's founder, once stood. Taken on a day when a walkway was opened up between Re:Start Mall and Cathedral Square to allow temporary public access.

Images, UC QuakeStudies

A view down Cashel Street. The Crossing building can be partially seen and the Westpac building is in the background. Taken on a day when a walkway was opened up between Re:Start Mall and Cathedral Square to allow temporary public access.

Images, UC QuakeStudies

A view down Cashel Street. The Crossing building can be partially seen and the Westpac building is in the background. Taken on a day when a walkway was opened up between Re:Start Mall and Cathedral Square to allow temporary public access.

Images, UC QuakeStudies

A view down High Street from the corner of Colombo and Hereford Streets. In the distance, the Holiday Inn City Centre is being demolished. Taken on a day when a walkway was opened up between Re:Start Mall and Cathedral Square to allow temporary public access.

Images, UC QuakeStudies

The damaged TimeZone games arcade on Colombo Street. The roof has collapsed, batts from the ceiling are piled in the window, and the door is boarded up. Taken on a day when a walkway was opened up between Re:Start Mall and Cathedral Square to allow temporary public access.

Images, UC QuakeStudies

The damaged TimeZone games arcade on Colombo Street. The roof has collapsed, batts from the ceiling are piled in the window, and the door is boarded up. Taken on a day when a walkway was opened up between Re:Start Mall and Cathedral Square to allow temporary public access.

Audio, Radio New Zealand

The Anglican church is considering whether to sell Christchurch's cardboard cathedral to plug a shortfall in the budget for restoring the original descimated in the earthquakes. The church leadership will discuss the future of the cardboard building during meetings at the weekend. It opened opposite Latimer square in 2013 as a temporary place of worship, but soom became popular with tourists too. Meanwhile a 2017 estimate put the cost of restoring the actual Cathedral at just over $100 million, but that's since ballooned to north of $155 million. Harcourts real estate agent, Mark O'Loughlin, speaks to Lisa Owen from Christchurch. [embed] https://players.brightcove.net/6093072280001/default_default/index.html?videoId=6336786667112

Images, UC QuakeStudies

Looking across an empty site on the corner of Colombo and Hereford Streets where several buildings have been demolished, the Ibis Hotel and ANZ building are visible in the background. Taken on a day when a walkway was opened up between Re:Start Mall and Cathedral Square to allow temporary public access.

Images, UC QuakeStudies

People look through the cordon fence at the corner of Colombo and Hereford Streets. On the left is the former site of Camera House, and on the right is the ANZ building, with its ground floor windows boarded up. Taken on a day when a walkway was opened up between Re:Start Mall and Cathedral Square to allow temporary public access.