Search

found 115 results

Images, eqnz.chch.2010

Repairs being carried out on this restaurant (converted from a church) at the Hereford Street / Manchester Street intersection;aftermath of the magnitude 7.1 earthquake that struck Christchurch on Saturday 4 September 2010.

Images, eqnz.chch.2010

This beautiful building on Madras Street is red stickered and may be condemned if the structural damage it suffered in the magnitude 7,1 earthquake on Saturday 4 September 2010 cannot be repaired.

Images, eqnz.chch.2010

This beautiful building on Madras Street is red stickered and may be condemned if the structural damage it suffered in the magnitude 7,1 earthquake on Saturday 4 September 2010 cannot be repaired.

Images, eqnz.chch.2010

Yellow stickered building means restricted access, and the building will need to be repaired and certified fit for use; aftermath of the magnitude 7.1 earthquake that hit Christchurch on 4 September 2010.

Images, eqnz.chch.2010

This beautiful building on Madras Street is red stickered and may be condemned if the structural damage it suffered in the magnitude 7,1 earthquake on Saturday 4 September 2010 cannot be repaired.

Images, Alexander Turnbull Library

Maori Party MP for Te Tai Tonga, Rahui Katene' is buried up to her neck in earthquake rubble as she reads a newspaper headline referring to her statement that the aftermath of the earthquake has demonstrated 'racism and ethnic profiling'. Rahui Katene's head is disintegrating and two engineers who are examining the damage decide that 'This can't be repaired, it needs to be condemned'. Rahui Katene says the authorities, who kicked a Christchurch family out of a welfare centre that was set up after the Christchurch earthquake that struck on the 4th September, should apologise for judging them too early and shaming them publicly. Mrs Katene was also concerned about claims that Maori youth were being targeted by police. "I've heard from whanau that in one particular area rangatahi who were volunteering in their community and helping their whanau were accused by police of theft. The whanau are trying to work these issues through with the police, but I'm growing concerned about what appears to be ethnic profiling." Quantity: 1 digital cartoon(s).

Images, eqnz.chch.2010

Steel frames are being used to shore the unstable facade of the St John the Baptist Church at Latimer Square while the building is being repaired and strengthened following the magnitude 7.1 earthquake that struck Christchurch on Saturday 4 September 2010.

Images, UC QuakeStudies

Photograph captioned by Fairfax, "Gunyah homestead was badly damaged during the September 4th 2010 earthquake, but the Cotterill family are picking up the pieces and rebuilding. Builders repair the master bedroom where a large brick chimney came through the room narrowly missing the Cotterills and totally obliterating their bed".

Images, UC QuakeStudies

Photograph captioned by Fairfax, "Gunyah homestead was badly damaged during the September 4th 2010 earthquake, but the Cotterill family are picking up the pieces and rebuilding. Builders repair the master bedroom where a large brick chimney came through the room narrowly missing the Cotterills and totally obliterating their bed".

Research papers, University of Canterbury Library

This paper presents the probabilistic seismic performance and loss assessment of an actual bridge– foundation–soil system, the Fitzgerald Avenue twin bridges in Christchurch, New Zealand. A two-dimensional finite element model of the longitudinal direction of the system is modelled using advanced soil and structural constitutive models. Ground motions at multiple levels of intensity are selected based on the seismic hazard deaggregation at the site. Based on rigorous examination of several deterministic analyses, engineering demand parameters (EDP’s), which capture the global and local demand, and consequent damage to the bridge and foundation are determined. A probabilistic seismic loss assessment of the structure considering both direct repair and loss of functionality consequences was performed to holistically assess the seismi risk of the system. It was found that the non-horizontal stratification of the soils, liquefaction, and soil–structure interaction had pronounced effects on the seismic demand distribution of the bridge components, of which the north abutment piles and central pier were critical in the systems seismic performance. The consequences due to loss of functionality of the bridge during repair were significantly larger than the direct repair costs, with over a 2% in 50 year probability of the total loss exceeding twice the book-value of the structure.

Images, UC QuakeStudies

Photograph captioned by Fairfax, "City Care workers. From left, Donny Haenga, Mafutga and David Henry enjoying a BBQ put on by City Care for their staff. The trio, from Wellington have work over 100 hours between them since Tuesday when they arrived. 35 specialists from Tauranga, Wellington, Dunedin and Timaru have joined the Christchurch staff with trucks and equipment from around NZ to help with the quake repairs".

Images, UC QuakeStudies

The University of Canterbury's E-Learning team's temporary office in the James Hight building. The photographer comments, "First looks at our new temporary (maybe) office space. Our group will stay here until April or May 2011, then will move to another floor in the Central Library. Foyer lifts etc. Female toilets are off the foyer to the left. These lifts start at Level 2 of the Library, and are heavily used by students. (Once the building is repaired after the earthquake; several floors are still in a mess)".