The eastern face of Christ Church Cathedral. The damaged windows have been boarded up. A shipping container sits in the overgrown garden.
A member of the New Zealand Army stands outside a cordon check point on Hereford Street.
A new building under construction on Kilmore Street. A sign reading, 'Danger keep out' has been placed on the security fence.
A photograph captioned by BeckerFraserPhotos, "Digging out the basement of the ANZ building in Cathedral Square".
A photograph captioned by BeckerFraserPhotos, "The Heritage Apartment Hotel in Cathedral Square all refurbished and ready to occupy".
A video of the removal of the earthquake-damaged Medway Street bridge from the banks of the Avon River. The video shows members of the Stronger Christchurch Infrastructure Rebuild Team removing the bridge and preparing it for transport to the Ferrymead Heritage Park. It will remain at the park until a permanent home can be found for it as an earthquake memorial.
On the day the the government and council jointly announced who will fund what, for the Christchurch rebuild, a rainbow appears over the rebuild of the Latimer Hotel. For the central city the figures are: NZ$4.9 billion with $2.9 billion coming from central government and $1.9 billion coming from the local city council (us ratepayers in Christc...
Nearly two years' after Christchurch's February earthquake and almost 6 months after the blueprint for the city centre was revealed, many questions remain about how much it will cost and who will pay for it.
A document which details the agreement in September 2013 between the Government and the Christchurch City Council over governance of the horizontal infrastructure rebuild.
An entry from Jennifer Middendorf's blog for 23 December 2013 entitled, "Holidays!".
The demolition site of the Holiday Inn City Centre on Cashel Street. Reinforcement cabling protrudes from the top of the concrete posts. Rubble from the demolition surrounds the site.
A photograph captioned by BeckerFraserPhotos, "An artwork on the end wall of Re:START Mall".
A photograph of people at the site of the CTV building. The photograph is captioned by Paul Corliss, "Second anniversary 22 February earthquake".
A manual which informs SCIRT AutoCAD users of all tools, utilities, keyboard shortcuts, and tips available within the SCIRT CAD System.
A manual which provides SCIRT AutoCAD users with general guidance about how to use AutoCAD.
A designer's guideline which explains the role of Technical Leads at SCIRT.
A report which details the findings of a performance audit carried out by the Office of the Auditor-General to assess the effectiveness and efficiency of arrangements to repair Christchurch's horizontal infrastructure.
A document which details the structure, roles and terms of reference for the Client Governance Group (CGG).
A plan which details how in 2013 SCIRT planned to engage its workforce in training.
A guideline which defined the process and ownership of templates used by the design team and the management of the design team electronic library.
A document which contains a set of procedures for the "best practice" mark out and recording of subsurface utilities.
A copy of the award application for the New Zealand Engineering Excellence Awards 2013.
This document describes the tool developed for capturing the abandoned and removed assets using the SCIRT GIS viewer.
An example of a tool SCIRT has used to communicate its projects to the business community.
A guideline created for SCIRT Delivery Teams which outlines the requirements for working around heritage items.
A plan which describes the framework, principles and process for determining project prioritisation and the sequence in which those projects are carried out. The first version of this plan was produced on 23 September 2011.
A design guideline which provides information about how to use the SCIRT Asset Assessment Spreadsheet.
A poster which outlines the dewatering process.
A magazine article which outlines the observations of engineers working on SCIRT retaining wall and ground improvement projects.
A guideline to inform designers of the pipe profilometer operation, including requesting profile surveys, standards and assessments of the survey results.