Search

found 174 results

Images, eqnz.chch.2010

Further damage to the bank following the two quakes on 23/12/11. The sewer line broke here and was repaired (patched) by council staff on Christmas Eve. It is hard to beleve that this rock wall was level with the land here, before any of the quakes.

Articles, UC QuakeStudies

A photograph captioned, "After the September earthquake, it was more a simple case of something gets broken and it gets repaired. Then came February, and June as well, and suddenly it's just not so straightforward anymore".

Images, eqnz.chch.2010

The old Christchurch Railway Station Clock Tower was damaged during the 7.1 magnitude quake on 4 September 2010 and was braced by the wooden sleeve until repaired. However, although the sleeve did its job during the 6.3 magnitude quake on 22 February 2011, the lower part of the tower started to break away.

Images, UC QuakeStudies

A digitally manipulated image of liquefaction around a house in Avondale. The photographer comments, "The bottom of the gates were swallowed up by liquefaction, but the house still looked in good condition, which was confirmed by builders just going in to work on the property. It is in the Christchurch red zone, which after testing has been deemed unsuitable for houses to be built on. All the land will be bought by the Government and they would also buy any properties that could be repaired. The remaining insured property owners will get a payment from the insurance company. All the buildings are condemned to be knocked down".

Images, UC QuakeStudies

A photograph of a room in the Diabetes Centre which has been prepared for repairs. The moveable stacks and counter have been covered in plastic sheeting and a tarpaulin has been draped over the carpet.

Audio, Radio New Zealand

It's seven years today since Christchurch was rocked by the magnitude 6.3 earthquake. It killed 185 people, injured thousands more and led to whole suburbs and most of the central city being demolished. Seven years on, the rebuild is still underway and some residents are still struggling to get the repairs they want.

Images, UC QuakeStudies

A photograph of an office in the Diabetes Centre which has been prepared for earthquake repair work. Furniture and other office materials have been stacked in the corner of the room. Several tiles are missing from the ceiling above.

Videos, UC QuakeStudies

A video of excavators demolishing the former railway station on Moorhouse Avenue. The building was only moderately damaged during the 22 February 2011 earthquake, but repair work was deemed too costly for the co-owner, Science Alive!.

Audio, Radio New Zealand

Many Christchurch trades people are refusing to carry out quake repairs unless the homeowner agrees to pay the bill, saying it takes too long to get the money out of the Earthquake Commission. Some contractors say they still haven't been paid for jobs done after the quake in September and the amount of debt some businesses are carrying are putting them in jeopardy.

Images, eqnz.chch.2010

Repairs in progress on this High Street shop; aftermath of the magnitude 7.1 earthquake that struck Christchurch on Saturday 4 September 2010.

Images, UC QuakeStudies

A photograph of the stairwell of the Diabetes Centre on Hagley Avenue. There is a workbench in the foreground and a plank of wood on the right side of the stairs. On the landing the wall has been repaired and is unpainted.

Images, eqnz.chch.2010

Red stickered building means no access, and the building may be condemned if it cannot be repaired; aftermath of the magnitude 7.1 earthquake that hit Christchurch on 4 September 2010.