A photograph captioned by Paul Corliss, "Central city, from Manchester Street".
A photograph captioned by Paul Corliss, "Central city, from Manchester Street".
A photograph captioned by Paul Corliss, "Central city, from Manchester Street".
A photograph captioned by Paul Corliss, "Central city, from Manchester Street".
A photograph captioned by Paul Corliss, "Central city, from Manchester Street".
A chart giving costs for repair or rebuild of Christchurch City Council facilities.
Road cones line a hole in Gayhurst Road, dug for pipe repairs.
An award application submitted for the IPWEA Annual Excellence Awards 2016, detailing Fulton Hogan's work repairing the repair methodology for the Sumner Road retaining wall - stage 4.
Extensive repairs being made to the sewerage infrastructure on Avonside Drive.
Extensive repairs being made to the sewerage infrastructure on Avonside Drive.
A photograph captioned by Paul Corliss, "Packing for EQC at 38 Belleview Terrace".
A photograph captioned by Paul Corliss, "Packing for EQC at 38 Belleview Terrace".
A photograph captioned by Paul Corliss, "Packing for EQC at 38 Belleview Terrace".
A photograph captioned by Paul Corliss, "Packing for EQC at 38 Belleview Terrace".
A photograph captioned by Paul Corliss, "Packing for EQC at 38 Belleview Terrace".
A photograph captioned by Paul Corliss, "Packing for EQC at 38 Belleview Terrace".
A paper which outlines the observed damage to Christchurch City Council-owned retaining walls and the repair solutions developed.
A photograph submitted by Grant Fife to the QuakeStories website. The description reads, "Canterbury Provincial Chambers 03/04/2011. This building was being stabilised and repaired after the September quake.".
A sign on a wire fencing around a construction site reading, "Quake repairs, keep out, for your own safety".
One of the workers helping to repair the damage to the James Hight Library.
Information board and hazard notices for the Riccarton House earthquake repairs and strengthening project.
Some Christchurch residents fear there's a risk to the region's history if headstones damaged by September's 7.1 magnitude earthquake are not repaired.
A PDF copy of a handwritten journal kept by Robin Robins, documenting the repair work on his earthquake-damaged home between November 2012 and April 2017. Note that some personal information has been redacted from this document.
An entry from Deborah Fitchett's blog for 31 January 2012, posted to Livejournal. The entry is titled, "My #eqnz repairs story".The entry was downloaded on 13 April 2015.
Photograph captioned by BeckerFraserPhotos, "The Edmonds Clock on Oxford Terrace looks quite unlike itself, but at least it is being protected while it is repaired".
An entry from Deborah Fitchett's blog for 31 January 2012, posted to Dreamwidth. The entry is titled, "My #eqnz repairs story".The entry was downloaded on 16 April 2015.
A conference paper prepared for the 4th Australasian Engineering Heritage Conference which outlines the challenges faced by SCIRT when repairing the Armagh Bridge, Colombo Bridge and Antigua Bridge.
A news item titled, "Oxford Street Bridge Repaired", published on the Lyttelton Harbour Information Centre's website on Thursday, 29 September 2011.
The Earthquake Commission could have a big job on its hands fixing quake damaged Christchurch homes for a second time.
Photograph captioned by BeckerFraserPhotos, "Dorset Apartments, Peterborough Street - closed for repairs".