Search

found 123 results

Images, UC QuakeStudies

A photograph of the earthquake damage to the Loyal Benevolent Lodge on Canon Street. The top of the façade has crumbled, and the bricks have fallen oto the ground, taking the awning with them. Plastic fencing has been placed around the building as a cordon.

Images, UC QuakeStudies

A photograph of the Wellington Emergency Management Office Emergency Response Team walking down Lichfield Street. Plastic fencing and road cones have been placed along both sides of the road as cordons. Behind the fences are piles of bricks and other rubble from the buildings above.

Images, UC QuakeStudies

St Pauls Trinity-Pacific Presbyterian Church on the corner of Cashel and Madras Streets. Scaffolding has been placed around the left dome of the building which was damaged during the 4 September earthquake. Plastic has also been placed over the dome to protect the inside from weather damage.

Images, UC QuakeStudies

St Pauls Trinity-Pacific Presbyterian Church on the corner of Cashel and Madras Streets. Scaffolding has been placed around the left dome of the building which was damaged during the 4 September earthquake. Plastic has also been placed over the dome to protect the inside from weather damage.

Images, UC QuakeStudies

A photograph of members of the Wellington Emergency Management Office Emergency Response Team walking down Lichfield Street towards the intersection of Manchester Street. Buildings on either side of the team have been damaged by the earthquake. Plastic and wire fences line the street to the right.

Images, UC QuakeStudies

A photograph of members of the Wellington Emergency Management Office walking down Lichfield Street towards the intersection of Madras Street. Buildings on either side of the street have been damaged by the earthquake. Plastic fences have been places around piles of rubble on the street as cordons.

Images, UC QuakeStudies

A photograph of mattresses in Cowles Stadium, still in their plastic wrapping waiting to be unwrapped. The stadium was set up as a Civil Defence Report Centre after the 4 September 2010 earthquake and the mattresses were to be used as beds for those displaced by the earthquake.

Images, UC QuakeStudies

A photograph of mattresses in Cowles Stadium, still in their plastic wrapping waiting to be unwrapped. The stadium was set up as a Civil Defence Report Centre after the 4 September 2010 earthquake and the mattresses were to be used as beds for those displaced by the earthquake.

Images, UC QuakeStudies

Trucks and diggers build large piles of liquefaction silt. One pile has been covered with plastic sheeting, weighted down with tyres. In the foreground can be seen the Bromley sewage treatment ponds. The photographer comments, "Looking NW from the causeway through the sewage wetlands. Mountains of liquefaction silt are being piled up near the corner of Breezes Rd and SH74-Anzac Drive".

Images, UC QuakeStudies

Trucks and diggers build large piles of liquefaction silt. One pile has been covered with plastic sheeting, weighted down with tyres. In the foreground can be seen the Bromley sewage treatment ponds. The photographer comments, "Looking NW from the causeway through the sewage wetlands. Mountains of liquefaction silt are being piled up near the corner of Breezes Rd and SH74-Anzac Drive".

Images, UC QuakeStudies

A photograph of members of the Wellington Emergency Management Office Emergency Response Team walking down Lichfield Street towards the intersection of Madras Street. There is rubble from several earthquake-damaged buildings on both sides of the road. Plastic fences and road cones have been placed on the street as cordons.

Images, UC QuakeStudies

Smoke billowing from the remains of the collapsed Canterbury Television Building on Madras Street. Flames are visible through a gap in the intact section of the building. Below, emergency personnel can be seen searching the rubble for trapped people. On the right, two workers are using a piece of corrugated plastic as a slide to remove objects from the rubble.

Images, UC QuakeStudies

Emergency personnel searching for people trapped in the collapsed Canterbury Television Building on Madras Street. On the right, a man is using a sheet of corrugated plastic to slide pieces of debris off the building. Smoke is billowing from the remains of the building and a jet of water can be seen in the background, attempting to extinguish the fire.

Images, UC QuakeStudies

A member of the New Zealand Fire Service in a cherry picker spraying water at the fire burning in the collapsed Canterbury Television Building. Smoke is billowing out of the intact section of the building. Below, emergency personnel are searching the rubble for trapped people. A piece of corrugated plastic is being used to slide pieces of debris off the site.

Images, UC QuakeStudies

Emergency personnel searching for people trapped in the collapsed Canterbury Television Building on Madras Street. On the right, a man is using a sheet of corrugated plastic to slide pieces of debris off the building. Smoke is billowing from the remains of the building and a jet of water can be seen in the background, attempting to extinguish the fire.

Images, UC QuakeStudies

Volunteers photographed around one of Gap Filler's painted pianos. The piano has been set up at the demolished site of the Crowne Plaza Hotel. A wooden structure has been built around the piano with Perspex and corrugated iron on top and plastic sheeting to the left and right. This is to protect the piano and pianist from wind and rain.

Images, UC QuakeStudies

A photograph of a group of tents set up in Latimer Square next to the Singapore Rescue Team's store and equipment area. Plastic mesh and tape has been placed around the tents as a fence. The tents were used as temporary accommodation for emergency management personnel after the 22 February 2011 earthquake.

Images, UC QuakeStudies

A photograph looking north up Durham Street from the Gloucester Street intersection. To the left, there is a large pile of rubble from a demolished building, to the right, the Canterbury Provincial Chambers. The Provincial Chambers building has been largely deconstructed and plastic sheeting has been placed over part of the roof. Wire fencing has been placed around the buildings.

Images, UC QuakeStudies

Pallet Golf', a Gap Golf course on a the site of a demolished building. It has been built by Gap Filler to look like a journey through Christchurch. A plastic road cone as well as mini road cones, road signs, tunnels and rivers can be seen. The course has been built using green felt, wooden pallets, tyres, planks of wood and bricks.

Images, UC QuakeStudies

A photograph of the earthquake damage to a group of stores on Manchester Street including the While You Wait Studio, Smith's Bookshop, Aji Global Grocery & Chocolateria and Curios Bric-a-Brac. Sections of the front wall have crumbled, the bricks falling to the footpath and damaging the awnings. Plastic fencing has been placed along the road as a cordon.

Images, UC QuakeStudies

Large piles of liquefaction silt at a dump on Breezes Road. One of the piles is covered with black plastic and weighted down with tyres. Trucks and diggers are adding more silt to the piles. The photographer comments, "Breezes Road and Anzac Drive have recently opened but are now home to a brand new range of hills thanks to mountains of silt that have been collected by the hard working construction guys that have done a sterling job on the road there".

Images, UC QuakeStudies

Large piles of liquefaction silt at a dump on Breezes Road. One of the piles is covered with black plastic and weighted down with tyres. Trucks and diggers are adding more silt to the piles. The photographer comments, "Breezes Road and Anzac Drive have recently opened but are now home to a brand new range of hills thanks to mountains of silt that have been collected by the hard working construction guys that have done a sterling job on the road there".

Images, UC QuakeStudies

A photograph of the earthquake damage to a group of stores on Manchester Street including Peaches and Cream, the While You Wait Studio, Smith's Bookshop, Aji Global Grocery & Chocolateria and Curios Bric-a-Brac. Sections of the front wall have crumbled, the bricks falling to the footpath and damaging the awnings. Plastic fencing has been placed along the road as a cordon.

Images, UC QuakeStudies

A photograph of emergency management personnel walking in a line down Lichfield Street towards the intersection of Madras Street . The members in white hazmat suits are holding their hands over their heads while members of the New Zealand Army take the lead and follow from behind. Rubble from several earthquake-damaged buildings has scattered across the street to the right. Plastic fencing has been placed along the left side of the road as a cordon. In the background there are several earthquake-damaged buildings along Lichfield Street.

Images, UC QuakeStudies

A photograph of a workstation in Crack'd for Christchurch's workshop. The workstation includes pieces of broken china, a pair of cutters for breaking up china, a plastic container to hold china pieces, and two mosaic plans. One of the plans has a piece of mesh laid over the top. The other is being used to lay out the mosaic.Crack'd for Christchurch comments, "Marie begins the very first flower. It is so difficult and time consuming that we are all in despair. Will this take forever? No-one is getting paid and we all have jobs and lives in some chaos thanks to the earthquakes."

Research papers, The University of Auckland Library

Perimeter Moment resisting steel frames (PMRSFs) are a commonly used seismic resisting system, placed around the perimeter of the building for maximum torsional stiffness. They are typically designed as “strong column weak beam” systems with fixed column bases. When subjected to severe earthquake demand, sufficient to push the beams into the inelastic range, it is expected that plastic hinging at the column bases will occur. However, the response of PMRSF systems to the severe 2010/2011 Christchurch earthquake series did not generate column base hinging in systems which exhibited beam yielding.

Research papers, University of Canterbury Library

This poster presents preliminary results of ongoing experimental campaigns at the Universities of Auckland and Canterbury, aiming at investigating the seismic residual capacity of damaged reinforced concrete plastic hinges, as well as the effectiveness of epoxy injection techniques for restoring their stiffness, energy dissipation, and deformation capacity characteristics. This work is part of wider research project which started in 2012 at the University of Canterbury entitled “Residual Capacity and Repairing Options for Reinforced Concrete Buildings”, funded by the Natural Hazards Research Platform (NHRP). This research project aims at gaining a better understanding and providing the main end-users and stakeholders (practitioner engineers, owners, local and government authorities, insurers, and regulatory agencies) with comprehensive evidence-based information and practical guidelines to assess the residual capacity of damaged reinforced concrete buildings, as well as to evaluate the feasibility of repairing and thus support their delicate decision-making process of repair vs. demolition or replacement.

Research papers, The University of Auckland Library

The 2011, 6.3 magnitude Christchurch earthquake in New Zealand caused considerable structural damage. It is believed that this event has now resulted in demolition of about 65-70% of the building stock in the Central Business District (CBD), significantly crippling economic activities in the city of Christchurch. A major concern raised from this event was adequacy of the current seismic design practice adopted for reinforced concrete walls due to their poor performance in modern buildings. The relatively short-duration earthquake motion implied that the observed wall damage occurred in a brittle manner despite adopting a ductile design philosophy. This paper presents the lessons learned from the observed wall damage in the context of current state of knowledge in the following areas: concentrating longitudinal reinforcement in wall end regions; determining wall thickness to prevent out-of-plane wall buckling; avoiding lap splices in plastic hinge zones; and quantifying minimum vertical reinforcement. http://www.2eceesistanbul.org/