Photograph captioned by Fairfax, "St John's Church in Hororata undergoes repairs to its tower after it was damaged in the September earthquake".
Photograph captioned by Fairfax, "St John's Church in Hororata undergoes repairs to its tower after it was damaged in the September earthquake".
Photograph captioned by Fairfax, "St John's Church in Hororata undergoes repairs to its tower after it was damaged in the September earthquake".
Photograph captioned by Fairfax, "St John's Church in Hororata undergoes repairs to its tower after it was damaged in the September earthquake".
Photograph captioned by Fairfax, "St John's Church in Hororata undergoes repairs to its tower after it was damaged in the September earthquake".
Some Christchurch residents are angry they will have to wait almost three years before their severely earthquake damaged homes can be repaired.
Photograph captioned by Fairfax, "St John's Church in Hororata undergoes repairs to its tower after it was damaged in the September earthquake".
Photograph captioned by Fairfax, "St John's Church in Hororata undergoes repairs to its tower after it was damaged in the September earthquake".
Photograph captioned by Fairfax, "St John's Church in Hororata undergoes repairs to its tower after it was damaged in the September earthquake".
Photograph captioned by Fairfax, "St John's Church in Hororata undergoes repairs to its tower after it was damaged in the September earthquake".
Photograph captioned by Fairfax, "St John's Church in Hororata undergoes repairs to its tower after it was damaged in the September earthquake".
More than 600 Christchurch home-owners face a wait of up to 18 months before its decided who foots the bill for earthquake repairs that could cost hundreds of millions of dollars. The problem - first revealed on Checkpoint in March - is that owners bought homes thinking all quake damage had been identified and fixed - only to find more problems that weren't addressed. The people affected cannot claim on their insurance - because the damage pre-dates them buying the house - and any grant from the Earthquake Commission is capped. EQC has publicly apologised to those affected but the Minster, Megan Woods, says it's unclear who will pay for the needed repairs.
Repairs being carried out on this restaurant (converted from a church) at the Hereford Street / Manchester Street intersection;aftermath of the magnitude 7.1 earthquake that struck Christchurch on Saturday 4 September 2010.
This beautiful building on Madras Street is red stickered and may be condemned if the structural damage it suffered in the magnitude 7,1 earthquake on Saturday 4 September 2010 cannot be repaired.
This beautiful building on Madras Street is red stickered and may be condemned if the structural damage it suffered in the magnitude 7,1 earthquake on Saturday 4 September 2010 cannot be repaired.
This beautiful building on Madras Street is red stickered and may be condemned if the structural damage it suffered in the magnitude 7,1 earthquake on Saturday 4 September 2010 cannot be repaired.
20130211_2645_1D3-840 South New Brighton bridge damage (under repair) Earthquake damage (that right hand abutment should be vertical with the bridge and the hand rail level). Bridge is closed to eastbound traffic (to left) and has a 3500kg weight limit as well. The eastern approach is the same. Damage caused mainly in the 04/09/10 and 22/02/11...
Some Christchurch residents fear there's a risk to the region's history if headstones damaged by September's 7.1 magnitude earthquake are not repaired.
Photograph captioned by Fairfax, "Workers from Calcon repair burst water pipes at the corner of Avonside Drive and Linwood Avenue after Saturday's earthquake".
Photograph captioned by Fairfax, "Workers from Calcon repair burst water pipes at the corner of Avonside Drive and Linwood Avenue after Saturday's earthquake".
Photograph captioned by Fairfax, "Workers from Calcon repair burst water pipes at the corner of Avonside Drive and Linwood Avenue after Saturday's earthquake".
Photograph captioned by Fairfax, "Damage from the February 22nd earthquake in Christchurch. Chimney repair work at a house on Hackthorne Road, Cashmere".
Photograph captioned by Fairfax, "Workers from Calcon repair burst water pipes at the corner of Avonside Drive and Linwood Avenue after Saturday's earthquake".
Victoria Square, the slightly less famous cousin of nearby Cathedral Square was re-opened today following $7.5 million worth of earthquake repairs.
Six years after being severely damaged in the 2011 Christchurch earthquake and after two years of repairs, Mona Vale has reopened its doors to the public.
More repairs to the infrastructure as a result of the 2010 & 2011 earthquakes. Hardy Street/Owles Terrace corner (beside the boat launching ramp), New Brighton
A Christchurch construction firm says businesses who are complaining about losing money on earthquake repair jobs should work more closely with their project managers.
Two years on from the February twenty second earthquake, large parts of Christchurch Hospital are a construction site as repairs to damaged wards continue.
The owners of more than three-thousand properties damaged by the Canterbury earthquake have been told the repair job could take nearly three years.
Fletcher Construction has won the largest building contract in New Zealand history to repair half of the Canterbury homes damaged in last month's earthquake.