Search

found 118 results

Images, UC QuakeStudies

View down Victoria Street with the Casino on the right having some construction working being done, and the deconsruction of the Crowne Plaza Hotel at the end of the street. Flags in Canterbury colours, red and black can be seen on the street lights.

Audio, Radio New Zealand

At least five companies are busy working in and around Christchurch blasting rock on unstable slopes in the hope of reducing danger since the earthquakes. Spectrum's Deborah Nation joins backcountry construction company Solutions 2 Access, as the team blasts rock on the Port Hills above Lyttelton.

Research papers, The University of Auckland Library

Following the 2010/2011 Canterbury earthquakes a detailed campaign of door to door assessments was conducted in a variety of areas of Christchurch to establish the earthquake performance of residential dwellings having masonry veneer as an external cladding attached to a lightweight timber framing system. Specifically, care was taken to include regions of Christchurch which experienced different levels of earthquake shaking in order to allow comparison between the performance of different systems and different shaking intensities. At the time of the inspections the buildings in the Christchurch region had been repeatedly subjected to large earthquakes, presenting an opportunity for insight into the seismic performance of masonry veneer cladding. In total just under 1100 residential dwellings were inspected throughout the wider Christchurch area, of which 24% were constructed using the older nail-on veneer tie system (prior to 1996) and 76% were constructed using screw fixed ties to comply with the new 1996 standards revision (post-1996), with 30% of all inspected houses being of two storey construction. Of the inspected dwellings 27% had some evidence of liquefaction, ground settlement or lateral spreading. Data such as damage level, damage type, crack widths, level of repair required and other parameters were collected during the survey. A description of the data collection processes and a snapshot of the analysis results are presented within. http://15ibmac.com/home/

Audio, Radio New Zealand

158 other buildings may share CTV construction flaw; US defence chief lifts ban on NZ vessels in US ports; first snapshot of national standards data published today; Korean fishing boat officers fined more than $400,000; and SFO starts investigation into Christchurch earthquake insurance fraud.

Images, UC QuakeStudies

A photograph of the south side of the building at 112 Manchester Street. A contemporary billboard for Fortis Construction reads, "Let's build our new city together - kia kaha". It partly obscures an old painted sign for Polson's Decorators and Signwriters, which reads "Protect your investment. Paint your property regularly - and save money".

Images, UC QuakeStudies

Damage to the Cathedral of the Blessed Sacrament. Looking through the fence on to the side and front where shipping containers are being used to support the walls. On the cordon are signs that say 'Danger. Demolition in Progress. No Entry', and 'Monitored construction alarms. Site secured. No Unauthorised entry'.

Research papers, The University of Auckland Library

This paper shows an understanding of the availability of resources in post-disaster reconstruction and recovery in Christchurch, New Zealand following its September 4, 2010 and February 22, 2011 earthquakes. Overseas experience in recovery demonstrates how delays and additional costs may incur if the availability of resources is not aligned with the reconstruction needs. In the case of reconstruction following Christchurch earthquakes, access to normal resource levels will be insufficient. An on-line questionnaire survey, combined with in-depth interviews was used to collect data from the construction professionals that had been participated in the post-earthquake reconstruction. The study identified the resources that are subject to short supply and resourcing challenges that are currently faced by the construction industry. There was a varied degree of impacts felt by the surveyed organisations from resource shortages. Resource pressures were primarily concentrated on human resources associated with structural, architectural and land issues. The challenges that may continue playing out in the longer-term reconstruction of Christchurch include limited capacity of the construction industry, competition for skills among residential, infrastructure and commercial sectors, and uncertainties with respect to decision making. Findings provide implications informing the ongoing recovery and rebuild in New Zealand. http://www.iiirr.ucalgary.ca/Conference-2012

Images, UC QuakeStudies

A digitally manipulated image of an excavator. The photographer comments, "This is a huge excavator in the Christchurch CBD. It is being used to clear away the enormous amount of rubble from the buildings being demolished. It seems that nearly all the big machinery from all other the world has been needed in the clean up of the earthquake damaged buildings and utilities".

Videos, UC QuakeStudies

A video montage of LUXCITY, a city of lights that existed for one night on Saturday 20 October 2012. LUXCITY was the main event of FESTA 2012 and included 16 interactive installations, designed and fabricated by architecture and design students from across New Zealand. The film depicts the construction and set up, through to the public event on Saturday night.

Images, UC QuakeStudies

A proposed design by John Raven for a new cathedral, tied to a cordon fence. Clarendon Tower can be seen in the background. The photographer comments, "Someone is asking for designs for a new Christchurch Cathedral after it was announced that the old historical building will not be repaired, to be put on the fences through which people can see the de-construction of the old one. This design looks a great one to me".

Videos, UC QuakeStudies

A video about members of the Irish rugby team touring the Christchurch central city Red Zone. The team is in Christchurch for a test match against the All Blacks at the new Christchurch Stadium. The video includes interviews with scrum coach Greg Feek and coach Declan Kidney. It also includes footage of Irish construction workers meeting the team in Cathedral Square.

Research papers, University of Canterbury Library

High-Force-to-Volume lead dampers (HF2V) have been recently developed through an experimental research program at University of Canterbury – New Zealand. Testing of the device and applications on beam column joints have demonstrated stable hysteretic behaviour with almost no damage. This paper reports testing of HF2V devices with straight, bulged and constricted shaft configurations subjected to velocities of 0.15 - 5.0mm/s. The effect of the shaft configuration on the hysteresis loop shape, design relationships and the effect of the velocity on the resistive force of the device are described. Results show that hysteresis loop shape of the device is almost square regardless of the shaft configuration, and that devices are characterized by noticeable velocity dependence in the range of 0.15-1.0mm/s.

Videos, UC QuakeStudies

A video of Press journalist Martin Van Beynen talking about the Canterbury Television Building which collapsed during the 22 February 2011 earthquake. Beynen investigates the construction manager of the building, Gerald Shirtcliff, who allegedly faked an engineering degree and stole the identity of an engineer he knew in South Africa. The video also includes footage of Shirtcliff giving evidence about the CTV Building at the Canterbury Earthquake Royal Commission.

Images, UC QuakeStudies

Workers seen through a gap between wooden pallets in GapFiller's Pallet Pavillion. The photographer comments, "Though it looks strange and Photoshopped this is a straight shot through pallets painted blue. The Pallet Pavilion is built on the site of the demolished Crowne Plaza Hotel. It was built by volunteers, mainly students and construction engineers over 6 weeks. Here students are being given health and safety instructions before helping out on completing the temporary structure".

Research papers, The University of Auckland Library

During the Christchurch earthquake of February 2011, several midrise buildings of Reinforced Concrete Masonry (RCM) construction achieved performance levels in the range of life safety to near collapse levels. These buildings were subjected to seismic demands higher than the building code requirements of the time and higher than the current New Zealand Loadings Standard (NZS-1170.5:2004). Structural damage to these buildings has been documented and is currently being studied to establish lessons to be learned from their performance and how to incorporate these lessons into future RCM design and construction practices. This paper presents a case study of a six story RCM building deemed to have reached the near collapse performance level. The RCM walls on the 2nd floor failed due to toe crushing reducing the building’s lateral resistance in the east-west direction. A nonlinear dynamic analysis on a 3D model was conducted to simulate the development of the governing failure mechanism. Preliminary analysis results show that the damaged walls were initially under large compression forces from gravity loads which caused increase in their lateral strength and reduced their ductility. After toe crushing failure developed, axial instability of the model was prevented by a redistribution of gravity loads.

Audio, Radio New Zealand

DAVID SHEARER to the Prime Minister: Does he stand by his statement "I am deeply concerned about every child in New Zealand who is in poverty"; if so, why has the number of children living in material hardship grown under his watch? TODD McCLAY to the Minister of Finance: What measures has the Government taken to support vulnerable New Zealanders through the aftermath of the domestic recession and global financial crisis? METIRIA TUREI to the Prime Minister: When he said "we don't want to see any New Zealand child suffer … children don't get to make choices, they're often the victim of circumstance" does that mean he will take tangible steps to ensure children don't suffer because of circumstances beyond their control? Rt Hon WINSTON PETERS to the Prime Minister: Does he have confidence in the Minister of Immigration? Hon DAVID PARKER to the Minister of Finance: Compared to 2012, does the Reserve Bank forecast the New Zealand dollar (as measured by the Trade Weighted Index) to strengthen or weaken in the next two years, and does he believe this will make New Zealand exporters more competitive or less competitive? DAVID BENNETT to the Minister for Economic Development: How is the Government encouraging the sustainable use of natural resources to support jobs and grow the economy? Hon MARYAN STREET to the Minister of Health: Is he satisfied with the state of children's health in New Zealand; if not, why not? COLIN KING to the Minister of Energy and Resources: What recent announcement has he made about Block Offer 2012? EUGENIE SAGE to the Minister for the Environment: Does she agree with the New Zealand Freshwater Sciences Society in relation to freshwater that "failure to act with decisiveness and urgency risks further environmental degradation and erosion of our international environmental reputation"; if not, why not? Hon LIANNE DALZIEL to the Minister for Building and Construction: How quickly will he respond to the building performance, assessment and construction recommendations of the Royal Commission of Inquiry into Building Failure caused by the Canterbury Earthquakes? NICKY WAGNER to the Minister for Building and Construction: What is the Government doing in response to the Canterbury Earthquakes Royal Commission's full report? CLARE CURRAN to the Prime Minister: Does he stand by all his statements?

Images, Alexander Turnbull Library

Shows Bishop Victoria Matthews reading a brochure offering cheap deals for cathedrals and their various accoutrements. Context: refers to the debate about the fate of the Christchurch Cathedral. Bishop Victoria Matthews is in favour of demolishing the cathedral to a certain safe level. The lobby for saving the cathedral, wrecked by the earthquakes of 2010 and 2011, is very strong. Quantity: 1 digital cartoon(s).

Research papers, University of Canterbury Library

This thesis is about many things, not least of all the September 4th 2010 and February 22nd 2011 earthquakes that shook Christchurch, New Zealand. A city was shaken, events which worked to lay open the normally invisible yet vital objects, processes and technologies which are the focus of inquiry: the sewers, pipes, pumps, the digital technologies, the land and politics which constitute the Christchurch wastewater networks. The thesis is an eclectic mix drawing together methods and concepts from Bruno Latour, John Law, Giles Deleuze and Felix Guattari, Nigel Thrift, Donna Haraway and Patrick Joyce. It is an exploration of how the technologies and objects of sanitation perform the city, and how such things which are normally hidden and obscured, are made visible. The question of visibility is also turned toward the research itself: how does one observe, and describe? How are sociological visibilities constructed? Through the research, the encountering of objects in the field, the processes of method, the pedagogy of concepts, and the construction of risk, the thesis comes to be understood as a particular kind of social scientific artefact which assembles four different accounts: the first regards the construction of visibility; the second explores Christchurch city from the control room where the urban sanitary infrastructures are monitored; the third chapter looks at the formatted and embodied practices which emerge with the correlation of the city and sanitation; the fourth looks at the changing politics of a city grappling with severely damaged essential services, land and structures. The final chapter considers how the differences between romantic and baroque sensibilities mean that these four accounts elicit knowing not through smoothness or uniformity, but in partiality and non-coherence. This thesis is about pipes, pump stations, and treatment plants; about the effluent of a city; about the messiness of social science when confronted by the equally messy world of wastewater.

Research papers, The University of Auckland Library

The sequence of earthquakes that has affected Christchurch and Canterbury since September 2010 has caused damage to a great number of buildings of all construction types. Following post-event damage surveys performed between April 2011 and June 2011, the damage suffered by unreinforced stone masonry buildings is reported and different types of observed failures are described. A detailed technical description of the most prevalently observed failure mechanisms is provided, with reference to recognised failure modes for unreinforced masonry structures. The observed performance of existing seismic retrofit interventions is also provided, as an understanding of the seismic response of these interventions is of fundamental importance for assessing the vulnerability of similar strengthening techniques when applied to unreinforced stone masonry structures.

Images, Alexander Turnbull Library

Shows Minister for Christchurch Earthquake Recovery Gerry Brownlee delighted with his plan to rebuild Christchurch and to have it paid for buy the PM's casino. Context: Refers to the Christchurch Central Development Unit that Minister for Christchurch Earthquake Recovery Gerry Brownlee has put in place. Refers also to the very controversial deal that Prime Minister John Key has made with Auckland's SkyCity to the effect that SkyCity will pay the full construction cost of a new convention centre - estimated at $350 million, in return for being allowed to add more gaming tables and machines, and extending its licence beyond 2021. Colour and black and white versions of this cartoon are available Quantity: 2 digital cartoon(s).

Research papers, The University of Auckland Library

Two days after the 22 February 2011 M6.3 earthquake in Christchurch, New Zealand, three of the authors conducted a transect of the central city, with the goal of deriving an estimate of building damage levels. Although smaller in magnitude than the M7.1 4 September 2010 Darfield earthquake, the ground accelerations, ground deformation and damage levels in Christchurch central city were more severe in February 2011, and the central city was closed down to the general public. Written and photographic notes of 295 buildings were taken, including construction type, damage level, and whether the building would likely need to be demolished. The results of the transect compared favourably to Civil Defence rapid assessments made over the following month. Now, more than one year and two major aftershocks after the February 2011 earthquake these initial estimates are compared to the current demolition status to provide an updated understanding of the state of central Christchurch.

Research papers, University of Canterbury Library

Drywalls are the typical infill or partitions used in new structures. They are usually located within structural frames and/or between upper and lower floor slabs in buildings. Due to the materials used in their construction, unlike masonry blocks, they can be considered as light non-structural infill/partition walls. These types of walls are especially popular in New Zealand and the USA. In spite of their popularity, little is known about their in-plane cyclic behaviour when infilled within a structural frame. The cause of this lack of knowledge can be attributed to the typical assumption that they are weak non-structural elements and are not expected to interact with the surrounding structural system significantly. However, recent earthquakes have repeatedly shown that drywalls interact with the structure and suffer severe damage at very low drift levels. In this paper, experimental test results of two typical drywall types (steel and timber framed) are reported in order to gather further information on; i) their reverse cyclic behaviour, ii) inter-storey drift levels at which they suffer different levels of damage, iii) the level of interaction with the surrounding structural frame system. The drywall specimens were tested using quasi-static reverse cyclic testing protocols within a full scale precast RC frame at the Structures Laboratory of the University of Canterbury.

Research papers, University of Canterbury Library

Earthquake Engineering is facing an extraordinarily challenging era, the ultimate target being set at increasingly higher levels by the demanding expectations of our modern society. The renewed challenge is to be able to provide low-cost, thus more widely affordable, high-seismic-performance structures capable of sustaining a design level earthquake with limited or negligible damage, minimum disruption of business (downtime) or, in more general terms, controllable socio-economical losses. The Canterbury earthquakes sequence in 2010-2011 has represented a tough reality check, confirming the current mismatch between societal expectations over the reality of seismic performance of modern buildings. In general, albeit with some unfortunate exceptions, modern multi-storey buildings performed as expected from a technical point of view, in particular when considering the intensity of the shaking (higher than new code design) they were subjected to. As per capacity design principles, plastic hinges formed in discrete regions, allowing the buildings to sway and stand and people to evacuate. Nevertheless, in many cases, these buildings were deemed too expensive to be repaired and were consequently demolished. Targeting life-safety is arguably not enough for our modern society, at least when dealing with new building construction. A paradigm shift towards damage-control design philosophy and technologies is urgently required. This paper and the associated presentation will discuss motivations, issues and, more importantly, cost-effective engineering solutions to design buildings capable of sustaining low-level of damage and thus limited business interruption after a design level earthquake. Focus will be given to the extensive research and developments in jointed ductile connections based upon controlled rocking & dissipating mechanisms for either reinforced concrete and, more recently, laminated timber structures. An overview of recent on-site applications of such systems, featuring some of the latest technical solutions developed in the laboratory and including proposals for the rebuild of Christchurch, will be provided as successful examples of practical implementation of performance-based seismic design theory and technology.