A photograph of a mural on a wall in the former site of a building on Norwich Quay in Lyttelton. Sections of reinforcing steel and other construction material have been laid up against the mural.
A photograph of a member of the Wellington Emergency Management Office Emergency Response Team walking down Gloucester Street towards Colombo Street. In the distance, a group of construction workers are walking down the street.
A photograph of a mural on a wall in the former site of a building on Norwich Quay in Lyttelton. A skip, several pallets, and other construction material have been placed in front of the mural.
A photograph of a large All Right? banner being installed on a Leighs Construction hoarding. All Right? posted the photograph on their Facebook page on 18 February 2014 at 4:51pm.
A photograph of a mural on a wall in the former site of a building on Norwich Quay in Lyttelton. There is a portacom on the site, and construction material is leaning against the mural.
Page 2 of Section A of the Christchurch edition of the Christchurch Press, published on Thursday 9 August 2012.
This report discusses the experiences gained and lessons learned during a project management internship in post-earthquake Christchurch as part of the construction industry and rebuild effort.
A photograph of construction equipment displayed in a shipping container on Oxford Terrace.
A photograph of construction equipment displayed in a shipping container on Oxford Terrace.
A photograph of construction equipment displayed in a shipping container on Oxford Terrace.
Volunteers standing on top of pallets during the construction of the Pallet Pavilion.
Two volunteers taking a break during the construction of Gap Filler's Pallet Pavilion.
Volunteers laying stones on the ground during the construction of the Pallet Pavilion.
Photograph captioned by BeckerFraserPhotos, "The EPIC construction office, 100 Manchester Street".
The Canterbury earthquakes that happened in 2010 and 2011 have attracted many migrant workers to the region to assist with the rebuilding effort. However, research on the impact of influx of migrants on the labour market outcomes of a local industry post-disaster is limited internationally and locally. The main objective of this study is to examine the impact of the Canterbury earthquakes on the changes in demographic composition and occupational structure for the local and foreign workers in the Greater Christchurch construction industry. Replicating the discrete dependent variable regression methods used in the study by Sisk and Bankston III (2014), this study also aimed to compare their findings on the impact of the influx of migrants on the New Orleans construction industry with outcomes in Greater Christchurch. Customised data from New Zealand Censuses 2006 and 2013 were used to represent the pre- and post-earthquake periods. This study found that the rebuild has provided opportunities for migrant workers to enter the Greater Christchurch construction industry. The increased presence of migrant construction workers did not displace the locals. In fact, the likelihoods for both locals’ and migrants’ participation in the industry improved post-earthquakes. The earthquakes also increased overall workers’ participation at the lowest end of the occupational structure. However, the earthquakes created few significant changes to the distribution of local and migrant workers at the various occupational levels in the industry. Local workers still dominated all occupational levels post-earthquakes. The aggregated education levels of the construction workers were higher post-earthquakes, particularly among the migrant workers. Overall, migrant workers in the Greater Christchurch construction industry were more diverse, more educated and participated in higher occupational levels than migrants assisting in the New Orleans rebuild, due possibly to differences in immigration policies between New Zealand and the United States of America.
The purpose of this paper is to empirically investigate the effects of a major disaster on the management of human resources in the construction sector. It sets out to identify the construction skills challenges and the factors that affected skills availability following the 2010/2011 earthquakes in Christchurch. It is hoped that this study will provide insights for on-going reconstruction and future disaster response with respect to the problem of skills shortages. Design/methodology/approach A triangulation method was adopted. The quantitative method, namely, a questionnaire survey, was employed to provide a baseline description. Field observations and interviews were used as a follow-up to ascertain issues and potential shortages over time. Three focus groups in the form of research workshops were convened to gain further insight into the feedback and to investigate the validity and applicability of the research findings. Findings The earthquakes in Christchurch had compounded the pre-existing skills shortages in the country due to heightened demand from reconstruction. Skills shortages primarily existed in seismic assessment and design for land and structures, certain trades, project management and site supervision. The limited technical capability available nationally, shortage of temporary accommodation to house additional workers, time needed for trainees to become skilled workers, lack of information about reconstruction workloads and lack of operational capacity within construction organisations, were critical constraints to the resourcing of disaster recovery projects. Research limitations/implications The research findings contribute to the debate on skills issues in construction. The study provides evidence that contributes to an improved understanding of the industry’s skills vulnerability and emerging issues that would likely exist after a major disaster in a resource-limited country such as New Zealand. Practical implications From this research, decision makers and construction organisations can gain a clear direction for improving the construction capacity and capability for on-going reconstruction. Factors that affected the post-earthquake skills availability can be considered by decision makers and construction organisations in their workforce planning for future disaster events. The recommendations will assist them in addressing skills shortages for on-going reconstruction. Originality/value Although the study is country-specific, the findings show the nature and scale of skills challenges the construction industry is likely to face following a major disaster, and the potential issues that may compound skills shortages. It provides lessons for other disaster-prone countries where the resource pool is small and a large number of additional workers are needed to undertake reconstruction.
A video of Emily Marriot, from Corbel Construction, and Agata Bulksa, from Kirk Roberts Engineers, taking part in a boxing match as part of the Battle of the Rebuild fight night. The Battle of the Rebuild bought together major construction and engineering companies involved in the rebuild of Christchurch. The event raised more than $169,000 for the Aranui and Linwood College Breakfast Club, the Champion Centre, and the Canterbury Youth Development Programme Trust.
A conference paper prepared for the 4th Australasian Engineering Heritage Conference which outlines the challenges faced by SCIRT when repairing the Armagh Bridge, Colombo Bridge and Antigua Bridge.
EQC CEO Sid Miller says the agency is currently defending 316 legal cases over the Christchurch earthquakes, and is considering legal action against Fletcher's for its project management of the repairs.
A construction area on Kilmore Street with a pile of rubble behind cordon fencing.
A photograph captioned by Paul Corliss, "Cardboard Cathedral construction, Madras Street and Hereford Street".
A photograph captioned by Paul Corliss, "Cardboard Cathedral construction, corner Madras and Cashel Streets".
Cement trucks parked on the Ilam Oval during the construction of the Oval village.
A photograph captioned by Paul Corliss, "Cardboard Cathedral construction, corner Madras and Cashel Streets".
A photograph captioned by Paul Corliss, "Cardboard Cathedral construction, corner Madras and Cashel Streets".
A photograph captioned by Paul Corliss, "Cardboard Cathedral construction, corner Madras and Cashel Streets".
A photograph captioned by Paul Corliss, "Cardboard Cathedral construction, corner Madras and Cashel Streets".
A photograph captioned by Paul Corliss, "Cardboard Cathedral construction, corner Madras and Cashel Streets".
A photograph captioned by Paul Corliss, "Cardboard Cathedral construction, corner Madras and Cashel Streets".
A photograph captioned by Paul Corliss, "Cardboard Cathedral construction, corner Madras and Cashel Streets".