The inside of a temporary classroom in the Kirkwood Oval, ready for students.
The inside of one the temporary classrooms, still being constructed, in the Oval Village.
Workers building the floor of one of the temporary classrooms on the Ilam Oval.
Workers laying the floor on one of the temporary classrooms in the Ilam Oval.
Workers pouring concrete into the foundations for the temporary classrooms on the Ilam Oval.
Workers pouring concrete into the foundations for the temporary classrooms on the Ilam Oval.
The inside of a temporary classroom on the Ilam Oval, almost ready for students.
The inside of one of the temporary classrooms in the Oval Village, almost finished.
KG 6 and KG 7, temporary classrooms in the Kirkwood Oval, ready for students.
A crane lowers the roof onto one of the temporary classrooms on the Ilam Oval.
A worker on the roof of one of the temporary classrooms in the Oval Village.
The inside of one of the temporary classrooms in the Kirkwood Village, ready for students.
The inside of one of the temporary classrooms in the Kirkwood Village, ready for students.
A crane lowers the roof onto one of the temporary classrooms on the Ilam Oval.
A worker pouring contrete into the foundation of a temporary classroom on the Ilam Oval.
Lines of nails used in the construction of temporary classrooms at the College of Education.
A crane lowers the roof onto one of the temporary classrooms on the Ilam Oval.
A worker sawing insulation to fit into the floor of a classroom in the Oval Villlage.
A worker working on the roof of one of the temporary classrooms on the Ilam Oval.
Workers laying insulation into the floor of one of the temporary classrooms in the Ilam Oval.
A digger digs up dirt for the foundations of one of the classrooms on the Ilam Oval.
A digger digs up dirt for the foundations of one of the classrooms on the Ilam Oval.
A digger digs up dirt for the foundations of one of the classrooms on the Ilam Oval.
Prefab buildings in the quad of Christ College, hired to replace damaged classrooms that are unsafe to enter.
Prefab buildings in the quad of Christ College, hired to replace damaged classrooms that are unsafe to enter.
Workers digging up the ground as part of the construction of the Oval Village, temporary classrooms on Campus.
Insulation waiting to be installed into the floor of one of the temporary classrooms in the Ilam Oval.
A new way to get students left classroom-less by the Christchurch earthquake back into school is proving successful.
Piles in the ground, waiting for the floors of temporary classrooms to be built on top, on the Ilam Oval.
An aerial photograph of Burnside High School.