A report which details the archaeological investigations carried out during the course of SCIRT project 11185, water main renewal work on Manchester Street.
A document which contains the slide notes to go with the PowerPoint presentation made for the Water Services Association of Australia conference.
A plan which aims to ensure an environment of Zero Harm on SCIRT worksites. The first version of this plan was produced on 29 July 2011.
An award submission nominating Jane Taylor for the Hays NAWIC Excellence Awards 2016: Category: Professional Tradeswoman of the Year.
An abstract which describes the content of Kristen MacAskill's full PhD thesis.
An entry from Deb Robertson's blog for 9 May 2016 entitled, "Seeing the world through Preston's eyes...."The entry was downloaded on 3 November 2016.
A plan which outlines the processes and IT applications and services required to manage the SCIRT programme. The first version of this plan was produced on 9 August 2011.
A plan which outlines how SCIRT is to carry out condition investigations and analysis. The first version of this plan was produced on 1 September 2011.
A video of the opening remarks made by Lyall Lukey, Coordinator of SmartNet, at the 2016 Seismics in the City Conference.
A plan which aims to ensure an environment of Zero Harm on SCIRT worksites. The first version of this plan was produced on 29 July 2011.
A plan which outlines how to manage the environmental impacts that result from SCIRT works. The first version of this plan was produced on 20 July 2011.
A document which stipulates SCIRT's minimum standard for managing the risks arising from working around services.
A document which specifies the technical requirements for the rehabilitation and repair of pipes using lining methodologies during the SCIRT programme of work.
A plan which outlines the scope, approach and key deliverables for communications and stakeholder engagement for SCIRT. The first version of this plan was produced on 7 January 2013.
A digital copy of a pen and ink and watercolour painting by Raymond Morris, titled, 'Sevicke Jones Building, 53 Cathedral Square, 1913-2011'.
A PDF copy of a newsletter sent by All Right? to their mailing list in October 2016.
A PDF copy of a newsletter sent by All Right? to their mailing list in March 2016.
A PDF copy of a newsletter sent by All Right? to their mailing list in October 2016.
A plan which documents how SCIRT is to efficiently and effectively ramp down the delivery of its work, demobilise facilities and resources and wind up the organisation.
A PDF copy of a newsletter sent by All Right? to their mailing list in May 2016.
A PDF copy of a newsletter sent by All Right? to their mailing list in October 2016.
An entry from Deb Robertson's blog for 29 June 2016 entitled, "Feelings. Five years on #wecandohardthings".The entry was downloaded on 2 November 2016.
A video of an opening address by Professor Maan Alkaisi, Principal Investigator at the MacDiarmid Institute, at the 2016 Seismics in the City Conference.
An entry from Deborah Fitchett's blog for 23 February 2016, posted to Livejournal. The entry is titled, "In which five years".The entry was downloaded on 2 November 2016.
A PDF copy of a newsletter sent by All Right? to their mailing list in May 2016.
A PDF copy of a newsletter sent by All Right? to their mailing list in November 2016.
A story submitted by Jo Wicken to the QuakeStories website.
A report which details the archaeological investigations carried out during the course of SCIRT projects 11115 and 11159, wastewater renewal work and storm water repair work on Ferry Road.
A pdf copy of a PowerPoint presentation made for the Water Services Association of Australia conference, about SCIRT's approach to asset investigation after the Canterbury earthquakes of 2010 and 2011.
A paper which outlines what had been achieved by SCIRT's Training Team, and proposing an approach to ensure that the learnings from SCIRT be transferred to wider industry.