Search

found 143 results

Images, UC QuakeStudies

Members of the public speaking with police officers on the corner of Durham Street and Armagh Street in the aftermath of the 22 February earthquake. On the right the timber section of the historic Provincial Council Chambers can be seen, including the clock tower which has collapsed onto the road. Armagh Street leading into the city has been cordoned off by red tape.

Images, UC QuakeStudies

A fire engine driving past the damaged Provincial Council Legislative Chamber on Durham Street. The building's roof and walls have collapsed, as has the scaffolding which was erected to repair it after the 4 September 2010 earthquake.

Images, UC QuakeStudies

A photograph of the earthquake damage to the Canterbury Provincial Chambers Building on Durham Street. Large sections of the masonry have collapsed, spilling onto the road. Wire fencing has been placed around the building as a cordon. Scaffolding erected up the side has collapsed.

Images, UC QuakeStudies

A photograph of the earthquake damage to the Canterbury Provincial Chambers Building on Durham Street. Large sections of the masonry have collapsed, spilling onto the road. Wire fencing has been placed around the building as a cordon. Scaffolding erected up the side has collapsed.

Images, UC QuakeStudies

A photograph of buildings on Armagh Street, taken from behind a cordon. From the front, there is the Provincial Chambers building, then Craig's Investment Partners House, the Victoria Apartments, and the Forsyth Barr building.

Images, UC QuakeStudies

A photograph of buildings on Armagh Street, taken from behind a cordon. From the front, there is the Provincial Chambers building, then Craig's Investment Partners House, the Victoria Apartments, and the Forsyth Barr building.

Images, UC QuakeStudies

Civil Defence staff walking down Durham Street, a fire engine behind them. Beside them, the damaged Provincial Council Legislative Chamber can be seen. The building's roof and walls have collapsed, as has the scaffolding that had been erected to repair it after the 4 September 2010 earthquake.