Search

found 100 results

Videos, UC QuakeStudies

A video of Rachel Young describing the changes that will be made to streets in the Christchurch central city, under the Accessible Transport Plan. The video includes time-lapse footage of a car driving down Durham Street, Tuam Street, Kilmore Street, Salisbury Street, and Rolleston Avenue. Young explains that Tuam Street will become a west-to-east one-way street, that a new bus exchange will be built on the block bordered by Tuam, Colombo, Manchester, and Lichfield Streets, that a super stop will be added at the hospital and on Manchester Street, and that Kilmore and Salisbury Streets will be turned into two-way streets. She also explains that the speed limit will be dropped to 30 km/h in the area bordered by Rolleston Avenue, St Asaph Street, Madras Street, and Kilmore Street.

Research Papers, Lincoln University

The 48hr Design Challenge, run by the Christchurch City Council and held at Lincoln University, provided an opportunity for Council to gain inspiration from the design and architecture industry, while testing the draft Central City Plan currently being developed. The Challenge was a response to the recent earthquakes in Christchurch and brought together local and international talent. A total of 15 teams took part in the Challenge, with seven people in each including engineers, planners, urban designers, architects and landscape architects, as well as one student on each team. The four sites within the Red Zone included the Cathedral Square and BNZ Building; 160 Gloucester Street; the Orion NZ Building at 203 Gloucester Street; and 90 Armagh Street, including the Avon River and Victoria Square. The fifth site, which sits outside the Red Zone, is the former Christchurch Women’s Hospital at 885 Colombo Street. This is team SoLA's entry for 160 Gloucester Street.

Audio, Radio New Zealand

A review of the week's news including... The bill to fix botched EQC repairs from the Canterbury earthquakes is now four times what the previous Government predicted just two years ago, immigrants are being computer profiled, MPs are told that medicinal cannabis should be legalised for more people, Middlemore Hospital's woes continue, the Government orders a compulsory recall of 50 thousand vehicles with faulty airbags, Auckland drivers face a double tax hike under proposed sweeping changes to transport funding, Parliament changes the law so New Zealand men with historical homosexual convictions can have them wiped, a bus company wants to recruit more than 100 drivers from overseas because it can't find enough people to do the job here, Dunedin has its biggest weekend ever in terms of money spent thanks to Ed Sheeran, first it was closing - now it's not, Kaikohe's Warehouse is to stay, it all comes together for the New Zealand cricket team against England, an international consortium reaches a verbal agreement to buy the New Zealand Warriors and the woman who was RNZ's Washington correspondent for more than 20 years has died.

Research papers, University of Canterbury Library

Base isolation is arguably the most reliable method for providing enhanced protection of buildings against earthquake-induced actions, by virtue of a physical separation between the structure and the ground through elements/devices with controlled force capacity, significant lateral deformation capacity and (often) enhanced energy dissipation. Such a design solution has shown its effectiveness in protecting both structural and non-structural components, hence preserving their functionality even in the aftermath of a major seismic event. Despite lead rubber bearings being invented in New Zealand almost forty years ago, the Christchurch Women's hospital was the only isolated building in Christchurch when the Canterbury earthquake sequence struck in 2010/11. Furthermore, a reference code for designing base-isolated buildings in New Zealand is still missing. The absence of a design standard or at least of a consensus on design guidelines is a potential source for a lack of uniformity in terms of performance criteria and compliance design approaches. It may also limit more widespread use of the technology in New Zealand. The present paper provides an overview of the major international codes (American, Japanese and European) for the design of base-isolated buildings. The design performance requirements, the analysis procedures, the design review process and approval/quality control of devices outlined in each code are discussed and their respective pros and cons are compared through a design application on a benchmark building in New Zealand. The results gathered from this comparison are intended to set the basis for the development of guidelines specific for the New Zealand environment.

Research papers, Victoria University of Wellington

This dissertation contains three essays on the impact of unexpected adverse events on student outcomes. All three attempt to identify causal inference using plausibly exogenous shocks and econometric tools, applied to rich administrative data.  In Chapter 2, I present evidence of the causal effects of the 2011 Christchurch earthquake on tertiary enrolment and completion. Using the shock of the 2011 earthquake on high school students in the Canterbury region, I estimate the effect of the earthquake on a range of outcomes including tertiary enrolment, degree completion and wages. I find the earthquake causes a substantial increase in tertiary enrolment, particularly for low ability high school leavers from damaged schools. However, I find no evidence that low ability students induced by the earthquake complete a degree on time.  In Chapter 3, I identify the impact of repeat disaster exposure on university performance, by comparing outcomes for students who experience their first earthquake while in university, to outcomes for students with prior earthquake exposure. Using a triple-differences estimation strategy with individual-by-year fixed effects, I identify a precise null effect, suggesting that previous experience of earthquakes is not predictive of response to an additional shock two years later.  The final chapter investigates the impact of injuries sustained in university on academic performance and wages, using administrative data including no-fault insurance claims, emergency department attendance and hospital admissions, linked with tertiary enrolment. I find injuries, including minor injuries, have a negative effect on re-enrolment, degree completion and grades in university.

Research papers, University of Canterbury Library

The aim of this thesis was to examine the spatial and the temporal patterns of anxiety and chest pain resulting from the Canterbury, New Zealand earthquaeks. Three research objectives were identified: examine any spatial or termporal clusters of anxiety and chest pain; examine the associations between anxiety, chest pain and damage to neighbourhood; and determine any statistically significant difference in counts of anxiety and chest pain after each earthquake or aftershock which resulted in severe damage. Measures of the extent of liquefaction the location of CERA red-zones were used as proxy measures for earthquake damage. Cases of those who presented to Christchurch Public Hospital Emergency Department with either anxiety or chest pain between May 2010 and April 2012 were aggregated to census area unit (CAU) level for analysis. This thesis has taken a unique approach to examining the spatial and spatio-temporal variations of anxiety and chest pain after an earthquake and offers unique results. This is the first study of its kind to use a GIS approach when examining Canterbury specific earthquake damage and health variables at a CAU level after the earthquakes. Through the use of spatio-termporal scan modelling, negative and linear regression modelling and temporal linear modelling with dummy variables this research was able to conclude there are significant spatial and temporal variations in anxiety and chest pain resulting from the earthquakes. The spatio-termporal scan modelling identified a hot cluster of both anxiety and chest pain within Christchurch at the same time the earthquakes occurred. The negative binomial model found liquefaction to be a stronger predictor of anxiety than the Canterbury Earthquake Recovery Authority's (CERA) land zones. The linear regression model foun chest pain to be positively associated with all measures of earthquake damage with the exception of being in the red-zone. The temporal modelling identified a significant increase in anxiety cases one month after a major earthquake, and chest pain cases spiked two weeks after an earthquake and gradually decreased over the following five weeks. This research was limited by lack of control period data, limited measures of earthquake damage, ethical restrictions, and the need for population tracking data. The findings of this research will be useful in the planning and allocation of mental wellbeing resources should another similar event like the Canterbury Earthquakes occur in New Zealand.

Audio, Radio New Zealand

Questions to Ministers 1. CHRIS AUCHINVOLE to the Minister of Finance: What steps has the Government taken to make better use of its balance sheet to boost growth and jobs? 2. Hon ANNETTE KING to the Minister for Social Development and Employment: In light of her answer on behalf of the Prime Minister yesterday, that there is child poverty in New Zealand, what is the estimated cost of child poverty per year? 3. KATRINA SHANKS to the Minister for Communications and Information Technology: What progress has the Government made on rolling out ultra-fast broadband in Wellington? 4. GRANT ROBERTSON to the Minister of Health: Have hospital admissions for children with respiratory diseases and infectious diseases increased over the last three years; if so, by how much? 5. Dr RUSSEL NORMAN to the Minister of Agriculture: Will the Government adopt the OECD's 2011 recommendation that New Zealand implement water charging for agricultural uses? 6. SUE MORONEY to the Minister of Education: Does she stand by her commitment on The Nation on 20 August 2011, that low and middle income families would not pay more for 20 hours of early childhood education in the next three years if the Government is re-elected? 7. Hon TAU HENARE to the Minister for Social Development and Employment: What reports has she received on the latest benefit figures? 8. PHIL TWYFORD to the Minister of Transport: Does he endorse the transport elements of the draft Auckland Plan; if not, why not? 9. NICKY WAGNER to the Minister of Health: What steps has the Government taken to improve outpatient and other health services to the people of Canterbury following the earthquakes? 10. STUART NASH to the Minister of Finance: Does the Government's privatisation plan include parameters which would cause it to cancel sales, such as low sale prices or high dividend yields; if so, what are the parameters? 11. NIKKI KAYE to the Minister of Internal Affairs: What announcements has he made regarding the igovt scheme, and increasing online access to government services? 12. Hon RICK BARKER to the Minister of Veterans' Affairs: When can veterans expect a full response from the Government in response to the Law Commission report titled A New Support Scheme for Veterans: A Report on the Review of the War Pensions Act 1954 that was presented to Parliament on 1 June 2010? Questions to Members 1. CLARE CURRAN to the Chairperson of the Transport and Industrial Relations Committee: Has he requested any written submissions on the petition of George Laird, signed by nearly 14,000 people, calling the Government to retain the Hillside and Woburn workshops?

Audio, Radio New Zealand

Rt Hon WINSTON PETERS to the Prime Minister: Does he stand by all his statements? DAVID SHEARER to the Prime Minister: Does he stand by all his statements? PAUL GOLDSMITH to the Minister of Finance: What reports has he received on business and economic conditions in New Zealand? Dr RUSSEL NORMAN to the Prime Minister: Does he stand by his answer to written question 07314 (2013) when he said: "The inquiry team, itself, did not seek permission from Peter Dunne before it obtained his email logs" and does he think it should have? SIMON O'CONNOR to the Minister of Transport: How will the Government progress the delivery of the next generation of transport projects for Auckland? Hon DAVID PARKER to the Minister of Finance: Are the proceeds from selling power companies and other assets being used to pay down debt, to build schools and hospitals, to fund irrigation projects, to rebuild Christchurch, or to fund Auckland transport projects? IAN McKELVIE to the Minister of Police: What updates has she received on how Police are using technology to prevent crime? JACINDA ARDERN to the Minister of Finance: Does he agree with The Economist that "inequality is one of the biggest social, economic and political challenges of our time"; if so, what is his Government doing to address the fact that New Zealand now has the widest income gap since detailed records began? PAUL FOSTER-BELL to the Minister of Justice: How is the Government improving its justice and other services to local communities? Hon LIANNE DALZIEL to the Minister for Canterbury Earthquake Recovery: When was he first made aware of the September IANZ report which warned the Christchurch City Council that "Continued accreditation beyond May 2013 will depend on a satisfactory outcome of that assessment" and was he advised by CERA or a Ministerial colleague? JONATHAN YOUNG to the Minister of Broadcasting: What progress has been made on the regional rollout of the digital switchover for New Zealand television viewers? GARETH HUGHES to the Minister of Conservation: Will he implement the recommendations to protect Maui's dolphins contained in the report of this year's meeting of the International Whaling Commission Scientific Committee; if not, why not Questions to Members JACINDA ARDERN to the Chairperson of the Social Services Committee: On which date and time, if any, did he receive the Minister for Social Development's written responses to the pre-hearing questions for the 2013/14 Estimates review for Vote Social Development? JACINDA ARDERN to the Chairperson of the Social Services Committee: On what date did the Minister for Social Development appear before the Committee to answer questions regarding the 2013/14 Estimates review for Vote Social Development? Dr MEGAN WOODS to the Chairperson of the Education and Science Committee: Did he consider inviting the Minister to appear again to answer questions around responses to questions on the 2013/14 Estimates for Vote Education, if so, did he receive any advice about the Minister's willingness to appear again?

Audio, Radio New Zealand

Questions to Ministers 1. Hon RODNEY HIDE to the Acting Minister of Energy and Resources: Does she accept her Ministry's advice that the value of New Zealand's onshore minerals excluding hydrocarbons is $194 billion overall with $80 billion estimated in Schedule 4 land; if so, what plans does the Government have to allow their development? 2. Hon PHIL GOFF to the Minister for the Rugby World Cup: What advice has the Prime Minister, the Government or Rugby New Zealand 2011 been given on Christchurch's ability to host Rugby World Cup matches later this year? 3. CHESTER BORROWS to the Minister of Finance: What reports has he received on the economy's prospects after New Zealand meets the immediate challenges of the Christchurch earthquake? 4. Hon DAVID CUNLIFFE to the Minister for Communications and Information Technology: Would he indicate his agreement to a further extension, if it were required, to the report back date for the Telecommunications (TSO, Broadband and Other Matters) Amendment Bill? 5. TE URUROA FLAVELL to the Minister of Agriculture: Is he concerned to learn that New Zealand's first majority Māori-owned dairy company, Miraka, has reportedly stated that there is a serious risk that Fonterra's proposed Trading Among Farmers exchange will be illiquid, volatile and unstable; if so, what assurances can he give Miraka and other dairy processors and industry groups, that anti-competitive behaviour will not be tolerated? 6. Hon DAVID PARKER to the Acting Minister for Economic Development: Has he been advised by the Prime Minister whether his appointment as Acting Minister for Economic Development is temporary or expected to carry on to the election? 7. JO GOODHEW to the Minister of Education: What progress has been made on re-opening Christchurch schools and early childhood education centres since the 22 February earthquake? 8. GRANT ROBERTSON to the Minister of Health: Does he favour the sale of any public hospitals in New Zealand; if so, which one or ones? 9. SIMON BRIDGES to the Minister for Building and Construction: What advice has he received from the Department of Building and Housing regarding last month's Christchurch earthquake? 10. DARIEN FENTON to the Minister of Labour: What factors did she consider in deciding to increase the minimum wage by 25 cents from 1 April in her latest review? 11. CHRIS TREMAIN to the Minister of Transport: What progress has been made on roading projects in the Hawke's Bay region? 12. GARETH HUGHES to the Minister of Finance: What steps, if any, is he taking to reduce New Zealand's economic vulnerability that stems from dependence on oil? Questions to Members 1. Hon DAVID CUNLIFFE to the Chairperson of the Finance and Expenditure Committee: How many submissions have been received so far on the Telecommunications (TSO, Broadband and Other Matters) Amendment Bill? 2. Hon DAVID CUNLIFFE to the Chairperson of the Finance and Expenditure Committee: How many submitters on the Telecommunications (TSO, Broadband and Other Matters) Amendment Bill have requested an oral hearing? 3. Hon DAVID CUNLIFFE to the Chairperson of the Finance and Expenditure Committee: Is he aware of any complaints about times allocated to submitters on the Telecommunications (TSO, Broadband and Other Matters) Amendment Bill?

Research papers, University of Canterbury Library

In this thesis, focus is given to develop methodologies for rapidly estimating specific components of loss and downtime functions. The thesis proposes methodologies for deriving loss functions by (i) considering individual component performance; (ii) grouping them as per their performance characteristics; and (iii) applying them to similar building usage categories. The degree of variation in building stock and understanding their characteristics are important factors to be considered in the loss estimation methodology and the field surveys carried out to collect data add value to the study. To facilitate developing ‘downtime’ functions, this study investigates two key components of downtime: (i) time delay from post-event damage assessment of properties; and (ii) time delay in settling the insurance claims lodged. In these two areas, this research enables understanding of critical factors that influence certain aspects of downtime and suggests approaches to quantify those factors. By scrutinising the residential damage insurance claims data provided by the Earthquake Commission (EQC) for the 2010- 2011 Canterbury Earthquake Sequence (CES), this work provides insights into various processes of claims settlement, the time taken to complete them and the EQC loss contributions to building stock in Christchurch city and Canterbury region. The study has shown diligence in investigating the EQC insurance claim data obtained from the CES to get new insights and build confidence in the models developed and the results generated. The first stage of this research develops contribution functions (probabilistic relationships between the expected losses for a wide range of building components and the building’s maximum response) for common types of claddings used in New Zealand buildings combining the probabilistic density functions (developed using the quantity of claddings measured from Christchurch buildings), fragility functions (obtained from the published literature) and cost functions (developed based on inputs from builders) through Monte Carlo simulations. From the developed contribution functions, glazing, masonry veneer, monolithic and precast concrete cladding systems are found to incur 50% loss at inter-storey drift levels equal to 0.027, 0.003, 0.005 and 0.011, respectively. Further, the maximum expected cladding loss for glazing, masonry veneer, monolithic, precast concrete cladding systems are found to be 368.2, 331.9, 365.0, and 136.2 NZD per square meter of floor area, respectively. In the second stage of this research, a detailed cost breakdown of typical buildings designed and built for different purposes is conducted. The contributions of structural and non- structural components to the total building cost are compared for buildings of different usages, and based on the similar ratios of non-structural performance group costs to the structural performance group cost, four-building groups are identified; (i) Structural components dominant group: outdoor sports, stadiums, parkings and long-span warehouses, (ii) non- structural drift-sensitive components dominant group: houses, single-storey suburban buildings (all usages), theatres/halls, workshops and clubhouses, (iii) non-structural acceleration- sensitive components dominant group: hospitals, research labs, museums and retail/cold stores, and (iv) apartments, hotels, offices, industrials, indoor sports, classrooms, devotionals and aquariums. By statistically analysing the cost breakdowns, performance group weighting factors are proposed for structural, and acceleration-sensitive and drift-sensitive non-structural components for all four building groups. Thus proposed building usage groupings and corresponding weighting factors facilitate rapid seismic loss estimation of any type of building given the EDPs at storey levels are known. A model for the quantification of post-earthquake inspection duration is developed in the third stage of this research. Herein, phase durations for the three assessment phases (one rapid impact and two rapid building) are computed using the number of buildings needing inspections, the number of engineers involved in inspections and a phase duration coefficient (which considers the median building inspection time, efficiency of engineer and the number of engineers involved in each assessment teams). The proposed model can be used: (i) by national/regional authorities to decide the length of the emergency period following a major earthquake, and estimate the number of engineers required to conduct a post-earthquake inspection within the desired emergency period, and (ii) to quantify the delay due to inspection for the downtime modelling framework. The final stage of this research investigates the repair costs and insurance claim settlement time for damaged residential buildings in the 2010-2011 Canterbury earthquake sequence. Based on the EQC claim settlement process, claims are categorized into three groups; (i) Small Claims: claims less than NZD15,000 which were settled through cash payment, (ii) Medium Claims: claims less than NZD100,000 which were managed through Canterbury Home Repair Programme (CHRP), and (iii) Large Claims: claims above NZD100,000 which were managed by an insurance provider. The regional loss ratio (RLR) for greater Christchurch for three events inducing shakings of approximate seismic intensities 6, 7, and 8 are found to be 0.013, 0.066, and 0.171, respectively. Furthermore, the claim duration (time between an event and the claim lodgement date), assessment duration (time between the claim lodgement day and the most recent assessment day), and repair duration (time between the most recent assessment day and the repair completion day) for the insured residential buildings in the region affected by the Canterbury earthquake sequence is found to be in the range of 0.5-4 weeks, 1.5- 5 months, and 1-3 years, respectively. The results of this phase will provide useful information to earthquake engineering researchers working on seismic risk/loss and insurance modelling.