Search

found 146 results

Research papers, University of Canterbury Library

This paper provides a comparison between the strong ground motions observed in the Christchurch central business district in the 4 September 2010 Mw7.1 Darfield, and 22 February 2011 Mw6.3 Christchurch earthquakes with those observed in Tokyo during the 11 March 2011 Mw9.0 Tohoku earthquake. Despite Tokyo being located approximately 110km from the nearest part of the causative rupture, the ground motions observed from the Tohoku earthquake were strong enough to cause structural damage in Tokyo and also significant liquefaction to loose reclaimed soils in Tokyo bay. Comparisons include the strong motion time histories, response spectra, significant durations and arias intensity. The implications for large earthquakes in New Zealand are also briefly discussed.

Images, UC QuakeStudies

The entrance to the West Avon building on Montreal Street. The photographer comments, "This very wonderful Art Deco heritage building in Christchurch had residents living in it until another visit from the building engineers re-re-checking for earthquake damage. Now it is fenced off and on the list for possible demolition".

Images, UC QuakeStudies

The top of the water slides in the QEII swimming pool, exposed by its demolition. The slides themselves have been broken off, leaving only the entry points. The photographer comments, "After assessment of the damage caused by the numerous earthquakes in Christchurch, New Zealand they decided to demolish the QEII stadium and it's swimming pool".

Research papers, University of Canterbury Library

Earthquake Engineering is facing an extraordinarily challenging era, the ultimate target being set at increasingly higher levels by the demanding expectations of our modern society. The renewed challenge is to be able to provide low-cost, thus more widely affordable, high-seismic-performance structures capable of sustaining a design level earthquake with limited or negligible damage, minimum disruption of business (downtime) or, in more general terms, controllable socio-economical losses. The Canterbury earthquakes sequence in 2010-2011 has represented a tough reality check, confirming the current mismatch between societal expectations over the reality of seismic performance of modern buildings. In general, albeit with some unfortunate exceptions, modern multi-storey buildings performed as expected from a technical point of view, in particular when considering the intensity of the shaking (higher than new code design) they were subjected to. As per capacity design principles, plastic hinges formed in discrete regions, allowing the buildings to sway and stand and people to evacuate. Nevertheless, in many cases, these buildings were deemed too expensive to be repaired and were consequently demolished. Targeting life-safety is arguably not enough for our modern society, at least when dealing with new building construction. A paradigm shift towards damage-control design philosophy and technologies is urgently required. This paper and the associated presentation will discuss motivations, issues and, more importantly, cost-effective engineering solutions to design buildings capable of sustaining low-level of damage and thus limited business interruption after a design level earthquake. Focus will be given to the extensive research and developments in jointed ductile connections based upon controlled rocking & dissipating mechanisms for either reinforced concrete and, more recently, laminated timber structures. An overview of recent on-site applications of such systems, featuring some of the latest technical solutions developed in the laboratory and including proposals for the rebuild of Christchurch, will be provided as successful examples of practical implementation of performance-based seismic design theory and technology.

Images, Alexander Turnbull Library

Shows a happy crowd playing in the sea and sand in the Christchurch Square. Bishop Victoria Matthews is seen balancing on the Wizard of Christchurch who has turned himself into a surfboard. Context: refers to a proposal by Bishop of Christchurch Victoria Matthews that the earthquake-damaged Square could be made "welcoming and engaging" again by transforming it into an artificial beach with large movie screens. Quantity: 1 digital cartoon(s).

Research papers, Lincoln University

Lincoln University and CBRE, a commercial real estate service provider, have conducted research to investigate the impacts of the Canterbury earthquake on the commercial office market in Christchurch. The 22 February 2011 Canterbury earthquake had a devastating impact on Christchurch property with significant damage caused to land and buildings. As at January 2012, around 740 buildings have either been demolished or identified to be demolished in central Christchurch. On top of this, around 140 buildings have either been partially demolished or identified to be partially demolished. The broad aims of our research are to (i) examine the nature and extent of the CBD office relocation, (ii) identify the nature of the occupiers, (iii) determine occupier’s perceptions of the future: their location and space needs post the February earthquake, and the likelihood of relocating back to the CBD after the rebuild, and (iv) find out what occupiers see as the future of the CBD, and how they want this to look.

Images, Alexander Turnbull Library

Refers to the controversy over the decision to demolish the Christchurch Cathedral which was severely damaged in the earthquakes of 2010 and 2011. The Anglican Bishop of Christchurch Victoria Mathews says the decision to demolish the cathedral was reached through prayer, great deliberation and with the utmost concern for safety. The Bishop says a number of options were considered before deciding to bring the walls down but the turning point was 23 December 2011, when a series of strong quakes rocked the city. At that stage the Canterbury Earthquake Authority approached the church. "CERA told us that our plans for making safe and retrieving, and then stepping back and making further decisions were no longer adequate." Christchurch City council announced their support on Twitter this afternoon (17 May 2012) - tweeting an endorsement to an immediate pause on demolition of the Cathedral to enable deeper and more open consideration of options. Quantity: 1 digital cartoon(s).

Images, Alexander Turnbull Library

Shows a shamrock superimposed on the city of Christchurch. It represents the green zone. Context: Probably refers to the zoning review process for those insured residential property owners who wish to query their land zoning. Zoning of flat land in greater Christchurch began in June last year and was completed last month. Over that period 7253 properties were zoned red as unsuitable for residential occupation due to significant earthquake damage; while a further 180,000 properties were zoned green as suitable for residential occupation, some with conditions. (rebuildchristchurch, 15 June 2012) Quantity: 1 digital cartoon(s).

Images, UC QuakeStudies

A digitally manipulated image of the Lawrie and Wilson Auctioneers building on Tuam Street. The photographer comments, "This building at 210 Tuam Street is still off limits after the Christchurch earthquake. It has Lawrie and Wilson Auctioneers at the top and Christchurch City Council below. In the past it had a City Photography and at a different time a Parking Unit sign".

Images, eqnz.chch.2010

8 Velsheda Street, Bexley, Christchurch, across the road from my house was demolished a week or so ago, just one of many demolitions of Red Zone properties at the moment. This house was about ten years old and suffered land damage during the 4th September 2010 and 22nd February 2011 earthquakes. The same fate awaits my house later in the year o...

Images, Alexander Turnbull Library

Cartoon drawn in the style of a pen and ink drawing of the broken Christchurch Cathedral. One version has 'RIP' printed above the non-existant spire and the second has 'RIP' and the words 'Rest in Pieces'. A decision has been made to demolish the cathedral which was severely damaged by the earthquakes of 2010 and 2011. Two versions of this cartoon are available Title from file name Quantity: 2 digital cartoon(s).

Images, UC QuakeStudies

Broken windows on the Orion building on Manchester Street. The photographer comments, "Bob Brown's Hi-Fi was damaged, as you can see, in the Christchurch earthquake on the 22 February 2011. At lot of buildings in the area have been demolished, but this art deco style structure might have not have been put on the demolition list yet".

Research papers, University of Canterbury Library

The earthquake sequence has resulted in significant physical and reputational damage to the Canterbury tourism industry. Eighteen months after the earthquakes inbound tourism data is still below pre-earthquake levels, with Canterbury operators reporting that the industry has not bounced back to where it was before September 2010. Outcomes of the earthquakes on business performance highlight there were winners and losers in the aftermath. Recovery of inbound tourism markets is closely tied to the timeframe to rebuild the CBD of Christchurch. Reinstating critical tourism infrastructure will drive future tourism investment, and allow tourism businesses to regenerate and thrive into the future. A blueprint for rebuilding the CBD of Christchurch was released by the Christchurch City Council in July 2012, and has been well received by tourism stakeholders in the region. The challenge now is for city officials to fund the development projects outlined in the blueprint, and to rebuild the CBD as quickly as possible in order to help regenerate the tourism industry in Christchurch, Canterbury and the rest of the South Island

Images, UC QuakeStudies

Glass panels with brass surrounds, stacked inside a building. The photographer comments, "These were brass dividers that were brought inside the building two years ago after the Christchurch earthquake. They have been sitting there abandoned in a restaurant that will be either repaired and reopened at a later date or demolished like the many others of its kind".

Research papers, University of Canterbury Library

The Canterbury earthquake sequence in New Zealand’s South Island induced widespread liquefaction phenomena across the Christchurch urban area on four occasions (4 Sept 2010; 22 Feb; 13 June; 23 Dec 2011), that resulted in widespread ejection of silt and fine sand. This impacted transport networks as well as infiltrated and contaminated the damaged storm water system, making rapid clean-up an immediate post-earthquake priority. In some places the ejecta was contaminated by raw sewage and was readily remobilised in dry windy conditions, creating a long-term health risk to the population. Thousands of residential properties were inundated with liquefaction ejecta, however residents typically lacked the capacity (time or resources) to clean-up without external assistance. The liquefaction silt clean-up response was co-ordinated by the Christchurch City Council and executed by a network of contractors and volunteer groups, including the ‘Farmy-Army’ and the ‘Student-Army’. The duration of clean-up time of residential properties and the road network was approximately 2 months for each of the 3 main liquefaction inducing earthquakes; despite each event producing different volumes of ejecta. Preliminary cost estimates indicate total clean-up costs will be over NZ$25 million. Over 500,000 tonnes of ejecta has been stockpiled at Burwood landfill since the beginning of the Canterbury earthquakes sequence. The liquefaction clean-up experience in Christchurch following the 2010-2011 earthquake sequence has emerged as a valuable case study to support further analysis and research on the coordination, management and costs of large volume deposition of fine grained sediment in urban areas.

Images, UC QuakeStudies

A digitally manipulated image of the damaged statue of Scott which was removed from its original site beside Worcester Boulevard for safekeeping. The photographer comments, "During the February 2011 earthquake in Christchurch, New Zealand the statue of Robert Falcon Scott broke across the ankles and most of the statue came crashing to the ground. To commemorate a 100 years of association with Antarctica Christchurch council has laid out for viewing the statue in a prostrate position. I was lucky to encounter the statue before it was put into its glass display enclosure".

Images, UC QuakeStudies

A digitally manipulated image of the high diving boards at QEII swimming pool. Rubble has fallen on the boards during the demolition of the complex. A sign reads "Poseidon Extreme". The photographer comments, "I do not know what Poseidon Extreme at this swimming pool looked like before the earthquake damaged it, but it looks really radical now during it's demolition. A strange coincidence is that Poseidon is referred to as 'Earth-Shaker' due to his role in causing earthquakes. So the demolition of this pool due to the series of quakes in Christchurch all seems to be foretold by the gods and that sign".

Images, UC QuakeStudies

A building on St Asaph Street has been demolished, exposing the interior structure of the adjoining building. The photographer comments, "The building that this one was part of has been demolished and the join looks very much like the exterior walls of an Anglo-Saxon house. It has been exposed due to the demolition of damaged buildings after the Christchurch earthquake".

Images, UC QuakeStudies

A digitally manipulated photograph of a letterbox lying on the ground in front of a red-stickered house. The photographer comments, "An abandoned red stickered house just outside the four avenues that surround Christchurch CBD. The letterbox came down when the wall it was attached to collapsed. The occupants would have had strict instructions to stay out as the property is too dangerous to enter in case there is another earthquake or big aftershock".

Research papers, Lincoln University

The scale of damage from a series of earthquakes across Christchurch Otautahi in 2010 and 2011 challenged all networks in the city at a time when many individuals and communities were under severe economic pressure. Historically, Maori have drawn on traditional institutions such as whanau, marae, hapu and iwi in their endurance of past crises. This paper presents research in progress to describe how these Maori-centric networks supported both Maori and non-Maori through massive urban dislocation. Resilience to any disaster can be explained by configurations of economic, social and cultural factors. Knowing what has contributed to Maori resilience is fundamental to the strategic enhancement of future urban communities - Maori and non-Maori.

Images, UC QuakeStudies

A digitally manipulated image of furniture and machinery. The photographer comments, "This furniture restoration company got caught in the middle of the Christchurch earthquake and lost a whole wall. After constant exposure to the elements everything now needs a bit of restoration. They are now working in a different part of Christchurch, but their past can still be seen".

Videos, UC QuakeStudies

A video about people buying marmite from the Fresh Choice supermarket in Merivale. The supermarket has a secret stash of marmite which they have made available to customers in exchange for a bank note. The bank notes will be donated to the Christchurch Women's Refuge. Marmite went missing from supermarket shelves across the country after the 22 February 2011 earthquake damaged the factory in Christchurch.

Images, UC QuakeStudies

A digitally manipulated image of a daffodil placed on the gates of QEII Stadium. The photographer comments, "Someone placed a daffodil on the gates to the QEII Stadium in Christchurch. The stadium is being razed to the ground after being very badly damaged in the Christchurch earthquakes. Besides being a Commonwealth Games stadium it was also housed one of the best swimming pools in the region".

Images, UC QuakeStudies

A protest sign painted on a fence shows an image of the cathedral spire and the words "Save + restore, stone by precious stone!" The photographer comments, "The Christchurch Cathedral got very badly damaged in the earthquake. It was being demolished down to a safe level before a major protest managed to stop it going too far. There is still an ongoing debate on what to do with the Cathedral. In the meantime a cardboard cathedral made out of a steel framework and massive toilet roll tubes is being constructed close by. This is to the right of the protest about the closure of Christchurch schools".

Research papers, University of Canterbury Library

The Christchurch earthquake sequence has been on-going since September 4th 2010. The largest two earthquakes, magnitude (M) 7.1 on September 4th and the M 6.3 on February 22nd 2011 caused immediate and significant damage to the city of Christchurch. As a consequence of the earthquakes, the tourism sector in the Canterbury region has been heavily impacted, with broader impacts being felt throughout the South Island. Resilient Organisations and the University of Canterbury began a series of quantitative investigations into the recovery and response of key business sectors to the earthquakes. The purpose of this study was to build on this work by exploring the outcomes of the earthquakes on the tourism sector, a critical economic driver in the region. Two postal surveys were sent to 719 tourism business managers; the first to businesses in the ‘Impact Zone’ defined as areas that experienced Modified Mercalli intensities greater than 6. The second survey was sent to the remaining businesses throughout the Canterbury region (‘Rest of Canterbury’). Response rates were 46% response for the Impact Zone, and 29% for the Rest of Canterbury. Key findings:

Audio, Radio New Zealand

Topics - the latest twist in the Kim Dotcom saga is that the police have announced they're investigating the Government Communications Security Bureau's illegal surveillance of the internet mogul. New research has shown that membership of all mainstream Christian denominations has fallen to historic lows - except for Catholicism. New research has uncovered the role underground rock structures played in stopping the September 2010 Christchurch earthquake from linking up with the Port Hills faultline and causing greater damage to Christchurch.

Videos, UC QuakeStudies

A video of an interview with a family who are living in a shed. The family lost their rental property after the owners' other property was damaged by the 22 February 2011 earthquake. The family are one of many living in sheds, garages, and tents despite the government's claim that there is no housing crisis in Christchurch.

Images, UC QuakeStudies

A digitally manipulated image of Latimer Square. The photographer comments, "It is so nice to stand in the middle of Latimer Square on a bright Winter's day and forget the havoc that is around you. The square has hardly been touched by the Christchurch earthquake, but it is surrounded by demolished and damaged buildings".

Research papers, University of Canterbury Library

The devastating magnitude M6.3 earthquake, that struck the city of Christchurch at 12:51pm on Tuesday 22 February 2011, caused widespread damage to the lifeline systems. Following the event, the Natural Hazard Research Platform (NHRP) of New Zealand funded a short-term project “Recovery of Lifelines” aiming to: 1) coordinate the provision of information to meet lifeline short-term needs; and to 2) facilitate the accessibility to lifelines of best practice engineering details, along with hazards and vulnerability information already available from the local and international scientific community. This paper aims to briefly summarise the management of the recovery process for the most affected lifelines systems, including the electric system, the road, gas, and the water and wastewater networks. Further than this, the paper intends to discuss successes and issues encountered by the “Recovery of Lifelines” NHRP project in supporting lifelines utilities.