Search

found 374 results

Videos, UC QuakeStudies

A video of a public forum being held to discuss the Anglican Church's three options for the restoration of the ChristChurch Cathedral. The three options are restoring the original cathedral, reinterpreting the original cathedral in modern materials, or building a contemporary cathedral. The video includes footage of speeches by Bishop Victoria Matthews and RCP project manager Marcus Read. It also includes footage of Matthews, Read, and Warren and Mahoney architect Bill Gregory answering questions from the public.

Images, UC QuakeStudies

Damage to the north side of the cathedral. A walkway from Gloucester Street to the Square was opened up for a few days to allow the public a closer look at the cathedral. Weeds can be seen growing around the war memorial in Cathedral Square.

Images, UC QuakeStudies

A digital copy of a painting by Julia Holden. The painting is of the badly-damaged ChristChurch Cathedral, behind a temporary hoarding. The hoarding has been constructed on part of the footpath around Cathedral Square.