Search

found 175 results

Images, eqnz.chch.2010

20130808_2293_1D3-40 New Brighton bridge Still awaiting a repair, but with so many bridges closed or partially closed we are lucky this one had what maybe minor damage. #4074

Images, eqnz.chch.2010

20130808_2296_1D3-40 New Brighton bridge Prior to the earthquakes the stone wall at right was near road level. Now it is about 1.5m (4-5ft) lower. #4075

Images, eqnz.chch.2010

20130808_2288_1D3-40 Awaiting demoloition Two relatively new town houses in the Bexley "Red Zone". Awaiting demolition due to severe land problems. Have been vandalised. #4073

Images, eqnz.chch.2010

Awaiting the demolition ball! See the hole punched in by the neighbouring building (now demolished) during the February 22 2011 earthquake. This building is leaning to the north (left) while it's now demolished neighbour was leaning to the south (right). All because the crap land gave way underneath!

Images, eqnz.chch.2010

20130211_2645_1D3-840 South New Brighton bridge damage (under repair) Earthquake damage (that right hand abutment should be vertical with the bridge and the hand rail level). Bridge is closed to eastbound traffic (to left) and has a 3500kg weight limit as well. The eastern approach is the same. Damage caused mainly in the 04/09/10 and 22/02/11...