Members of the USAID Disaster Assistance Response Team (DART) and New Zealand Urban Search and Rescue in a building which was severely damaged during the 22 February 2011 earthquake.
One portrait colour digital photograph taken on 19 November 2011 showing the flyers in the window of the Lyttelton Information Centre on Oxford Street. The building was closed from 22 February 2011 until April 2013 due to the danger posed by the neighbouring building and then while repairs were scheduled and carried out. The flyers provided a sn...
Page 5 of Section A of the South Island edition of the Christchurch Press, published on Wednesday 24 August 2011.
Rubble from TJ's Kazbah on the corner of Marine Parade and Bowhill Road. The Ozone Hotel is visible in the foreground. The photographer comments, "A bike ride to New Brighton and the beach 3 weeks after the Feb 22 quake. Roads were still very rough and under reconstruction. There was a building on the corner, but not now".
The Royal Commission into the Canterbury Earthquakes continues today, with overseas experts critiquing a New Zealand report that calls for a two-billion dollar upgrade to strengthen earthquake-prone buildings.
One landscape colour digital photograph taken on 19 November 2011 showing Grubb Cottage on London Street. The rear portion of this building was built in 1851 and is regarded as one of the oldest buildings in Canterbury. It was sold in 2006 to the Christchurch City Council and vested in the Grubb Cottage Heritage Trust. In August 2013 the buildi...
A huge team of engineers is in Christchurch to assess the state of buildings damaged but still standing after Tuesday's earthquake.
We hear the latest from Latimer Square where a make-shift hospital has been set-up outside the Canterbury TV building.
The Royal Commission of Inquiry into the Canterbury earthquakes concludes its hearing into the collapse of the Pyne Gould building today.
Today marks one week since the devastating earthquake struck Christchurch. Work within the cordon is continuing.
A video about the New Zealand Army's engineers working with the Christchurch City Council and community centres to secure buildings in Christchurch, set up bases in Latimer Square, and fix infrastructure such as Burwood Hospital's water supply.
A video about the removal of the dome of the Cathedral of the Blessed Sacrament on Barbadoes Street. The dome is being removed in order to take weight off the building and help stabilise the lower sections.
The Christchurch City Council has been questioned over whether it was playing russian roulette with its citizens with its rules on earthquake prone buildings.
Aerial footage of Christchurch recorded the day after the 22 February 2011 earthquake. The footage shows damage to the Smith City car park, the Cathedral of the Blessed Sacrament, the CTV Building, the PGC Building, the Durham Street Methodist Church, the Lyttelton Timeball Station, the roads alongside the Avon River, and the ChristChurch Cathedral. It also shows New Zealand Army road blocks outside the hospital, crushed buses on Colombo Street, a Royal New Zealand Navy vessel in Lyttelton Harbour, rock fall on the Summit Road, collapsed cliffs in Sumner and Redcliffs, tents set up in a park, flooding in New Brighton, and liquefaction in QEII Park.
The title reads 'Future Christchurch CBD?...' Two people stare at numerous large featureless blocks across the Avon River. One says 'Those buildings look pretty ugly' and the other points out that they are 'just the piles'. Context: The Christchurch City Council is moving to impose urban-design etiquette and avert architectural mistakes such as clashing with the neighbours, glaring corporate colours and the long, blank walls common to most suburban shopping malls. The proposed rules will be overseen by an urban-design panel of four experts drawn from a pool of 12 architects, designers, planners and valuers. Quantity: 1 digital cartoon(s).
The building that housed the New Zealand College of Early Childhood Education and Antiqueworld has been cordoned off. Spray painted marks left by USAR after it was checked can still be seen.
One portrait colour digital photograph taken on 25 February 2011 showing the damaged façade of a two storey shop on Norwich Quay. The brick wall has completely fallen off the top storey and crushed a car parked on the footpath outside. Damage to the Lyttelton Hotel is visible to the left of the photo. The design of many older commercial build...
Photograph captioned by Fairfax, "Emma Howard was married today to Chris Greenslade at the Christ the King church centre on Greers Road, Burnside. Howard was pulled out of the collapsed PGC building after February 22nd earthquake in Christchurch".
Photograph captioned by Fairfax, "Emma Howard was married today to Chris Greenslade at the Christ the King church centre on Greers Road, Burnside. Howard was pulled out of the collapsed PGC building after February 22nd earthquake in Christchurch".
Photograph captioned by Fairfax, "Emma Howard was married today to Chris Greenslade at the Christ the King church centre on Greers Road, Burnside. Howard was pulled out of the collapsed PGC building after February 22nd earthquake in Christchurch".
An image from a Army News March 2011 photo compilation titled, "All in a Days Work". The image is captioned, "The burnt out lift well and staircase of the Canterbury Television building where 95 people are believed to have perished".
Page 3 of Section A of the South Island edition of the Christchurch Press, published on Friday 12 August 2011.
Page 1 of Section A of the South Island edition of the Christchurch Press, published on Monday 18 July 2011.
One landscape colour digital photograph taken on 6 September 2011 showing demolition of the former Convent of Our Lady of Mercy. St Mary's School, run by the Sisters of Mercy, was also housed in this building. At the time of the 4 September 2010 earthquake the building was a private residence. Three years after the 2010-2011 earthquakes there a...
Photograph captioned by BeckerFraserPhotos, "This stack of containers protect the facade of New Excelsior Backpackers. Corner of Manchester and Lichfield Streets".
The sequence of earthquakes that has greatly affected Christchurch and Canterbury since September 2010 has again demonstrated the need for seismic retrofit of heritage unreinforced masonry buildings. Commencing in April 2011, the damage to unreinforced stone masonry buildings in Christchurch was assessed and recorded with the primary objective being to document the seismic performance of these structures, recognising that they constitute an important component of New Zealand’s heritage architecture. A damage statistics database was compiled by combining the results of safety evaluation placarding and post-earthquake inspections, and it was determined that the damage observed was consistent with observations previously made on the seismic performance of stone masonry structures in large earthquakes. Details are also given on typical building characteristics and on failure modes observed. Suggestions on appropriate seismic retrofit and remediation techniques are presented, in relation also to strengthening interventions that are typical for similar unreinforced stone masonry structures in Europe.
A video of the opening night of the Heathcote Valley Inn. The inn has been rebuilt, after the 133-year-old original inn was damaged in the 4 September 2010 earthquake. Mayor Bob Parker officially opens the new building.
Currently there is a worldwide renaissance in timber building design. At the University of Canterbury, new structural systems for commercial multistorey timber buildings have been under development since 2005. These systems incorporate large timber sections connected by high strength post-tensioning tendons, and timber-concrete composite floor systems, and aim to compete with existing structural systems in terms of cost, constructability, operational and seismic performance. The development of post-tensioned timber systems has created a need for improved lateral force design approaches for timber buildings. Current code provisions for seismic design are based on the strength of the structure, and do not adequately account for its deformation. Because timber buildings are often governed by deflection, rather than strength, this can lead to the exceedence of design displacement limitations imposed by New Zealand codes. Therefore, accurate modeling approaches which define both the strength and deformation of post-tensioned timber buildings are required. Furthermore, experimental testing is required to verify the accuracy of these models. This thesis focuses on the development and experimental verification of modeling approaches for the lateral force design of post-tensioned timber frame and wall buildings. The experimentation consisted of uni-direcitonal and bi-directional quasi-static earthquake simulation on a two-thirds scale, two-storey post-tensioned timber frame and wall building with timber-concrete composite floors. The building was subjected to lateral drifts of up to 3% and demonstrated excellent seismic performance, exhibiting little damage. The building was instrumented and analyzed, providing data for the calibration of analytical and numerical models. Analytical and numerical models were developed for frame, wall and floor systems that account for significant deformation components. The models predicted the strength of the structural systems for a given design performance level. The static responses predicted by the models were compared with both experimental data and finite element models to evaluate their accuracy. The frame, wall and floor models were then incorporated into an existing lateral force design procedure known as displacement-based design and used to design several frame and wall structural systems. Predictions of key engineering demand parameters, such as displacement, drift, interstorey shear, interstorey moment and floor accelerations, were compared with the results of dynamic time-history analysis. It was concluded that the numerical and analytical models, presented in this thesis, are a sound basis for determining the lateral response of post-tensioned timber buildings. However, future research is required to further verify and improve these prediction models.
The Education Minister is waiting for the Canterbury Earthquake Royal Commission to report back before considering a national survey of all school buildings in the country.
Uneven paving along the tram tracks on New Regent Street. USAR codes have been spray-painted on the buildings behind. Many have scaffolding holding up their awnings and on their front walls.