Search

found 12544 results

Images, UC QuakeStudies

A sign above the closed shutter of a building in Wainoni reads "Open 7 days". The photographer comments, "A Sunday afternoon ride to New Brighton, then back via Aranui, Wainoni, Dallington, and Richmond. Not a cheerful experience. Open 7 days. This Wainoni car parts shop was definitely not open today".

Images, UC QuakeStudies

Photograph captioned by Fairfax, "Aftermath of the earthquake in Christchurch where the cleanup has begun. Teams of building inspectors gathered at the Linwood Service Centre before heading into the eastern suburbs en masse. Movement around Dallington Terrace was varied. The Medway Street footbridge from River Road to Avonside Drive".

Images, UC QuakeStudies

A photograph looking west down Cashel Street towards the intersection with Manchester. On the right is a severely damaged building. Rubble from the top storey has fallen onto the street. In the distance, the Grand Chancellor can be seen, with the slump in the left side noticeable.

Videos, UC QuakeStudies

A video of a press conference with Bishop Victoria Matthews in the Botanic Gardens about the plans for the earthquake-damaged ChristChurch Cathedral. Matthews announces that the cathedral will be deconstructed, allowing the safe retrieval of taonga and heritage items within the building.

Images, UC QuakeStudies

A member of the University of Canterbury's E-Learning team in their temporary office in the James Hight building. The photographer comments, "First looks at our new temporary (maybe) office space. Our group will stay here until April or May 2011, then will move to another floor in the Central Library. Room 709 sofas".

Images, UC QuakeStudies

A member of the University of Canterbury's E-Learning team in their temporary office in the James Hight building. The photographer comments, "First looks at our new temporary (maybe) office space. Our group will stay here until April or May 2011, then will move to another floor in the Central Library. Our office, Room 709".

Images, UC QuakeStudies

A photograph of the site of a demolished building on the corner of Manchester and Hereford Streets. To the right, the Treehouse Bar can be seen. Bricks from the façade have crumbled and fallen onto the street. Road cones have been placed in front as a warning.

Images, UC QuakeStudies

The University of Canterbury's E-Learning team's temporary office in the James Hight building. The photographer comments, "First looks at our new temporary (maybe) office space. Our group will stay here until April or May 2011, then will move to another floor in the Central Library. Jess's desk. Viewed from my side of the couch".

Images, UC QuakeStudies

Road cones and a detour sign in front of a graffitied building in Wainoni. The photographer comments, "A Sunday afternoon ride to New Brighton, then back via Aranui, Wainoni, Dallington, and Richmond. Not a cheerful experience. Car parts shop, Wainoni. The lack of activity in the east is spooky at times".

Images, UC QuakeStudies

People gather in a fenced-off area of Cathedral Square to view the damage to the cathedral and surrounding buildings. In the centre is the plinth which formerly held the statue of John Robert Godley. Taken on a day when a walkway was opened up between Re:Start Mall and Cathedral Square to allow temporary public access.

Audio, Radio New Zealand

The government has announced hundreds of new carparks it hopes will solve the ongoing issues at Christchurch Hospital. Parking was significantly reduced after the earthquakes - forcing patients, visitors and staff to park far away and walk, or catch a shuttle to the hospital. The government's pledging a new building and extension of staff car-parking. Sally Murphy reports.

Audio, Radio New Zealand

The Fire Service responds to the Coroner's criticisms over the CTV building collapse in the Christchurch Earthquakes, Teina Pora will be released on parole after 21 years inside prison for crimes he says he did'nt commit, and in Dateline Pacific, A newly elected leader in Fiji issues a challenge to Rear Admiral Franf Bainimarama.

Audio, Radio New Zealand

University of Canterbury geologist Mark Quigley has earned a reputation for being a great science communicator on the subject of earthquakes. But when he's not in the media spotlight, he's out and about around Canterbury building a picture of the region's tectonic history, and trying to understand what might happen in the future.

Audio, Radio New Zealand

A huge milestone in the rebuild of the Christchurch Cathedral. Twelves years since the Canterbury earthquakes caused extensive damage to the building, community leaders and project managers have gathered inside the cathedral this morning for the first time since the quakes. It also marks the completion of stablisation phase of the project. Our reporter Adam Burns went along.

Images, Canterbury Museum

One landscape colour digital photograph taken on 25 February 2011 showing earthquake damage on western side of Oxford Street, Lyttelton Taken from the footpath looking downhill from Lyttelton Main School. The buildings visible (from the foreground) are: London Street Restaurant; Bells Pharmacy; Maritime House (McKay - ISS Limited, Shipping Ag...

Images, Canterbury Museum

One landscape colour digital photograph taken on 25 February 2011 showing earthquake damage on eastern side of Oxford Street, Lyttelton Taken from the footpath looking downhill from opposite Lyttelton Main School. The Buildings visible are the premises of Moda Fotografica (former Library and Council Chambers), a private residence (former Libra...

Images, eqnz.chch.2010

A magnitude 7.1 earthquake occurred at 4:35 am on September 4, 2010 here in Christchurch. There was damage and destruction to buildings but no loss of life. Five months later (22nd Feb, 2011) the city was struck by another quake. This time we weren't so lucky. 185 people lost their lives. Many people lost homes and businesses. The central b...

Images, eqnz.chch.2010

On a walk around the neighbourhood, December 3, 2013, Christchurch New Zealand. www.stuff.co.nz/the-press/christchurch-life/avenues/featu...

Images, eqnz.chch.2010

Knox Church earthquake repair/rebuild on a walk around Christchurch December 11, 2013 New Zealand. www.stuff.co.nz/the-press/news/christchurch-earthquake-20... All about our ear...

Research papers, University of Canterbury Library

The recent Canterbury earthquake sequence in 2010-2011 highlighted a uniquely severe level of structural damage to modern buildings, while confirming the high vulnerability and life threatening of unreinforced masonry and inadequately detailed reinforced concrete buildings. Although the level of damage of most buildings met the expected life-safety and collapse prevention criteria, the structural damage to those building was beyond economic repair. The difficulty in the post-event assessment of a concrete or steel structure and the uneconomical repairing costs are the big drivers of the adoption of low damage design. Among several low-damage technologies, post-tensioned rocking systems were developed in the 1990s with applications to precast concrete members and later extended to structural steel members. More recently the technology was extended to timber buildings (Pres-Lam system). This doctoral dissertation focuses on the experimental investigation and analytical and numerical prediction of the lateral load response of dissipative post-tensioned rocking timber wall systems. The first experimental stages of this research consisted of component testing on both external replaceable devices and internal bars. The component testing was aimed to further investigate the response of these devices and to provide significant design parameters. Post-tensioned wall subassembly testing was then carried out. Firstly, quasi-static cyclic testing of two-thirds scale post-tensioned single wall specimens with several reinforcement layouts was carried out. Then, an alternative wall configuration to limit displacement incompatibilities in the diaphragm was developed and tested. The system consisted of a Column-Wall-Column configuration, where the boundary columns can provide the support to the diaphragm with minimal uplifting and also provide dissipation through the coupling to the post-tensioned wall panel with dissipation devices. Both single wall and column-wall-column specimens were subjected to drifts up to 2% showing excellent performance, limiting the damage to the dissipating devices. One of the objectives of the experimental program was to assess the influence of construction detailing, and the dissipater connection in particular proved to have a significant influence on the wall’s response. The experimental programs on dissipaters and wall subassemblies provided exhaustive data for the validation and refinement of current analytical and numerical models. The current moment-rotation iterative procedure was refined accounting for detailed response parameters identified in the initial experimental stage. The refined analytical model proved capable of fitting the experimental result with good accuracy. A further stage in this research was the validation and refinement of numerical modelling approaches, which consisted in rotational spring and multi-spring models. Both the modelling approaches were calibrated versus the experimental results on post-tensioned walls subassemblies. In particular, the multi-spring model was further refined and implemented in OpenSEES to account for the full range of behavioural aspects of the systems. The multi-spring model was used in the final part of the dissertation to validate and refine current lateral force design procedures. Firstly, seismic performance factors in accordance to a Force-Based Design procedure were developed in accordance to the FEMA P-695 procedure through extensive numerical analyses. This procedure aims to determine the seismic reduction factor and over-strength factor accounting for the collapse probability of the building. The outcomes of this numerical analysis were also extended to other significant design codes. Alternatively, Displacement-Based Design can be used for the determination of the lateral load demand on a post-tensioned multi-storey timber building. The current DBD procedure was used for the development of a further numerical analysis which aimed to validate the procedure and identify the necessary refinements. It was concluded that the analytical and numerical models developed throughout this dissertation provided comprehensive and accurate tools for the determination of the lateral load response of post-tensioned wall systems, also allowing the provision of design parameters in accordance to the current standards and lateral force design procedures.

Images, UC QuakeStudies

Damage to Lyttelton following the 22 February 2011 earthquake. Forbes' Store on Norwich Quay with a broken awning and damage visible on the brick walls. Scaffolding placed around the building since the 4 September 2010 earthquake has tumbled during the 22 February 2011 earthquake.