Search

found 1335 results

Images, UC QuakeStudies

A photograph of a model city at the Rebuild Central office on Lichfield Street. The model was created by members of the public as part of the Christchurch City Council's Transitional City consultation project.

Images, UC QuakeStudies

A photograph of an information sheet used by the Civil Defence during the Christchurch Earthquake Response. The information sheet consists of a map of the original cordon set up in central Christchurch after the 22 February 2011 earthquake and a map of the cordon on Sunday 27 March 2011.

Images, UC QuakeStudies

A photograph of a flight of concrete stairs salvaged from a building and placed in a car park in the Christchurch central city. Steel reinforcement can be seen sticking out of the concrete.

Images, UC QuakeStudies

A photograph submitted by Philip Broderick Willis to the QuakeStories website. The description reads, "Christchurch National Memorial Service – watching videos of the Central City, which most of us had not seen anything of in months.".

Images, UC QuakeStudies

Damage to Christchurch city following the 22 February earthquake 2011. A collapsed building on the corner of Ferry Road and Lancaster Street. The brick walls of the building have crumbled, bringing the roof down with them. The wall of the building opposite has been exposed, and there is now a doorway to nowhere.