Search

found 1271 results

Audio, Radio New Zealand

A new exhibition is simply called " 37". The show is by the photographer Doc Ross, features 37 Christchurch people captured on film using a 37 second exposure. The aim: to reflect the length of time their city shook during February 2011's devastating earthquake. Katy Gosset hears some of the stories behind the exhibition and hits the streets to record her own take on the 37 second concept.

Audio, Radio New Zealand

Exactly 75 years ago today, Superman made his debut in "Action Comics" No. 1. Campaigners for the restoration of the Christchurch Cathedral are "thrilled" that rebuilding the earthquake-damaged church remains on the table. The Press reports Christchurch's hotel shortage is so critical that at times visitor centre staff have had to put tourists up in their own homes.

Audio, Radio New Zealand

For six weeks after the February 2011 Christchurch earthquake millions of litres of raw sewage - along with lots of liquefaction - poured into the Avon and Heathcote Rivers. A team of biologists quickly got to work to measure the impact of this catastrophe on life in the Heathcote River and as they tell Alison Ballance, they were surprised by what they recorded over the next few months.

Images, UC QuakeStudies

A bunch of flowers laid beside the Avon River during the River of Flowers event held in Riccarton Bush, commemorating the second anniversary of the 22 February earthquake. The photographer comments, "The organisers told me these were brought by an elderly South African woman. She had a disability so couldn't make it down to the riverbank herself, so she asked the organisers to throw them in on her behalf".

Videos, UC QuakeStudies

A video of the reopening ceremony for the Heritage Hotel in Cathedral Square, which has been closed since the 22 February 2011 earthquake. The video shows Governor General Sir Jerry Mateparae opening the building while a string trio plays. It also includes footage of a speech by the Governor General, and a tour of the hotel.

Videos, UC QuakeStudies

A video of an interview with Sonya Smith about the lack of access to her store on New Regent Street. Smith has not been able to access her store since the 22 February 2011 earthquake, and still has about $60,000 worth of personal possessions inside the store. In contrast, many of the other stores on the street have been restored and reopened.

Research papers, University of Canterbury Library

The collapse of Redcliffs’ cliff in the 22 February 2011 and 13 June 2011 earthquakes were the first times ever a major failure incident occurred at Redcliffs in approximately 6000 years. This master’s thesis is a multidisciplinary engineering geological investigation sought to study these particular failure incidents, focusing on collecting the data necessary to explain the cause and effect of the cliff collapsing in the event of two major earthquakes. This study provides quantitative and qualitative data about the geotechnical attributes and engineering geological nature of the sea-cut cliff located at Redcliffs. Results from surveying the geology of Redcliffs show that the exposed lithology of the cliff face is a variably jointed rock body of welded and (relatively intact) unwelded ignimbrite, a predominantly massive unit of brecciated tuff, and a covering of wind-blown loess and soil deposit (commonly found throughout Canterbury) on top of the cliff. Moreover, detailing the external component of the slope profile shows that Redcliffs’ cliff is a 40 – 80 m cliff with two intersecting (NE and SE facing) slope aspects. The (remotely) measured geometry of the cliff face comprises of multiple outstanding gradients, averaging a slope angle of ~67 degrees (post-13 June 2011), where the steepest components are ~80 degrees, whereas the gentle sloping sections are ~44 degrees. The physical structure of Redcliffs’ cliff drastically changed after each collapse, whereby seismically induced alterations to the slope geometry resulted in material deposited on the talus at the base of the cliff. Prior to the first collapse, the variance of the gradient down the slope was minimal, with the SE Face being the most variable with up to three major gradients on one cross section. However, after each major collapse, the variability increased with more parts of the cliff face having more than one major gradient that is steeper or gentler than the remainder of the slope. The estimated volume of material lost as a result of the gradient changes was 28,267 m³ in February and 11,360 m³ in June 2011. In addition, surveys of the cliff top after the failure incidents revealed the development of fissures along the cliff edge. Monitoring 10 fissures over three months indicated that fissured by the cliff edge respond to intense seismicity (generally ≥ Mw 4) by widening. Redcliffs’ cliff collapsed on two separate occasions as a result of an accumulated amount of damage of the rock masses in the cliff (caused by weathering and erosion over time), and two Mw 6.2 trigger earthquakes which shook the Redcliffs and the surrounding area at a Peak Ground Acceleration (PGA) estimated to be around 2 g. The results of the theoretical study suggests that PGA levels felt on-site during both instances of failure are the result of three major factors: source of the quake and the site affected; topographic amplification of the ground movement; the short distance between the source and the cliff for both fault ruptures; the focus of seismic energy in the direction of thrust faulting along a path that intercepts Redcliffs (and the Port Hills). Ultimately, failure on the NE and SE Faces of Redcliffs’ cliff was concluded to be global as every part of the exposed cliff face deposited a significant volume of material on the talus at the base of the cliff, with the exception of one section on the NE Face. The cliff collapses was a concurrent process that is a single (non-monotonic) event that operated as a complex series of (primarily) toppling rock falls, some sliding of blocks, and slumping of the soil mantle on top of the cliff. The first collapse had a mixture of equivalent continua slope movement of the heavily weathered / damaged surface of the cliff face, and discontinuous slope movement of the jointed inner slope (behind the heavily weathered surface); whereas the second collapse resulted in only discontinuous slope movement on account of the freshly exposed cliff face that had damage to the rock masses, in the form of old and (relatively) new discontinuous fractures, induced by earthquakes and aftershocks leading up to the point of failure.

Images, UC QuakeStudies

A photograph of Donna Allfrey's house at 406 Oxford Terrace. Allfrey has placed a sign in the garden which reads, "It's been a lot of fun - yeah right!". The photographer comments, "'It's been a lot of fun' is a quote from John Key about the Canterbury earthquakes and the 'yeah right' is a play on the Tui Beer advertisements".

Images, UC QuakeStudies

A photograph of a sign in the garden of Donna Allfrey's house at 406 Oxford Terrace. The sign reads, "It's been a lot of fun - yeah right!". The photographer comments, "'It's been a lot of fun' is a quote from John Key about the Canterbury earthquakes and the 'yeah right' is a play on the Tui Beer advertisements".

Research papers, University of Canterbury Library

This paper presents insights from recent advanced laboratory testing of undisturbed and reconstituted specimens of Christchurch silty-sands. The purpose of the testing was to establish the cyclic strength of silty-sands from sites in the Central Business District (CBD), where liquefaction was observed in 4 September 2010, 22 February 2011, and 13 June 2011. Similar overall strengths were obtained from undisturbed and reconstituted tests prepared at similar densities, albeit with higher variability for the reconstituted specimens. Reconstituted specimens exhibited distinctly different response in terms of lower compressibility during initial loading cycles, and exhibited a more brittle response when large strains were mobilised, particularly for samples with high fines content. Given the lower variability in natural sample response and the possibility of age-related strength to be significant for sites not subjected to earthquakes, high quality undisturbed samples are recommended over the use of reconstituted specimens to establish the cyclic strength of natural sands.

Research papers, University of Canterbury Library

The Canterbury earthquakes have generated economic demand and supply volatility, highlighting geographical and structural interdependencies. Post-earthquake reconstruction and new developments have seen skills training, relocation, recruitment and importation of skills becoming crucial for construction companies to meet demand and compete effectively. This report presents 15 case studies from a range of organisations involved in the Canterbury rebuild, exploring the business dynamics and outcomes of their resourcing initiatives. A key finding of this research is that, for many construction organisations, resourcing initiatives have become part of their organisational longer-term development strategies, rather than simply a response to ‘supply and demand’ pressures. Organisations are not relying on any single resourcing solution to drive their growth but use a combination of initiatives to create lasting business benefits, such as cost savings, improved brand and reputation, a stable and productive workforce, enhanced efficiency and staff morale, as well as improved skill levels.

Research papers, University of Canterbury Library

This thesis describes research into developing a client/server ar- chitecture for a mobile Augmented Reality (AR) application. Following the earthquakes that have rocked Christchurch the city is now changed forever. CityViewAR is an existing mobile AR application designed to show how the city used to look before the earthquakes. In CityViewAR 3D virtual building models are overlaid onto video captured by a smartphone camera. However the current version of CityViewAR only allows users to browse information stored on the mobile device. In this research the author extends the CityViewAR application to a client-server model so that anyone can upload models and annotations to a server and have this information viewable on any smartphone running the application. In this thesis we describe related work on AR browser architectures, the system we developed, a user evaluation of the prototype system and directions for future work.

Images, eqnz.chch.2010

20130817_2457_1D3-400 The story of Christchurch (Day 229/365) Many roads are closed all over eastern Christchurch as infra-structure repairs are carried out, whether it be water supplies, sewer repairs (as is the case here) or general road repairs, In just over two weeks it will be three years since the first earthquake happened (4th September...

Images, eqnz.chch.2010

The old (or is that the new) Inland Revenue Department (IRD) building on the corner of Madras and Cashel Streets in central Christchurch. Built in 2006/07 on the site of the former Farmers department store (itself badly damaged by fire), it was just a few years old when the earthquake of February 2011 struck, and subsequent quakes (all through 2...

Research papers, Victoria University of Wellington

In 2010 Neil Challenger, Head of the School of Landscape Architecture at Lincoln University, stated that the malls surrounding Christchurch drove the life out of the inner city of Christchurch. His economic and sociological concerns were expressed even before the earthquake occurred, and this forms the current hesitation on the rebuilding of Christchurch’s inner city.  The position of this research proposal is to establish whether an urban architectural intervention can address these economic and sociological concerns and the potentially devastating effects the suburban mall has had on urban life within Christchurch.  The thesis specifically asks whether establishing a mall typology as a landmark building within the inner city can strategically engage the damaged historic buildings of post-earthquake Christchurch in ways that actively preserve these historic remnants.  The main intention of this research is to engage the damaged historic buildings of post-earthquake Christchurch in ways that actively preserve these remnants and are also economically viable. By preserving the remnants as active, working elements of the urban fabric, they act as historic reminders or memorials of the event and associated loss, while also actively participating in the regrowth of the city. The thesis argues that contemporary architecture can play a strategic role in these imperatives.  Overall this research argues that there exists a distinct requirement for large-scale retail in the inner city urban environment that recognises and responds to the damaged cultural and historic architecture of inner city Christchurch. The objective of the thesis is to propose means to rejuvenate not only the economic vitality of central Christchurch,but also its historic character.

Research papers, University of Canterbury Library

This thesis set out to explore the experiences of clients and counsellors in immediate crisis intervention shortly after a major earthquake. It explored the experiences and perceptions of change during counselling for both clients and counsellor, all of which were exposed to the disaster. This study supported the idea of counsellors needing to adapt to the context of post-disaster counselling and addressing client’s immediate needs. Having both been through the same disaster meant counsellors were often going through similar experiences and emotions as their clients during this time. This led counsellors to develop a greater sense of connection and understanding of their client, as well as showing more emotional responsivity and self-disclosure. This was experienced as different to their normal therapy engagement. The implications of these counsellor responses were seen to be helpful, but at times had the potential to be hindering for counselling. Clients valued their counsellor’s techniques and personal qualities but often failed to identify what contribution they, themselves, made to change processes. The differing nature of counselling in post-disaster areas, as gauged by this study may help inform expectations and experiences regarding provision of post-disaster acute interventions.

Audio, Radio New Zealand

Topics - Hundreds of people have lost their lives in Egypt overnight, and it's expected the death toll will continue to rise. This comes after the military over threw the democratically elected leader last month, and has now forcibly closed down protester camps. Power company Orion - owned by Christchurch City Council and Selwyn District Council - is looking to hike its prices until 2019, to help recover revenue lost because of the Canterbury earthquakes.

Audio, Radio New Zealand

Topics - appalling stories of Christchurch families living in garages and tents - even a couple renting a wash-house - are continuing to surface almost two years on from the February 2011 earthquake. Youth crime is described as "steadily falling" in New Zealand, with rates of police apprehensions and prosecutions of young people at record lows. Auckland Grammar has employed the services of a private investigator to check on parents trying to cheat on school zone boundaries.

Videos, UC QuakeStudies

A video of an interview with Tracey McKeefrey about her leaky house. McKeefrey and her family have been living in the house since the 22 February 2011 earthquake, despite the fact that over 300 litres of water comes through the house every wet day. The property has been classified as TC3 but the family still does not know if it will be repaired or rebuilt.

Videos, UC QuakeStudies

A video of Principal Toni Simpson telling the students and teachers of Phillipstown School about the plan to merge their school with Woolston School. Phillipstown is one of twelve schools which is set to merge in the Education Renewal Recovery Programme. The programme was created by the Minister of Education in the wake of the 2010 and 2011 Canterbury earthquakes.

Videos, UC QuakeStudies

A video about the earthquake damage to the Christchurch Town Hall. The video shows footage of a tour through the inside of the Town Hall, recorded on a GoPro camera. It also includes interviews with Councillor Glenn Livingstone and Councillor Tim Carter about their impressions of the damage and the work that will be needed to fix the building.

Audio, Radio New Zealand

Police prosecutor jailed for dealing drugs;Sharebrokers getting late rush of MRP investors;Pressure mounts on MP Aaron Gilmore;Police rule out anyone else being at risk;Mother of electrocuted son is pleased that electricians been named and shamed;NZ Post signals to Government it will need to invest in KiwiBank in two years;Judge says young killer could have made something of himself;Elderly in Christchurch say they are low on priority list for earthquake repairs and payouts.

Audio, Radio New Zealand

The Temple for Christchurch is an enormous work, representing the seismic wave of the February 22 earthquake. Made mostly from salvaged wood it's taken a team of volunteers two years to build. But it will meet a fiery end on Saturday night when it is deliberately set alight. Justin Gregory meets the designer and his volunteers with two weeks left until burn day. But when he gets there, none are to be found.

Images, eqnz.chch.2010

Corner of Cashel and Madras streets, with the relatively new (built 2007) Inland Revenue Building and the white chair memorial to the 185 lives lost as a result of the 22/02/11 earthquake. The chairs sit on the site of the now demolished St Pauls Pacific Chuch and is diagonally across the intersection from the CTV (Canterbury TV) building where ...

Research papers, University of Canterbury Library

Fine grained sediment deposition in urban environments during natural hazard events can impact critical infrastructure and properties (urban terrain) leading to reduced social and economic function and potentially adverse public health effects. Therefore, clean-up of the sediments is required to minimise impacts and restore social and economic functionality as soon as possible. The strategies employed to manage and coordinate the clean-up significantly influence the speed, cost and quality of the clean-up operation. Additionally, the physical properties of the fine grained sediment affects the clean-up, transport, storage and future usage of the sediment. The goals of the research are to assess the resources, time and cost required for fine grained sediment clean-up in an urban environment following a disaster and to determine how the geotechnical properties of sediment will affect urban clean-up strategies. The thesis focuses on the impact of fine grained sediment (<1 mm) deposition from three liquefaction events during the Canterbury earthquake sequence (2010-2011) on residential suburbs and transport networks in Christchurch. It also presents how geotechnical properties of the material may affect clean-up strategies and methods by presenting geotechnical analysis of tephra material from the North Island of New Zealand. Finally, lessons for disaster response planning and decision making for clean-up of sediment in urban environments are presented. A series of semi-structured interviews of key stakeholders supported by relevant academic literature and media reports were used to record the clean-up operation coordination and management and to make a preliminary qualification of the Christchurch liquefaction ejecta clean-up (costs breakdown, time, volume, resources, coordination, planning and priorities). Further analysis of the costs and resources involved for better accuracy was required and so the analysis of Christchurch City Council road management database (RAMM) was done. In order to make a transition from general fine sediment clean-up to specific types of fine disaster sediment clean-up, adequate information about the material properties is required as they will define how the material will be handled, transported and stored. Laboratory analysis of young volcanic tephra from the New Zealand’s North Island was performed to identify their geotechnical properties (density, granulometry, plasticity, composition and angle of repose). The major findings of this research were that emergency planning and the use of the coordinated incident management system (CIMS) system during the emergency were important to facilitate rapid clean-up tasking, management of resources and ultimately recovery from widespread and voluminous liquefaction ejecta deposition in eastern Christchurch. A total estimated cost of approximately $NZ 40 million was calculated for the Christchurch City clean-up following the 2010-2011 Canterbury earthquake sequence with a partial cost of $NZ 12 million for the Southern part of the city, where up to 33% (418 km) of the road network was impacted by liquefaction ejecta and required clearing of the material following the 22 February 2011 earthquake. Over 500,000 tonnes of ejecta has been stockpiled at Burwood landfill for all three liquefaction inducing earthquake events. The average cost per kilometre for the event clean-up was $NZ 5,500/km (4 September 2010), $NZ 11,650/km (22 February 2011) and $NZ 11,185/km (13 June 2011). The duration of clean-up time of residential properties and the road network was approximately two to three months for each of the three liquefaction ejecta events; despite events volumes and spatial distribution of ejecta. Interviews and quantitative analysis of RAMM data revealed that the experience and knowledge gained from the Darfield earthquake (4 September 2010) clean-up increased the efficiency of the following Christchurch earthquake induced liquefaction ejecta clean-up events. Density, particle size, particle shape, clay content and moisture content, are the important geotechnical properties that need to be considered when planning for a clean-up method that incorporates collection, transport and disposal or storage. The geotechnical properties for the tephra samples were analysed to increase preparedness and reaction response of potentially affected North Island cities from possible product from the active volcanoes in their region. The geotechnical results from this study show that volcanic tephra could be used in road or construction material but the properties would have to be further investigated for a New Zealand context. Using fresh volcanic material in road, building or flood control construction requires good understanding of the material properties and precaution during design and construction to extra care, but if well planned, it can be economically beneficial.