Search

found 1226 results

Images, UC QuakeStudies

Looking across an empty site on the corner of Colombo and Hereford Streets where several buildings have been demolished, the Ibis Hotel and ANZ building are visible in the background. Taken on a day when a walkway was opened up between Re:Start Mall and Cathedral Square to allow temporary public access.

Images, eqnz.chch.2010

A bit of the now demolished QEII (Queen Elizabeth II) Park running track in the "Gap Filler" on the old Deka site in New Brighton (last occupied by a charity barn before a major fire and subsequent demolition).

Research papers, University of Canterbury Library

Over 900 buildings in the Christchurch central business district and 10,000 residential homes were demolished following the 22nd of February 2011 Canterbury earthquake, significantly disrupting the rebuild progress. This study looks to quantify the time required for demolitions during this event which will be useful for future earthquake recovery planning. This was done using the Canterbury Earthquake Recovery Authority (CERA) demolition database, which allowed an in-depth look into the duration of each phase of the demolition process. The effect of building location, building height, and the stakeholder which initiated the demolition process (i.e. building owner or CERA) was investigated. The demolition process comprises of five phases; (i) decision making, (ii) procurement and planning, (iii) demolition, (iv) site clean-up, and (v) completion certification. It was found that the time required to decide to demolish the building made up majority of the total demolition duration. Demolition projects initiated by CERA had longer procurement and planning durations, but was quicker in other phases. Demolished buildings in the suburbs had a longer decision making duration, but had little effect on other phases of the demolition process. The decision making and procurement and planning phases of the demolition process were shorter for taller buildings, though the other phases took longer. Fragility functions for the duration of each phase in the demolition process are provided for the various categories of buildings for use in future studies.

Audio, Radio New Zealand

Te Pae, Christchurch's near $450 million convention centre, has been officially opened this afternoon with a pōwhiri and unveiling by Mayor Lianne Dalziel and Minister Megan Woods. Billed as a legacy for the city, it replaces the old centre which was demolished following the Canterbury earthquakes. Niva Chittock is at the ceremony and joins Lisa with the details.

Images, UC QuakeStudies

A photograph of the site of a demolished building on the corner of Bealey Avenue and Victoria Street. Wire fencing has been placed around the site as a cordon. Signs on the fence indicate that many of the businesses which were in the area have moved and are still open.

Videos, UC QuakeStudies

A video of an interview with Zac Cassels, the co-owner of the Cassels & Sons Brewery bar, about the preparations for the bar's opening. The bar is to open in a historic building on Madras Street, despite CERA's plans to demolish the building and build a stadium.

Images, UC QuakeStudies

A digitally manipulated photograph of the sign for the Boulevarde restaurant. The photographer comments, "The title is very appropriate as this restaurant was closed after the February Christchurch earthquake. The area has been cordoned off for ages now and everything will probably be demolished.

Images, UC QuakeStudies

A digitally manipulated image of a broken window on Spicer House. The photographer comments, "One of the office blocks in Christchurch City, New Zealand. As the window has not been fixed I am presuming that this building will be slowly demolished at a later date".

Videos, UC QuakeStudies

A time-lapse video of New Regent Street, taken from The Press building, which accidentally captured the collapse of the Copthorne Hotel. A cloud of dust from the collapsing building can be seen in the top of the video. The hotel collapsed while it was being demolished.

Audio, Radio New Zealand

It's seven years today since Christchurch was rocked by the magnitude 6.3 earthquake. It killed 185 people, injured thousands more and led to whole suburbs and most of the central city being demolished. Seven years on, the rebuild is still underway and some residents are still struggling to get the repairs they want.

Images, eqnz.chch.2010

One of the most beautiful pieces of wall art (added to the blank walls after buildings were demolished following the earthquakes) in Christchurch, is now being hidden by a new building in front of it. www.flickr.com/photos/johnstewartnz/15499321681/in/...

Images, UC QuakeStudies

A photograph of the site of a demolished building on Tuam Street which is being used as a car park. The photograph was taken during the Residential Access Project which gave residents temporary access within the red-zone cordon in order to retrieve items from their homes after the 22 February 2011 earthquake.