Search

found 1113 results

Images, Alexander Turnbull Library

A man has climbed an active volcano and pitched a tent in order to get away from the Canterbury earthquake and the flooding in the lower North Island. Refers to the Christchurch earthquake of 4th September 2010 as well as the heavy rain, slips, and flooding from Whanganui in the centre of the North Island down to the Rimutaka Hill Road, North of Wellington. Quantity: 1 digital cartoon(s).

Audio, Radio New Zealand

TVs, shopping trolleys, beds, mattresses, even a gun. That is just some of the rubbish found by residents surrounding Christchurch's residential red zone. The area used to be filled with houses, but damage after the Canterbury earthquakes forced thousands of homes to be demolished. While many of the old suburban roads remain, the area now resembles a park. But it is now attracting those wanting to dump their rubbish for free - and Land Information NZ, which controls the land, has removed 25 tonnes of trash since January. Residents have had enough as well - with some taking matters into their own hands. Checkpoint reporter Logan Church has the story.

Images, UC QuakeStudies

Graffiti on a wooden wall depicts a child pointing at a site across the street and reads "I remember when the Kazbah was over there." The photographer comments, "A local street artist has commemorated Christchurch's deadliest earthquake. The anniversary is tomorrow. Where the photograph was taken was the site of the Ozone Hotel, which has now gone as well. For some of us who live and work in the East of Christchurch the earthquake was not what happened in the City as we were almost unaware of it. We had no water, toilets and most of all no electricity for weeks. For myself petrol was low and with tales of all the petrol stations on our side of town being damaged we could not take the chance of venturing out on severely damaged roads to find no petrol and the possibility of not getting home. We walked around and saw the damage that was local to us. TJ's Kazbah was one that stood out. A building that had a beauty with its round tower standing proud and always looked well kept - it was now collapsed. Its tower, which was once pointing towards the sky was laying on its side. It had kept its shape, but had a lightning shaped crack through it. The one thing that kept us feeling almost normal through the coming weeks was The Press our daily paper still being delivered even though the Press building and staff had suffered so badly themselves.

Research papers, University of Canterbury Library

At 00:02 on 14th November 2016, a Mw 7.8 earthquake occurred in and offshore of the northeast of the South Island of New Zealand. Fault rupture, ground shaking, liquefaction, and co-seismic landslides caused severe damage to distributed infrastructure, and particularly transportation networks; large segments of the country’s main highway, State Highway 1 (SH1), and the Main North Line (MNL) railway line, were damaged between Picton and Christchurch. The damage caused direct local impacts, including isolation of communities, and wider regional impacts, including disruption of supply chains. Adaptive measures have ensured immediate continued regional transport of goods and people. Air and sea transport increased quickly, both for emergency response and to ensure routine transport of goods. Road diversions have also allowed critical connections to remain operable. This effective response to regional transport challenges allowed Civil Defence Emergency Management to quickly prioritise access to isolated settlements, all of which had road access 23 days after the earthquake. However, 100 days after the earthquake, critical segments of SH1 and the MNL remain closed and their ongoing repairs are a serious national strategic, as well as local, concern. This paper presents the impacts on South Island transport infrastructure, and subsequent management through the emergency response and early recovery phases, during the first 100 days following the initial earthquake, and highlights lessons for transportation system resilience.

Research papers, University of Canterbury Library

At 00:02 on 14th November 2016, a Mw 7.8 earthquake occurred in and offshore of the northeast of the South Island of New Zealand. Fault rupture, ground shaking, liquefaction, and co-seismic landslides caused severe damage to distributed infrastructure, and particularly transportation networks; large segments of the country’s main highway, State Highway 1 (SH1), and the Main North Line (MNL) railway line, were damaged between Picton and Christchurch. The damage caused direct local impacts, including isolation of communities, and wider regional impacts, including disruption of supply chains. Adaptive measures have ensured immediate continued regional transport of goods and people. Air and sea transport increased quickly, both for emergency response and to ensure routine transport of goods. Road diversions have also allowed critical connections to remain operable. This effective response to regional transport challenges allowed Civil Defence Emergency Management to quickly prioritise access to isolated settlements, all of which had road access 23 days after the earthquake. However, 100 days after the earthquake, critical segments of SH1 and the MNL remain closed and their ongoing repairs are a serious national strategic, as well as local, concern. This paper presents the impacts on South Island transport infrastructure, and subsequent management through the emergency response and early recovery phases, during the first 100 days following the initial earthquake, and highlights lessons for transportation system resilience.

Images, Alexander Turnbull Library

The cartoon shows a house for sale in Christchurch after the earthquakes; there is a jagged rip through the house and the road outside that looks like a seismic graph after a lot of activity. The 'For Sale' sign says 'Open Plan living, open home, Seismologist's dream!'. Context - A house wrecked by the Christchurch earthquakes of September 4th 2010, February 22 2011 and June 13 2011. Quantity: 1 digital cartoon(s).

Research papers, University of Canterbury Library

Fine grained sediment deposition in urban environments during natural hazard events can impact critical infrastructure and properties (urban terrain) leading to reduced social and economic function and potentially adverse public health effects. Therefore, clean-up of the sediments is required to minimise impacts and restore social and economic functionality as soon as possible. The strategies employed to manage and coordinate the clean-up significantly influence the speed, cost and quality of the clean-up operation. Additionally, the physical properties of the fine grained sediment affects the clean-up, transport, storage and future usage of the sediment. The goals of the research are to assess the resources, time and cost required for fine grained sediment clean-up in an urban environment following a disaster and to determine how the geotechnical properties of sediment will affect urban clean-up strategies. The thesis focuses on the impact of fine grained sediment (<1 mm) deposition from three liquefaction events during the Canterbury earthquake sequence (2010-2011) on residential suburbs and transport networks in Christchurch. It also presents how geotechnical properties of the material may affect clean-up strategies and methods by presenting geotechnical analysis of tephra material from the North Island of New Zealand. Finally, lessons for disaster response planning and decision making for clean-up of sediment in urban environments are presented. A series of semi-structured interviews of key stakeholders supported by relevant academic literature and media reports were used to record the clean-up operation coordination and management and to make a preliminary qualification of the Christchurch liquefaction ejecta clean-up (costs breakdown, time, volume, resources, coordination, planning and priorities). Further analysis of the costs and resources involved for better accuracy was required and so the analysis of Christchurch City Council road management database (RAMM) was done. In order to make a transition from general fine sediment clean-up to specific types of fine disaster sediment clean-up, adequate information about the material properties is required as they will define how the material will be handled, transported and stored. Laboratory analysis of young volcanic tephra from the New Zealand’s North Island was performed to identify their geotechnical properties (density, granulometry, plasticity, composition and angle of repose). The major findings of this research were that emergency planning and the use of the coordinated incident management system (CIMS) system during the emergency were important to facilitate rapid clean-up tasking, management of resources and ultimately recovery from widespread and voluminous liquefaction ejecta deposition in eastern Christchurch. A total estimated cost of approximately $NZ 40 million was calculated for the Christchurch City clean-up following the 2010-2011 Canterbury earthquake sequence with a partial cost of $NZ 12 million for the Southern part of the city, where up to 33% (418 km) of the road network was impacted by liquefaction ejecta and required clearing of the material following the 22 February 2011 earthquake. Over 500,000 tonnes of ejecta has been stockpiled at Burwood landfill for all three liquefaction inducing earthquake events. The average cost per kilometre for the event clean-up was $NZ 5,500/km (4 September 2010), $NZ 11,650/km (22 February 2011) and $NZ 11,185/km (13 June 2011). The duration of clean-up time of residential properties and the road network was approximately two to three months for each of the three liquefaction ejecta events; despite events volumes and spatial distribution of ejecta. Interviews and quantitative analysis of RAMM data revealed that the experience and knowledge gained from the Darfield earthquake (4 September 2010) clean-up increased the efficiency of the following Christchurch earthquake induced liquefaction ejecta clean-up events. Density, particle size, particle shape, clay content and moisture content, are the important geotechnical properties that need to be considered when planning for a clean-up method that incorporates collection, transport and disposal or storage. The geotechnical properties for the tephra samples were analysed to increase preparedness and reaction response of potentially affected North Island cities from possible product from the active volcanoes in their region. The geotechnical results from this study show that volcanic tephra could be used in road or construction material but the properties would have to be further investigated for a New Zealand context. Using fresh volcanic material in road, building or flood control construction requires good understanding of the material properties and precaution during design and construction to extra care, but if well planned, it can be economically beneficial.

Audio, Radio New Zealand

A review of the week's news including... New questions are raised by leaked video footage showing a robot and two workers inside the Pike River mine just months after the 2010 disaster, fresh happy faces in the newly announced Labour list line up, the country's two biggest media companies have been given a strong message from the regions after their proposed merger is knocked back, a full biosecurity operation launched in Kerikeri, Wellington house prices soar, a helicopter pilot describes his crash north of Wellington as 'frightening', women in the Mongrel Mob say there is now less violence towards women, a review of the Kaikoura earthquake reveals it generated a tsunami of nearly 7 metres, the most annoying driving habits on Christchurch roads and one half of a champion rowing crew is surprised by the other half's retirement announcement.

Images, Alexander Turnbull Library

MP Jim Anderton who is standing for Mayor of Christchurch in the coming local body elections (9th October) stands up to his chest in a crack in the road waving a sign that reads 'Jim Anderton for mayor' and yelling "I'm still here!' Refers to the very high profile that his rival the standing mayor Bob Parker has enjoyed in the aftermath of the Christchurch earthquake of 4th September 2010. Jim Anderton has rather faded out of the limelight by comparison. Quantity: 1 digital cartoon(s).

Research papers, University of Canterbury Library

We present preliminary observations on three waters impacts from the Mw7.8 14th November 2016 Kaikōura Earthquake on wider metropolitan Wellington, urban and rural Marlborough, and in Kaikōura township. Three waters systems in these areas experienced widespread and significant transient ground deformation in response to seismic shaking, with localised permanent ground deformation via liquefaction and lateral spreading. In Wellington, potable water quality was impacted temporarily by increased turbidity, and significant water losses occurred due to damaged pipes at the port. The Seaview and Porirua wastewater treatment plants sustained damage to clarifier tanks from water seiching, and increased water infiltration to the wastewater system occurred. Most failure modes in urban Marlborough were similar to the 2010-2011 Canterbury Earthquake Sequence; however some rural water tanks experienced rotational and translational movements, highlighting importance of flexible pipe connections. In Kaikōura, damage to reservoirs and pipes led to loss of water supply and compromised firefighting capability. Wastewater damage led to environmental contamination, and necessitated restrictions on greywater entry into the system to minimise flows. Damage to these systems necessitated the importation of tankered and bottled water, boil water notices and chlorination of the system, and importation of portaloos and chemical toilets. Stormwater infrastructure such as road drainage channels was also damaged, which could compromise condition of underlying road materials. Good operational asset management practices (current and accurate information, renewals, appreciation of criticality, good system knowledge and practical contingency plans) helped improve system resilience, and having robust emergency management centres and accurate Geographic Information System data allowed effective response coordination. Minimal damage to the wider built environment facilitated system inspections. Note Future research will include detailed geospatial assessments of seismic demand on these systems and attendant modes of failure, levels of service restoration, and collaborative development of resilience measures.

Audio, Radio New Zealand

Topics - If you like a quiet time, head for the Spanish city of Seville. Seville's silent summer, they're calling this. They've banned outdoor noise. Seville's been noisy; flamenco singers, old men playing dominoes, bar patrons chatting. The city councillors have now banned most of this, and they seem to have support. Gerry Brownlee the Earthquake Recovery Minister will have the final say over what happens to a piece of land near Christchurch airport, on the corner of Memorial Ave and Russley Road. It's currently zoned as rural, but industrial development could be on the cards. The NYT wonders why with so much violence in movies and games, the big Comic-con pop entertainment convention in San Diego is so peaceful. John Banks snapped phone-driving, we saw at the weekend. John Banks accused of breaking the law again, this time for using a cellphone while driving.

Videos, UC QuakeStudies

A video of a presentation by Haydn Read, Programme Director of Smart City Coalition, at the 2016 Seismics in the City Conference. The presentation is titled, "Smart City/Choice City".The abstract for the presentation reads, "'We want to get to the point where people can get amazing information in real-time that helps them make choices about where to swim or what road to take' (Vicki Buck, Deputy Mayor of Christchurch). Real time information and feedback via the Internet of Things. The CCC is now part of Land Information New Zealand's (LINZ) Smart City coalition which aims to test the value of smart city concepts through a series of projects in Christchurch, Auckland, and Wellington."Note that due to technical issues, the final part of this presentation was not recorded.

Images, Alexander Turnbull Library

In a Christchurch street still covered in liquefaction man weeps over his four-wheel drive car, which has a number plate showing the word 'macho'. Two women who are working at clearing the road of silt watch and one of them observes that 'he's not handling the quake well at all... Keeps getting silt smears on the 4 x 4!' Context - The Christchurch earthquake of 22 February 2011. Liquefaction is a particular problem. There is a point being made here about the 'macho' man who sobs over his car and the two staunch women who get on with the cleaning-up effort. Quantity: 1 digital cartoon(s).

Research papers, University of Canterbury Library

This paper provides a photographic tour of the ground-surface rupture features of the Greendale Fault, formed during the 4th September 2010 Darfield Earthquake. The fault, previously unknown, produced at least 29.5 km of strike-slip surface deformation of right-lateral (dextral) sense. Deformation, spread over a zone between 30 and 300 m wide, consisted mostly of horizontal flexure with subsidiary discrete shears, the latter only prominent where overall displacement across the zone exceeded about 1.5 m. A remarkable feature of this event was its location in an intensively farmed landscape, where a multitude of straight markers, such as fences, roads and ditches, allowed precise measurements of offsets, and permitted well-defined limits to be placed on the length and widths of the surface rupture deformation.

Audio, Radio New Zealand

Questions to Ministers 1. AMY ADAMS to the Minister of Finance: How many claims does the Earthquake Commission expect to receive as a result of the earthquakes in Canterbury since 4 September 2010? 2. Hon PHIL GOFF to the Prime Minister: Does he stand by his statement that "rebuilding Christchurch is a key priority for the Government this year"; if so, what rebuilding plans are currently in place? 3. METIRIA TUREI to the Minister for Social Development and Employment: Does she stand by her statement that state support is for "people to fall back on when they really need it"? 4. Hon ANNETTE KING to the Prime Minister: Does he stand by his statement that New Zealanders were "more than compensated" for last year's increase in GST? 5. NICKY WAGNER to the Minister for Social Development and Employment: How is her Ministry responding to support the Christchurch recovery following last month's earthquake? 6. JACINDA ARDERN to the Prime Minister: Does he stand by his answers to Oral Question number one on 8 March 2011; if not, why not? 7. AARON GILMORE to the Minister of Corrections: What support has the Department of Corrections provided to the people of Christchurch following last month's earthquake? 8. Dr KENNEDY GRAHAM to the Minister of Finance: How much has he budgeted to raise from the Christchurch Earthquake Appeal and has this figure been revised in light of the Japanese earthquake? 9. JO GOODHEW to the Minister of Internal Affairs: What work will the New Zealand Urban Search and Rescue team be carrying out in Japan? 10. Hon SHANE JONES to the Minister of Transport: Does he stand by his statement that the $300 million bill for restoring the Christchurch road network won't be causing any "dramatic issues" and what is his timeframe for the completion of this work? 11. COLIN KING to the Minister of Transport: What work has been done to repair and reopen Christchurch's roads and highways following the 22 February earthquake? 12. Hon STEVE CHADWICK to the Minister for Arts, Culture and Heritage: Has he had any discussions with the Minister for Canterbury Earthquake Recovery about heritage buildings or recovering cultural artefacts from buildings damaged by the earthquake on 22 February; if so, what did he say to the Minister?

Research Papers, Lincoln University

Initial recovery focus is on road access (especially the inland SH70) although attention also needs to be focussed on the timelines for reopening SH1 to the south. Information on progress and projected timelines is updated daily via NZTA (www.nzta.govt.nz/eq-travel ). Network analyses indicate potential day trip access and re-establishment of the Alpine Pacific triangle route. When verified against ‘capacity to host’ (Part 2 (15th December) there appears to potential for the reestablishment of overnight visits. Establishing secure road access is the key constraint to recovery. In terms of the economic recovery the Kaikoura District has traditionallyattracted a large number of visitors which can be grouped as: second home (and caravan) owners, domestic New Zealand and international travellers. These have been seen through a behaviour lens as “short stop”, ‘day” (where Kaikoura is the specific focal destination) and overnight visitors. At the present restricted access appears to make the latter group less amenable to visiting Kaikoura, not the least because the two large marine mammal operators have a strong focus on international visitors. For the present the domestic market provides a greater initial pathway to recovery. Our experiences in and reflections on Christchurch suggest Kaikoura will not go back to what it once was. A unique opportunity exists to reframe the Kaikoura experience around earthquake geology and its effects on human and natural elements. To capitalise on this opportunity there appears to be a need to move quickly on programming and presenting such experiences as part of a pathway to re-enabling domestic tourists while international visitor bookings and flows can be re-established. The framework developed for this study appears to be robust for rapid post disaster assessment. It needs to be regularly updated and linked with emerging governance and recovery processes.

Images, Alexander Turnbull Library

A small boy is being a real entrepreneur after the Christchurch earthquake of 22 February 2011 and has set up a road-side stall from which you can buy a bag of 'real leakyfakshun'. Behind him is a pile of liquefaction and a spade with which he can fill bags. Context - the Christchurch earthquake of 22 February has caused vastly more liquefaction than the original 4th September earthquake. The vibrations from the quake cause liquefaction which is where the soil loses strength and stiffness, and behaves more like a liquid than a solid - rather like wet sand. Colour and black and white versions available Quantity: 2 digital cartoon(s).

Research Papers, Lincoln University

The recent Christchurch earthquakes provide a unique opportunity to better understand the relationship between pre-disaster social fault-lines and post-disaster community fracture. As a resident of Christchurch, this paper presents some of my reflections on the social structures and systems, activities, attitudes and decisions that have helped different Canterbury ‘communities’ along their road to recovery, and highlights some issues that have, unfortunately, held us back. These reflections help answer the most crucial question asked of disaster scholarship: what can recovery agencies (including local authorities) do - both before and after disaster - to promote resilience and facilitate recovery. This paper – based on three different definitions of resilience - presents a thematic account of the social recovery landscape. I argue that ‘coping’ might best be associated with adaptive capacity, however ‘thriving’ or ‘bounce forward’ versions of resilience are a function of a community’s participative capacity.

Research papers, University of Canterbury Library

The devastating magnitude M6.3 earthquake, that struck the city of Christchurch at 12:51pm on Tuesday 22 February 2011, caused widespread damage to the lifeline systems. Following the event, the Natural Hazard Research Platform (NHRP) of New Zealand funded a short-term project “Recovery of Lifelines” aiming to: 1) coordinate the provision of information to meet lifeline short-term needs; and to 2) facilitate the accessibility to lifelines of best practice engineering details, along with hazards and vulnerability information already available from the local and international scientific community. This paper aims to briefly summarise the management of the recovery process for the most affected lifelines systems, including the electric system, the road, gas, and the water and wastewater networks. Further than this, the paper intends to discuss successes and issues encountered by the “Recovery of Lifelines” NHRP project in supporting lifelines utilities.

Videos, NZ On Screen

This Philip Temple-scripted episode of Our People, Our Century covers stories of New Zealanders and their turangawaewae: a piece of land they call their own. The importance of the land to farming families, and to the economy of NZ is explored through the eyes of three families. Elworthy Station in South Canterbury is being farmed by a 5th generation Elworthy. Two elderly ladies reminisce on their childhood in remote Mangapurua, near Raetihi in the central North Island. And a Māori family in Taranaki reflects on their decision to sell the family farm. 

Videos, NZ On Screen

Early Days Yet, directed by Shirley Horrocks, is a full-length documentary about New Zealand poet Allen Curnow, made in the last months of his life. The poet talks about his life and work, and visits the places of some of his most important poems. It includes interviews with other New Zealand poets about Curnow's significance as an advocate for New Zealand poetry. As Curnow famously mused in front of a moa skeleton displayed in Canterbury Museum: "Not I, some child, born in a marvellous year / Will learn the trick of standing upright here."

Images, Alexander Turnbull Library

Text across the top of the cartoon reads 'You know you live in Christchurch when...' Six cameos follow reading 'You can stir a cup of coffee without a spoon' - a cup of coffee is shaken; 'after 30 years you finally know your neighbours' - a group of people get to know one another; 'the latest fitness craze is sandba' - a couple shovel a heap of liquefaction to music from their transistor; 'everyone gets to drive a slalom' - someone weaves along a road avoiding cracks and mud in their car; 'there's a craze in "unique garden features"' - a longdrop has been dug in the garden; and lastly 'you have tea under a doorframe' - a couple eats and drinks under a doorframe for safety. Context - the Christchurch earthquake of 22 February 2011. Published in The Press Quantity: 1 digital cartoon(s).

Images, Alexander Turnbull Library

Depicts huge elderly woman with 'CERA' on her dress scolding smaller adult dressed as schoolboy near bustop with sign 'CBD red zone tours' Text reads 'And don't talk to strangers and don't cross the road and remember to eat your lunch..' Context: After the 22 Feburary 2011 earthquake in Christchurch, the central business district (CBD) was marked as a red zone. Red zone areas were deemed unsuitable for habitation due to significant damage and at high risk of further damage from low levels of earth shaking. CERA (Christchurch Earthquake Recovery Authority) ran public bus tours of the Christchurch CBD from November to December 2011. For safety reasons the public was not allowed off the buses as it was a dangerous and active demolition site. Quantity: 1 digital cartoon(s).

Research Papers, Lincoln University

High rise developments dominate skylines and are contentious in many low rise urban environments. Christchurch is no exception and its residents have historically been vocal in articulating their opinions on matters they care about, especially in regard to projects they perceive will ruin their ‘garden city’. At the turn of the millennium, developers were preparing yet another proposal which would get the tongues wagging in Christchurch with the development of the former Ferrymead Tavern site on Ferry Road. The planning process was a long and antagonistic one with many individuals viewing the built towers with a look of ‘disgust’ and discontent. In an ironic twist, the seismic activity in Christchurch over the last few years which has had major implications for a range of planning issues, incrementally led to the death of highly controversial Ferrymead ‘Water’s Edge’ Apartments.

Research papers, University of Canterbury Library

Following the 22 February 2011, MW 6.2 earthquake located on a fault beneath the Port Hills of Christchurch, fissuring of up to several hundred metres in length was observed in the loess and loess-colluvium of foot-slope positions in north-facing valleys of the Port Hills. The fissuring was observed in all major valleys, occurred at similar low altitudes, showing a contour-parallel orientation and often accompanied by both lateral compression/extension features and spring formation in the valley floor below. Fissuring locations studied in depth included Bowenvale Valley, Hillsborough Valley, Huntlywood Terrace–Lucas Lane, Bridle Path Road, and Maffeys Road–La Costa Lane. Investigations into loess soil, its properties and mannerisms, as well as international examples of its failure were undertaken, including study of the Loess Plateau of China, the Teton Dam, and palaeo-fissuring on Banks Peninsula. These investigations lead to the conclusion that loess has the propensity to fail, often due to the infiltration of water, the presence of which can lead to its instantaneous disaggregation. Literature study and laboratory analysis of Port Hills loess concluded that is has the ability to be stable in steep, sub-vertical escarpments, and often has a sub-vertically jointed internal structure and has a peak shear strength when dry. Values for cohesion, c (kPa) and the internal friction angle, ϕ (degrees) of Port Hills loess were established. The c values for the 40 Rapaki Road, 3 Glenview Terrace loess samples were 13.4 kPa and 19.7 kPa, respectively. The corresponding ϕ values were thought unusually high, at 42.0° and 43.4°.The analysed loess behaved very plastically, with little or no peak strength visible in the plots as the test went almost directly to residual strength. A geophysics resistivity survey showed an area of low resistivity which likely corresponds to a zone of saturated clayey loess/loess colluvium, indicating a high water table in the area. This is consistent with the appearances of local springs which are located towards the northern end of each distinct section of fissure trace and chemical analysis shows that they are sourced from the Port Hills volcanics. Port Hills fissuring may be sub-divided into three categories, Category A, Category B, and Category C, each characterised by distinctive features of the fissures. Category A includes fissures which display evidence of, spring formation, tunnel-gullying, and lateral spreading-like behaviour or quasi-toppling. These fissures are several metres down-slope of the loess-bedrock interface, and are in valleys containing a loess-colluvium fill. Category B fissures are in wider valleys than those in Category A, and the valleys contain estuarine silty sediments which liquefied during the earthquake. Category C fissures occurred at higher elevations than the fissures in the preceding categories, being almost coincident with bedrock outcropping. It is believed that the mechanism responsible for causing the fissuring is a complex combination of three mechanisms: the trampoline effect, bedrock fracturing, and lateral spreading. These three mechanisms can be applied in varying degrees to each of the fissuring sites in categories A, B, and C, in order to provide explanation for the observations made at each. Toppling failure can describe the soil movement as a consequence of the a three causative mechanisms, and provides insight into the movement of the loess. Intra-loess water coursing and tunnel gullying is thought to have encouraged and exacerbated the fissuring, while not being the driving force per se. Incipient landsliding is considered to be the least likely of the possible fissuring interpretations.

Images, Alexander Turnbull Library

Minister for Christchurch Recovery, Gerry Brownlee drives a huge tractor among debris that spells out 'Due Process' and says 'In order to get Christchurch back on its feet again we have to bring parliament to its knees. Context - The minister says he is happy with the speed of the work being done, as he wants tomake sure those involved in the rebuild portion of the recovery effort are well prepared. The bill establishes the Canterbury Earthquake Recovery Authority (Cera) and empowers it to lead reconstruction efforts in Christchurch. It gives Cera specific powers to get information from any source, to requisition and build on land and to carry out demolitions. It can also take over local authorities if they are not working effectively on recovery work. Quantity: 1 digital cartoon(s).

Images, Alexander Turnbull Library

Shows a couple in their car driving along a road festooned with election billboards. The man reads a billboard and comments that the mayor is promising to 'move our district forward' and his partner suggests that with all the new jobs down in Christchurch maybe he should move the district down there. Probably refers to mayoral hopefuls in Whangarei, Pamela Sue Peters or Stan Semenoff, suggesting that people should move to Christchurch for jobs which, since the 4th September 2010 earthquake, are going to be plentiful. But it seems that every mayoral candidate in the country is intent on moving his or her part of New Zealand forward if they win the October 9 local body election. Quantity: 1 digital cartoon(s).

Images, Alexander Turnbull Library

Shows a postman who has just put an 'Earthquake bill' for '$8.5 billion' into the government's letterbox. Context - The New Zealand government will spend about 8.5 billion NZ dollars (6.6 billion U.S. dollars) over the next few years rebuilding Christchurch. New Zealand Finance Minister Bill English said on Tuesday that the Treasury has estimated the direct cost of the two earthquakes is about 5.5 billion NZ dollars), which will be fully provided for in the Budget in May. He said about 3 billion NZ dollars of that relates to thegovernment's share of local government infrastructure, roads, insurance excesses on schools and housing, land remediation from the September quake, demolition, Accidents Compensation Corporation scheme and the business support package. (Xinhuanet 12 April 2011) Quantity: 1 digital cartoon(s).