Search

found 3473 results

Images, UC QuakeStudies

The north end of the bridge on Gayhurst Road. During the earthquake, the bridge was forced about 15 centimetres towards the river, the land falling away under the road. Fencing has been placed around the footpath, and the road filled and resealed so that it can still be used by traffic.

Images, UC QuakeStudies

The University of Canterbury's E-Learning team's temporary office in the James Hight building. The photographer comments, "First looks at our new temporary (maybe) office space. Our group will stay here until April or May 2011, then will move to another floor in the Central Library. Foyer lifts etc. Female toilets are off the foyer to the left. These lifts start at Level 2 of the Library, and are heavily used by students. (Once the building is repaired after the earthquake; several floors are still in a mess)".