A photograph of the earthquake damage to the Montgomery's Building on the corner of Colombo and Tuam Streets. Large sections of the façade have collapsed, exposing the inside of the building. The bricks and other rubble have mostly been cleared from the footpath and street in front. Wire fences have been placed around the building as a cordon. In the distance there is a large pile of bricks on a property where another building has collapsed.
A photograph of tents pitched at the On-Site Operations Coordination Centre (OSOCC) in Latimer Square. The OSOCC was set up by the United Nations Emergency Relief Coordinator.
A photograph of a map of Christchurch. The city has been divided into sections. Green, red, and yellow dots have been used to indicate the status of inspected buildings.
A photograph of emergency management personnel running a USAR station in Latimer Square. The station is made up of wooden struts with a tarpaulin roof and walls.
Photograph captioned by BeckerFraserPhotos, "Some CBD worker with a great sense of humour has put this together outside the Work and Income office in High Street".
A photograph of a volunteer from the Wellington Emergency Management Office ordering at a temporary café. The café was set up in a house in the Christchurch central city.
A photograph of a volunteer from the Wellington Emergency Management Office ordering at a temporary café. The café was set up in a house in the Christchurch central city.
University of Canterbury library staff in their temporary office in the NZi3 building. The photographer comments, "University of Canterbury administration all fits into one building! Library IT department staff".
Filing cabinets shaken open in the English department office after the 23 December 2011 earthquake. The filing cabinets were secured to the floor following February's earthquake, so did not tip over.
Photograph captioned by BeckerFraserPhotos, "C1 Coffee's office in the second floor of the Alice in Videoland Building. Milk bottle crates have been used as legs for a desk.
A photograph of a model city at the Rebuild Central office on Lichfield Street. The model was created by members of the public as part of the Christchurch City Council's Transitional City consultation project.
University of Canterbury IT staff in their temporary office in the NZi3 building. The photographer comments, "University of Canterbury administration all fits into one building! Well, sort of. IT support and phones".
A photograph of a model city at the Rebuild Central office on Lichfield Street. The model was created by members of the public as part of the Christchurch City Council's Transitional City consultation project.
A member of the University of Canterbury's E-Learning team, Jessica Hollis, in their new office in the James Hight building. The photographer comments, " Jess Hollis settles in to her new workspace".
Members of the University of Canterbury's Digital Media Group in their temporary office in KB02 in Kirkwood Village, the complex of prefabs set up after the earthquakes to provide temporary office and classroom space for the university. The photographer comments, "The e-learning group and the video conferencing team are now located in the Kirkwood Village at the University of Canterbury. It's a very impressive project, about 60 buildings arranged in various configurations with some used for teaching or computer labs, and others as staff offices. We will probably stay here for several years now. Looking across the centre desks to the advisers' area".
The entrance to KB02, the University of Canterbury's Digital Media Group temporary office in Kirkwood Village, the complex of prefabs set up after the earthquakes to provide temporary office and classroom space for the university. The photographer comments, "The e-learning group and the video conferencing team are now located in the Kirkwood Village at the University of Canterbury. It's a very impressive project, about 60 buildings arranged in various configurations with some used for teaching or computer labs, and others as staff offices. We will probably stay here for several years now. The front doors. We'll need to advertise our presence once we're settled in".
The University of Canterbury's E-Learning team's temporary office in the James Hight building. The photographer comments, "First looks at our new temporary (maybe) office space. Our group will stay here until April or May 2011, then will move to another floor in the Central Library. My desk. I hope to get blinds to cover this internal window. Later - blinds are not allowed, so I rotated the desk 180 degrees. My back is now facing the window, but I'm far enough away that people won't be able to read my screens - and I don't have to look at people looking at me".
Members of the University of Canterbury's Digital Media Group in their temporary office in KB02 in Kirkwood Village, the complex of prefabs set up after the earthquakes to provide temporary office and classroom space for the university. The photographer comments, "The e-learning group and the video conferencing team are now located in the Kirkwood Village at the University of Canterbury. It's a very impressive project, about 60 buildings arranged in various configurations with some used for teaching or computer labs, and others as staff offices. We will probably stay here for several years now. Looking along the south wall, Herbert Thomas and Susan Tull already settled in and working".
Members of the University of Canterbury's Digital Media Group in their temporary office in KB02 in Kirkwood Village, the complex of prefabs set up after the earthquakes to provide temporary office and classroom space for the university. The photographer comments, "The e-learning group and the video conferencing team are now located in the Kirkwood Village at the University of Canterbury. It's a very impressive project, about 60 buildings arranged in various configurations with some used for teaching or computer labs, and others as staff offices. We will probably stay here for several years now. Nikki Saunders, Lei Zhang (on the far wall), Nathan Gardiner and Blair - unpacking and settling in".
A report which details the findings of a performance audit carried out by the Office of the Auditor-General to assess the effectiveness and efficiency of arrangements to repair Christchurch's horizontal infrastructure.
A hording erected on an empty section where a building was demolished advertises an office development to be built there. "Modern design built to code" is one of the key features advertised.
Photograph captioned by BeckerFraserPhotos, "Demolition site of Regent Theatre, Cathedral Square with old Telecom behind".
Temporary office space set up in the NZi3 building. The photographer comments, "University of Canterbury administration all fits into one building! Well, sort of. Looking east from our bay - library and IT people".
Staff meet in temporary office space set up in the NZi3 building. The photographer comments, "University of Canterbury administration all fits into one building! Well, sort of. Two meeting spaces in the middle of the floor".
University of Canterbury IT staff in their temporary office in the NZi3 building. The photographer comments, "University of Canterbury administration all fits into one building! Well, sort of. A rather truncated IT help desk".
Members of the University of Canterbury's E-Learning team in their temporary office in the NZi3 building. The photographer comments, "E-learning group had one bay of desks to work from for 3 weeks".
Photograph captioned by BeckerFraserPhotos, "Demolition site of Regent Theatre, Cathedral Square with Clarendon Towers behind".
Members of the University of Canterbury's E-Learning team in their temporary office space in the NZi3 building. The photographer comments, "E-Learning group meeting; Jess Hollis, Antoine Monti, Susan Tull, Alan Hoskin, Herbert Thomas".
A photograph of boxes and office supplies inside the Christchurch Art Gallery on Montreal Street. The Art Gallery was used as the temporary headquarters for Civil Defence after the 22 February 2011 earthquake.
A report which details the findings of a follow-up performance audit carried out by the Office of the Auditor-General to assess the effectiveness and efficiency of arrangements to repair Christchurch's horizontal infrastructure.