A document which outlines the communication strategy behind the Lonely Cone campaign.
A tool, including an outline, resources and a survey sheet, used by SCIRT's Transport Planning Manager when delivering a series of toolboxes to SCIRT traffic staff about working around businesses.
A photograph taken in 2013, showing one of the 32 large 'Open for Business' signs placed on all of the main routes into the CBD.
A presentation prepared by one of the site engineers restoring the Memorial Arch and Bridge of Remembrance, outlining the damage to the structures, the repair designs and the construction methodologies.
A document describing the use of a remotely operated hydraulic jaw crusher to avoid the need to make confined space entries.
A presentation prepared by SCIRT's Downer Communciation Lead, providing an overview of the community engagement carried out by the Downer Team during the restoration of the Bridge and Arch.
A web story about a site visit to the Bridge and Arch by local school pupils.
A document describing the confined spaces "dummy run".
A document describing Downer's use of column seismic clamps to prevent additional damage to the Arch columns.
A document describing Downer's approach to containing bentonite when drilling micro piles for the new Arch foundations.
A web story about the model design work by Christ's College pupils.
A document which describes the process that SCIRT took to restore the Bridge of Remembrance and Memorial Arch.
A poster which was prepared to go with the award application for the Canterbury Heritage Awards 2016.
Posters which describe the earthquake damage, planned restoration methods and historic information about the Bridge of Remembrance and Memorial Arch. These posters were hung on the fencing around the Bridge and Arch to inform the public about the work taking place.
A video which describes the history of the bridge and SCIRT's repair methodology.
A document containing photographs of SCIRT's Armagh Street bridge repairs.
A photograph of the Canterbury Cultural Recovery Centre's main floor, taken in June 2014.
A photograph of the Canterbury Cultural Recovery Centre's main floor, taken in August 2013. There are St John's uniforms hanging from a clothes rack at the end of one of the stacks.
A photograph of the Canterbury Cultural Recovery Centre's main floor. A notice board displays information for Lyttelton Museum staff. There are St John's uniforms hanging from a clothes rack in the foreground.
A photograph of the Canterbury Cultural Recovery Centre's main floor. There are St John's uniforms hanging from a clothes rack at the end of one of the stacks.
A photograph of the Canterbury Cultural Recovery Centre's main floor.
The text of a Pecha Kucha talk titled, "A working week in the Recovery Centre". The talk was given by Moya Sherrif, CCCRC Intern, at the Museums Aotearoa Conference on 4 April 2014.
A photograph of a model of the ChristChurch Cathedral built from LEGO by Sam Butcher, finished in September 2011.
A photograph of a model of the ChristChurch Cathedral built from LEGO by Sam Butcher, finished in September 2011.
A photograph of a model of the ChristChurch Cathedral built from LEGO by Sam Butcher, finished in September 2011.
A photograph of a model of the ChristChurch Cathedral built from LEGO by Sam Butcher, finished in September 2011.
A photograph of a model of the ChristChurch Cathedral built from LEGO by Sam Butcher, finished in September 2011.
A photograph of a model of the ChristChurch Cathedral built from LEGO by Sam Butcher, finished in September 2011.
A photograph of a model of the ChristChurch Cathedral built from LEGO by Sam Butcher, finished in September 2011.
A photograph of a model of the ChristChurch Cathedral built from LEGO by Sam Butcher, finished in September 2011.