Search

found 1049 results

Audio, Radio New Zealand

The David and Goliath battle over a heritage building sitting in the way of a planned $473 million dollar, multi-use arena for Christchurch has ended up in court. The 25,000-seated, roofed arena is the final anchor project for the Christchurch rebuild and will be designed to host everything from All Blacks tests to big concerts. But sitting on the edge of the site, at 212 Madras Street, is the NG Building, a 115-year old warehouse that's home to a number of creative businesses. It escaped the worst of the 2011 earthquake and was strengthened by its owners: Roland Logan and Sharon Ng. They say they were told in 2013 the building could be incorporated into the arena's design, and are at loggerheads over its compulsory acquisition. Last week they were at the High Court seeking an injunction that would allow them to temporarily maintain ownership of the building, and that decision was released yesterday - and upheld. Roland joins Kathryn to discuss why they hope the building can be saved.

Images, UC QuakeStudies

An aerial photograph captioned by BeckerFraserPhotos, "Victoria Square is at the centre of this picture with its green lawns and trees. The bare patch of earth in front s the demolition sites of the Allan McLean building, the Oxford on Avon, and Plunket House. The contract to demolish the Crowne Plaza Hotel has been let, while the fate of the Town Hall is still undecided. The Convention Centre is coming down. On the very bottom, slightly to the right is the Medlab building which is also to be demolished. In the bottom left corner is the PWC building which is also to be demolished".

Videos, UC QuakeStudies

A video of a tour of the Christchurch central city Red Zone. The video includes footage of Oxford Terrace, Armagh Street, Colombo Street, Gloucester Street, Hereford Street, High Street, the Westpac Trust Building, Cashel Street, Manchester Street, Poplar Lane, the site of the demolished Convention Centre, and the Crowne Plaza Hotel.

Images, eqnz.chch.2010

A crane topples over on Victoria Street while taking glass up to some windows. No one was hurt and the glass never broke. Victoria Street was closed from 7:30am to later in the evening. This all happen on the Knox Plaza building site. Christchurch October 13, 2014 New Zealand.

Images, eqnz.chch.2010

A crane topples over on Victoria Street while taking glass up to some windows. No one was hurt and the glass never broke. Victoria Street was closed from 7:30am to later in the evening. This all happen on the Knox Plaza building site. Christchurch October 13, 2014 New Zealand.

Images, eqnz.chch.2010

A crane topples over on Victoria Street while taking glass up to some windows. No one was hurt and the glass never broke. Victoria Street was closed from 7:30am to later in the evening. This all happen on the Knox Plaza building site. Christchurch October 13, 2014 New Zealand.

Images, eqnz.chch.2010

The old (or is that the new) Inland Revenue Department (IRD) building on the corner of Madras and Cashel Streets in central Christchurch. Built in 2006/07 on the site of the former Farmers department store (itself badly damaged by fire), it was just a few years old when the earthquake of February 2011 struck, and subsequent quakes (all through 2...

Videos, UC QuakeStudies

A video of an interview with Andy Dodd, archaeologist at Underground Overground Archaeology, and Rewi Couch, representative for Te Hapu o Ngai Te Wheke, about the excavation of the site of the former Lyttelton Post Office on Norwich Quay. A Maori adze was found by the archaeologists deep beneath the concrete foundations of the building. The adze is a woodworking tool which indicates that early Maori settlers may have carved and launched waka on the site.

Images, eqnz.chch.2010

Maybe it should be titled "Pray Here"! The old church buildings next to the Christchurch Basilica (Cathedral of the Blessed Sacrament) have been demolished and replaced with ANOTHER Wilson's Car Park. Hundreds of sites in the city where buildings have been demolished after the earthquakes have been replaced in the short term by car parks!

Images, UC QuakeStudies

A view down Victoria Street from the corner of Victoria Street and Bealey Avenue. On the left is the damaged Knox Church, where the brick has crumbled but the wooden roof frame is still intact. Behind is the the BDO building and on the left is an empty demolition site.

Research papers, University of Canterbury Library

Over 900 buildings in the Christchurch central business district and 10,000 residential homes were demolished following the 22nd of February 2011 Canterbury earthquake, significantly disrupting the rebuild progress. This study looks to quantify the time required for demolitions during this event which will be useful for future earthquake recovery planning. This was done using the Canterbury Earthquake Recovery Authority (CERA) demolition database, which allowed an in-depth look into the duration of each phase of the demolition process. The effect of building location, building height, and the stakeholder which initiated the demolition process (i.e. building owner or CERA) was investigated. The demolition process comprises of five phases; (i) decision making, (ii) procurement and planning, (iii) demolition, (iv) site clean-up, and (v) completion certification. It was found that the time required to decide to demolish the building made up majority of the total demolition duration. Demolition projects initiated by CERA had longer procurement and planning durations, but was quicker in other phases. Demolished buildings in the suburbs had a longer decision making duration, but had little effect on other phases of the demolition process. The decision making and procurement and planning phases of the demolition process were shorter for taller buildings, though the other phases took longer. Fragility functions for the duration of each phase in the demolition process are provided for the various categories of buildings for use in future studies.

Images, UC QuakeStudies

A photograph submitted by Raymond Morris to the QuakeStories website. The description reads, "The Provincial Hotel, corner Barbadoes and Cashel streets is one the buildings now missing after the 2011 earthquakes, paintings of others can be found on the artist Raymond Morris’s flickr site (http://www.flickr.com/photos/rayso180/sets/72157626939956494/)".

Videos, UC QuakeStudies

Puari is a longstanding fishing area for Ngāi Tūāhuriri. It was claimed by chief Pita Te Hori for the hapū in 1868 but denied by the Crown, because the land had been allocated to settlers. This site is now owned by Ngāi Tahu and a building named after Te Hori stands here.