Underground infrastructure being repaired on Avonside Drive.
Repairs of sewerage system underway in Avonside.
An award application submitted for the IPWEA Annual Excellence Awards 2016, detailing Fulton Hogan's work repairing the repair methodology for the Sumner Road retaining wall - stage 4.
A paper which outlines the observed damage to Christchurch City Council-owned retaining walls and the repair solutions developed.
Workers undertake repairs to the Avondale Road bridge.
An entry from Deborah Fitchett's blog for 31 January 2012, posted to Livejournal. The entry is titled, "My #eqnz repairs story".The entry was downloaded on 13 April 2015.
Photograph captioned by BeckerFraserPhotos, "The Edmonds Clock on Oxford Terrace looks quite unlike itself, but at least it is being protected while it is repaired".
An entry from Deborah Fitchett's blog for 31 January 2012, posted to Dreamwidth. The entry is titled, "My #eqnz repairs story".The entry was downloaded on 16 April 2015.
A conference paper prepared for the 4th Australasian Engineering Heritage Conference which outlines the challenges faced by SCIRT when repairing the Armagh Bridge, Colombo Bridge and Antigua Bridge.
Workers repairing pipes on St Johns Street in Woolston.
Workers repairing pipes on St Johns Street in Woolston.
Workers repairing pipes on St Johns Street in Woolston.
Workers repairing pipes on St Johns Street in Woolston.
Machinery working to repair the railway line near Kaiapoi.
An aerial photograph looking south over the Arts Centre on Worcester Boulevard. Scaffolding and cranes can be seen around the building which is having extensive repairs done to it after the earthquakes.
A brochure created for Beca Heritage Week 2014, outlining SCIRT's repair work on heritage structures in the Central City. It was handed out to members of the public at SCIRT's walk and talk tours.
Repairs are being carried out on the Avondale Road bridge.
High demolition rates were observed in New Zealand after the 2010-2011 Canterbury Earthquake Sequence despite the success of modern seismic design standards to achieve required performance objectives such as life safety and collapse prevention. Approximately 60% of the multi-storey reinforced concrete (RC) buildings in the Christchurch Central Business District were demolished after these earthquakes, even when only minor structural damage was present. Several factors influenced the decision of demolition instead of repair, one of them being the uncertainty of the seismic capacity of a damaged structure. To provide more insight into this topic, the investigation conducted in this thesis evaluated the residual capacity of moderately damaged RC walls and the effectiveness of repair techniques to restore the seismic performance of heavily damaged RC walls. The research outcome provided insights for developing guidelines for post-earthquake assessment of earthquake-damaged RC structures. The methodology used to conduct the investigation was through an experimental program divided into two phases. During the first phase, two walls were subjected to different types of pre-cyclic loading to represent the damaged condition from a prior earthquake, and a third wall represented a repair scenario with the damaged wall being repaired using epoxy injection and repair mortar after the pre-cyclic loading. Comparisons of these test walls to a control undamaged wall identified significant reductions in the stiffness of the damaged walls and a partial recovery in the wall stiffness achieved following epoxy injection. Visual damage that included distributed horizontal and diagonal cracks and spalling of the cover concrete did not affect the residual strength or displacement capacity of the walls. However, evidence of buckling of the longitudinal reinforcement during the pre-cyclic loading resulted in a slight reduction in strength recovery and a significant reduction in the displacement capacity of the damaged walls. Additional experimental programs from the literature were used to provide recommendations for modelling the response of moderately damaged RC walls and to identify a threshold that represented a potential reduction in the residual strength and displacement capacity of damaged RC walls in future earthquakes. The second phase of the experimental program conducted in this thesis addressed the replacement of concrete and reinforcing steel as repair techniques for heavily damaged RC walls. Two walls were repaired by replacing the damaged concrete and using welded connections to connect new reinforcing bars with existing bars. Different locations of the welded connections were investigated in the repaired walls to study the impact of these discontinuities at the critical section. No significant changes were observed in the stiffness, strength, and displacement capacity of the repaired walls compared to the benchmark undamaged wall. Differences in the local behaviour at the critical section were observed in one of the walls but did not impact the global response. The results of these two repaired walls were combined with other experimental programs found in the literature to assemble a database of repaired RC walls. Qualitative and quantitative analyses identified trends across various parameters, including wall types, damage before repair, and repair techniques implemented. The primary outcome of the database analysis was recommendations for concrete and reinforcing steel replacement to restore the strength and displacement capacity of heavily damaged RC walls.
Photograph captioned by BeckerFraserPhotos, "Isaac Theatre Royal - being repaired".
Extensive repairs being made to the sewerage infrastructure on Avonside Drive.
Extensive repairs being made to the sewerage infrastructure on Avonside Drive.
Extensive repairs being made to the sewerage infrastructure on Avonside Drive.
A report which details the findings of a performance audit carried out by the Office of the Auditor-General to assess the effectiveness and efficiency of arrangements to repair Christchurch's horizontal infrastructure.
A copy of the plan developed in 2011 to facilitate a collaborative approach between all stakeholders and minimise the impact on the traffic network, because of the extensive repair works necessary to repair vertical and horizontal infrastructure.
A paper which outlines SCIRT's approach to asset assessment, design and repair of damaged retaining walls, and presents a case study of a retaining wall rebuild, on Cunningham Terrace, Lyttelton.
The flood bank is being completely repaired on Raven Quay in Kaiapoi.
Road cones line a hole in Gayhurst Road, dug for pipe repairs.
The information board for the Riccarton House earthquake repairs and strengthening project.
Photograph captioned by BeckerFraserPhotos, "Kaiapoi foot bridge".
A photograph captioned by Paul Corliss, "Packing for EQC at 38 Belleview Terrace".