Search

found 724 results

Research papers, University of Canterbury Library

As a result of the Canterbury earthquakes, over 60% of the concrete buildings in the Christchurch Central Business District have been demolished. This experience has highlighted the need to provide guidance on the residual capacity and repairability of earthquake-damaged concrete buildings. Experience from 2010 Chile indicates that it is possible to repair severely damaged concrete elements (see photo at right), although limited testing has been performed on such repaired components. The first phase of this project is focused on the performance of two lightly-reinforced concrete walls that are being repaired and re-tested after damage sustained during previous testing.

Audio, Radio New Zealand

New assessment guidelines are reclassifying houses which were previously written off as being repairable, leaving owners up to $180,000 worse off. Kathryn talks to Leanne Curtis, spokesperson for the Canterbury Community Earthquake Recovery Network, and Renee Walker, spokesperson for IAG New Zealand.

Images, UC QuakeStudies

A worker in a high visibility vest and a hard hat repairing and strengthening the outside of a building at the University of Canterbury. The photograph has been captioned by BeckerFraserPhotos, "The repair work on the buildings at the University of Canterbury looks similar to the scenes in the CBD".

Images, UC QuakeStudies

A photograph of earthquake repairs underway in the quad of Christ's College on Rolleston Avenue. A sign on the gate read, "Quake repairs, keep out". Tape reading, "Danger keep out" has been draped across both gates . In the background is a crane, several workers in high-visibility clothing, and building supplies.

Audio, Radio New Zealand

Christchurch Regeneration Minister Megan Woods says it could take 18 months to decide who is liable for the repairs for 660 home-owners caught in legal limbo. They've bought homes where they thought all the earthquake damage had been repaired - and now find more problems have emerged. Ms Woods told us it's not clear who is liable for these repairs - and it could take as long as 18 months to resolve that basic liability issue. EQC's chief executive Sid Miller has already apologised. He tells Susie Ferguson it's an issue he's been aware of in the year he has been with EQC.