Search

found 105 results

Images, eqnz.chch.2010

The old Christchurch Railway Station Clock Tower was damaged during the 7.1 magnitude quake on 4 September 2010 and was braced by the wooden sleeve until repaired. However, although the sleeve did its job during the 6.3 magnitude quake on 22 February 2011, the lower part of the tower started to break away.

Images, UC QuakeStudies

A photograph of the damaged Provincial Council Chambers on Durham Street. The building's roof and walls have collapsed, as has the scaffolding which was erected to repair it after the 4 September 2010 earthquake.

Images, UC QuakeStudies

A fire engine driving past the damaged Provincial Council Legislative Chamber on Durham Street. The building's roof and walls have collapsed, as has the scaffolding which was erected to repair it after the 4 September 2010 earthquake.

Images, UC QuakeStudies

The damaged Provincial Council Legislative Chamber on Durham Street in the aftermath of the 22 February earthquake. The building's roof and walls have collapsed, as has the scaffolding which was erected to repair it after the 4 September earthquake.

Audio, Radio New Zealand

Many Christchurch trades people are refusing to carry out quake repairs unless the homeowner agrees to pay the bill, saying it takes too long to get the money out of the Earthquake Commission. Some contractors say they still haven't been paid for jobs done after the quake in September and the amount of debt some businesses are carrying are putting them in jeopardy.

Images, UC QuakeStudies

The damaged Provincial Council Legislative Chamber on Durham Street in the aftermath of the 22 February 2011 earthquake. The building's roof and walls have collapsed, as has the scaffolding which was erected to repair it after the 4 September 2010 earthquake.

Images, UC QuakeStudies

The damaged Provincial Council Legislative Chamber on Durham Street in the aftermath of the 22 February 2011 earthquake. The building's roof and walls have collapsed, as has the scaffolding which was erected to repair it after the 4 September 2010 earthquake.

Images, UC QuakeStudies

The Lyttelton Coffee Company building on London Street in Lyttelton is weatherproofed with black tarpaulins. The spray-painted signs guide customers to Samo Coffee Lounge, a cafe run by the staff of Lyttelton Coffee Company while the building is being repaired.

Images, UC QuakeStudies

An aerial photograph of the PricewaterhouseCoopers building. The photograph is captioned by BeckerFraserPhotos, "PricewaterhouseCoopers building at 119 Armagh Street. Its status is uneconomic to repair, so it will be demolished. Copthorne Central is visible behind it and will be staying".

Images, UC QuakeStudies

A crane beside the boiler chimney in the University of Canterbury's Facilities Management yard. The photographer comments, "The University restarts its teaching, and the techies in e-learning move out of NZi3. Inspection and repairs to the University's boiler system. It's getting cooler, we'll need heat soon - but we need accessible buildings first".

Images, UC QuakeStudies

Civil Defence staff walking down Durham Street, a fire engine behind them. Beside them, the damaged Provincial Council Legislative Chamber can be seen. The building's roof and walls have collapsed, as has the scaffolding that had been erected to repair it after the 4 September 2010 earthquake.

Images, UC QuakeStudies

Steel bracing on the front of the Worcester Street face of the Octagon Live Restaurant (formerly Trinity Church), which is being repaired. The scaffolding has been decorated with sculptures of people kayaking, cycling, climbing and bungee jumping. Some of the figures are wearing santa hats. A fence has been constructed at the base of the building.

Images, UC QuakeStudies

Steel bracing on the front of the Worcester Street face of the Octagon Live Restaurant (formerly Trinity Church), which is being repaired. The scaffolding has been decorated with sculptures of people kayaking, cycling, climbing and bungee jumping. Some of the figures are wearing santa hats. A fence has been constructed at the base of the building.

Images, UC QuakeStudies

Steel bracing on the front of the Worcester Street face of the Octagon Live Restaurant (formerly Trinity Church), which is being repaired. The scaffolding has been decorated with sculptures of people kayaking, cycling, climbing and bungee jumping. Some of the figures are wearing santa hats. A fence has been constructed at the base of the building.

Images, UC QuakeStudies

Steel bracing on the front of the Worcester Street face of the Octagon Live Restaurant (formerly Trinity Church), which is being repaired. The scaffolding has been decorated with sculptures of people kayaking, cycling, climbing and bungee jumping. Some of the figures are wearing santa hats. A fence has been constructed at the base of the building.

Images, UC QuakeStudies

Steel bracing on the front of the Worcester Street face of the Octagon Live Restaurant (formerly Trinity Church), which is being repaired. The scaffolding has been decorated with sculptures of people kayaking, cycling, climbing and bungee jumping. Some of the figures are wearing santa hats. A fence has been constructed at the base of the building.

Images, UC QuakeStudies

Steel bracing on the front of the Worcester Street face of the Octagon Live Restaurant (formerly Trinity Church), which is being repaired. The scaffolding has been decorated with sculptures of people kayaking, cycling, climbing and bungee jumping. Some of the figures are wearing santa hats. A fence has been constructed at the base of the building.

Images, UC QuakeStudies

A view looking south down Durham Street. Two fire engines are driving north, and a pair of construction workers are walking up the road. Behind them is the damaged Provincial Council Legislative Chambers. The building's walls and roof have collapsed, as has the scaffolding which was erected to repair it after the 4 September 2010 earthquake.

Images, UC QuakeStudies

Scaffolding that has been constructed on the Manchester Street face of the Octagon Live Restaurant (formerly Trinity Church), which is being repaired. Masonry has fallen from one of the building's gables, and the resultant gap has been weather proofed with plywood and a tarpaulin. The site has been enclosed in a safety fence that cuts off one lane of the road.

Images, UC QuakeStudies

Scaffolding that has been constructed on the Manchester Street face of the Octagon Live Restaurant (formerly Trinity Church), which is being repaired. Masonry has fallen from one of the building's gables, and the resultant gap has been weather proofed with plywood and a tarpaulin. The site has been enclosed in a safety fence that cuts off one lane of the road.

Images, UC QuakeStudies

Scaffolding that has been constructed on the Manchester Street face of the Octagon Live Restaurant (formerly Trinity Church), which is being repaired. Masonry has fallen from one of the building's gables, and the resultant gap has been weather proofed with plywood and a tarpaulin. The site has been enclosed in a safety fence that cuts off one lane of the road.