Hays NAWIC Excellence Awards 2016 submission: Category: Professional Trade…
Articles, UC QuakeStudies
An award submission nominating Jane Taylor for the Hays NAWIC Excellence Awards 2016: Category: Professional Tradeswoman of the Year.
An award submission nominating Jane Taylor for the Hays NAWIC Excellence Awards 2016: Category: Professional Tradeswoman of the Year.
An abstract which describes the content of Kristen MacAskill's full PhD thesis.
A plan which outlines the processes and IT applications and services required to manage the SCIRT programme. The first version of this plan was produced on 9 August 2011.
A plan which outlines how SCIRT is to carry out condition investigations and analysis. The first version of this plan was produced on 1 September 2011.
A plan which aims to ensure an environment of Zero Harm on SCIRT worksites. The first version of this plan was produced on 29 July 2011.
A plan which outlines how to manage the environmental impacts that result from SCIRT works. The first version of this plan was produced on 20 July 2011.
A document which stipulates SCIRT's minimum standard for managing the risks arising from working around services.
A document which specifies the technical requirements for the rehabilitation and repair of pipes using lining methodologies during the SCIRT programme of work.
A plan which outlines the scope, approach and key deliverables for communications and stakeholder engagement for SCIRT. The first version of this plan was produced on 7 January 2013.
A plan which documents how SCIRT is to efficiently and effectively ramp down the delivery of its work, demobilise facilities and resources and wind up the organisation.
An entry from Deborah Fitchett's blog for 23 February 2016, posted to Livejournal. The entry is titled, "In which five years".The entry was downloaded on 2 November 2016.
A report which details the archaeological investigations carried out during the course of SCIRT projects 11115 and 11159, wastewater renewal work and storm water repair work on Ferry Road.
A pdf copy of a PowerPoint presentation made for the Water Services Association of Australia conference, about SCIRT's approach to asset investigation after the Canterbury earthquakes of 2010 and 2011.
A paper which outlines what had been achieved by SCIRT's Training Team, and proposing an approach to ensure that the learnings from SCIRT be transferred to wider industry.
A plan which sets out how SCIRT will carry out internal communication over the life of its programme of work. The first version of this plan was produced on 24 January 2011.
A plan which defines the framework for performance measurement to align SCIRT with the objectives from the Alliance Agreement objectives. The first version of this plan was produced on 20 August 2011.
A plan which defines the risk and opportunity management activities to be applied by SCIRT to meet SCIRT objectives. The first version of this plan was produced on 12 September 2011.
An entry from Deborah Fitchett's blog for 23 February 2016, posted to Dreamwidth. The entry is titled, "In which five years".The entry was downloaded on 2 November 2016.
A plan which describes how SCIRT would manage the risks associated with rebuilding horizontal infrastructure within Christchurch's central city area. The first version of this plan was produced on 24 October 2013.
A plan which documents the process SCIRT will follow to identify and pass on learnings from its programme of work. The first version of this plan was produced on 21 June 2016.
A video of a keynote presentation by Sir John Holmes during the sixth plenary of the 2016 People in Disasters Conference. The presentation is titled, "International Thoughts".
A plan which proactively addresses the risk of fraud and lays out the actions that SCIRT will take when any suspected fraud is reported or discovered. The first version of this plan was produced on 12 February 2014.
A plan which identifies items that will define value for the programme of work and explain processes that will measure the achievement of value outcomes. The first version of this plan was produced on 6 September 2011.
A plan which defines the procurement activities to be applied to SCIRT and explains how those activities are to be undertaken to meet SCIRT objectives and requirements. The first version of this plan was produced on 14 September 2011.
A submission produced by the consultancies for the ACENZ Innovate NZ Awards of Excellence 2016, providing details about how the design team supporting SCIRT was formed, and how successful design delivery was achieved.
A plan which describes how SCIRT will manage the coordination of utility authority liaison and utility relocation or protection during the design and construction phases of the rebuild schedule. The first version of this plan was produced on 15 November 2011.
A guideline to inform designers on the design of an Automated Flushing Siphon System as a means to reduce the frequency of blockages on the wastewater network caused by pipe dips and flat grades.
A report which details the findings of a follow-up performance audit carried out by the Office of the Auditor-General to assess the effectiveness and efficiency of arrangements to repair Christchurch's horizontal infrastructure.
A plan which outlines how timely and accurate information relating to estimating, actual project costs, future commitments and total forecast cost will be managed and reported for each project phase in the programme. The first version of this plan was produced on 24 June 2011.
A plan which provides SCIRT with clear direction and guidelines regarding communication in the event of a crisis. The first version of this plan was produced on 1 December 2013. Note that personal details of key personnel have been removed from this document.