A plan which describes the framework, principles and process for determining project prioritisation and the sequence in which those projects are carried out. The first version of this plan was produced on 23 September 2011.
A plan which outlines how projects will be estimated to generate project Target Out-turn Costs (TOCs), and how these link into the programme TOC. The first version of this plan was produced on 29 July 2011.
Aftermath of September 4th Earthquake in Canterbury (area covers Christchurch City) NZ. Empty fuel tanks lifted out of forecourt at petrol station on Pages Road.
A photograph of CPIT students and members of the public constructing an outdoor pizza oven for Gap Filler out of clay and bricks. The public workshop was part of FESTA 2012.
A photograph of CPIT students and members of the public constructing an outdoor pizza oven for Gap Filler out of clay and bricks. The public workshop was part of FESTA 2012.
A photograph of CPIT students and members of the public constructing an outdoor pizza oven for Gap Filler out of clay and bricks. The public workshop was part of FESTA 2012.
A photograph of CPIT students and members of the public constructing an outdoor pizza oven for Gap Filler out of clay and bricks. The public workshop was part of FESTA 2012.
A photograph of CPIT students and members of the public constructing an outdoor pizza oven for Gap Filler out of clay and bricks. The public workshop was part of FESTA 2012.
A photograph of CPIT students and members of the public constructing an outdoor pizza oven for Gap Filler out of clay and bricks. The public workshop was part of FESTA 2012.
A close-up photograph of the damage to the support arm of the clock hour setting circle from the Townsend Telescope. The arm was bent out of shape during the 22 February 2011 earthquake.
An example of a SCIRT safety alert. Safety alerts were sent out to Delivery Team Health and Safety representatives after an incident who then sent or delivered them to subcontractors.
A report which details the findings of a performance audit carried out by the Office of the Auditor-General to assess the effectiveness and efficiency of arrangements to repair Christchurch's horizontal infrastructure.
University of Canterbury students attend a lecture in a tent while lecture theatres were closed for structural testing. The photographer comments, "The University restarts its teaching, and the techies in e-learning move out of NZi3. Lectures in progress in UC's tent village".
Part of the forecourt at the Shell Shirley petrol station has lifted above the rest, after the underground petrol tanks were pushed upwards by liquefaction. Liquefaction silt covers the lower part of the forecourt. The photographer comments, "Tanks at Shell Shirley floated out of the ground".
A photograph of CPIT students and members of the public constructing an outdoor pizza oven for Gap Filler out of clay and bricks. The public workshop was part of FESTA 2012.
A photograph of CPIT students and members of the public constructing an outdoor pizza oven for Gap Filler out of clay and bricks. The public workshop was part of FESTA 2012.
A damaged wooden footbridge across the Avon River beside University Drive is blocked off with sheets of plywood and danger signs. The photographer comments, "The University restarts its teaching, and the techies in e-learning move out of NZi3. The bridge to the Rec Centre".
A report which details the findings of a follow-up performance audit carried out by the Office of the Auditor-General to assess the effectiveness and efficiency of arrangements to repair Christchurch's horizontal infrastructure.
Students sit outside the InTentCity 6.3 Cafe, which was set up in a tent in the Law car park while University of Canterbury buildings were closed for structural testing. The photographer comments, "The University restarts its teaching, and the techies in e-learning move out of NZi3".
Members of the University of Canterbury's Printery team in the Printery's reception area. The photographer comments, "The University restarts its teaching, and the techies in e-learning move out of NZi3. We are sharing an office at the printery building. Looking from our office through to Printery reception".
The InTentCity 6.3 Cafe, which was set up in a tent in the Law car park while University of Canterbury buildings were closed for structural testing. The photographer comments, "The University restarts its teaching, and the techies in e-learning move out of NZi3. New cafe - InTentCity. (Get it...?)".
A crane beside the boiler chimney in the University of Canterbury's Facilities Management yard. The photographer comments, "The University restarts its teaching, and the techies in e-learning move out of NZi3. Inspection and repairs to the University's boiler system. It's getting cooler, we'll need heat soon - but we need accessible buildings first".
Water and liquefaction run down the driveway of a house in Richmond. The driveway level is noticeably higher than the footpath in front. The photographer comments, "These photos show our old house in River Rd and recovery work around Richmond and St Albans. A house along the block has water running out the driveway".
Working at getting things out of the Victoria Square before it is demolished. www.stuff.co.nz/the-press/news/christchurch-earthquake-20... What I found on my walk around the city January 15, 2014 Ch...
Students sit outside the InTentCity 6.3 Cafe, which was set up in a tent in the Law car park while University of Canterbury buildings were closed for structural testing. The photographer comments, "The University restarts its teaching, and the techies in e-learning move out of NZi3. The cafe has an outside seating area under the trees".
Internal damage to a house in Richmond. A doorframe has visibly warped, leaving a gap between the frame and the door. Outside, cracks can be seen in the concrete patio. The photographer comments, "Sunroom - bifold doors are now separated from the frame. The doors on the left blew right out in a strong wind 2 weeks after the quake".
Victoria Apartments demolition is under way on a walk around the city to find out what is happening in the city. Feb 17, 2014 Christchurch New Zealand. "soft-stripped", which means that any remaining belongings will be removed, as well as furnishings and internal walls.
A document which explains the pre-approval process for specialist lining contractors working on the SCIRT horizontal repair programme.This document has had sections removed and redacted to protect contractors' commercial interests.For a current list of approved contractors authorised to carry out lining works on Christchurch City Council assets, contact the Council.
Lei Zhang, a member of the University of Canterbury's E-Learning team, in their temporary office in the University Printery building. The photographer comments, "The University restarts its teaching, and the techies in e-learning move out of NZi3. We are sharing an office at the printery building. Richard Holliday and Aimee Leaning do their pre-press and outsourcing work, while Lei configures a new video streaming system".
A warning sign posted on River Road beside the Avon River reads "Health warning, contaminated water. Due to sewage overflows this water is unsafe for human contact and activity and is a public health risk. Please keep all people and pets out of contact with the water and do not cosume and seafood or shellfish collected from this area." The photographer comments, "A bike ride around the CBD. River Rd subsidence".