Search

found 236 results

Videos, UC QuakeStudies

A video of an interview with Earthquake Recovery Minister Gerry Brownlee and Frank Delli Cicchi, the Grand Central Group Australian and New Zealand general manager, about the demolition of the Hotel Grand Chancellor. The Grand Chancellor is the tallest building in Christchurch, and was severely damaged during the 22 February 2011 earthquake. Fletcher Construction have been chosen to demolish the building.

Research papers, University of Canterbury Library

The capability of self-compacting concrete (SCC) in flowing through and filling in even the most congested areas makes it ideal for being used in congested reinforced concrete (RC) structural members such as beam-column joints (BCJ). However, members of tall multi-storey structures impose high capacity requirements where implementing normal-strength self-compacting concrete is not preferable. In the present study, a commercially reproducible high-strength self-compacting concrete (HSSCC), a conventionally vibrated high-strength concrete (CVHSC) and a normal strength conventionally vibrated concrete (CVC) were designed using locally available materials in Christchurch, New Zealand. Following the guidelines of the New Zealand concrete standards NZS3101, seven beam-column joints (BCJ) were designed. Factors such as the concrete type, grade of reinforcement, amount of joint shear stirrups, axial load, and direction of casting were considered variables. All BCJs were tested under a displacement-controlled quasi-static reversed cyclic regime. The cracking pattern at different load levels and the mode of failure were also recorded. In addition, the load, displacement, drift, ductility, joint shear deformations, and elongation of the plastic hinge zone were also measured during the experiment. It was found that not only none of the seismically important features were compromised by using HSSCC, but also the quality of material and ease of construction boosted the performance of the BCJs.

Research papers, University of Canterbury Library

The performance of buildings in recent New Zealand earthquakes (Canterbury, Seddon and Kaikōura), delivered stark lessons on seismic resilience. Most of our buildings, with a few notable exceptions, performed as our Codes intended them to, that is, to safeguard people from injury. Many buildings only suffered minor structural damage but were unable to be reused and occupied for significant periods of time due to the damage and failure of non-structural elements. This resulted in substantial economic losses and major disruptions to our businesses and communities. Research has attributed the damage to poor overall design coordination, inadequate or lack of seismic restraints for non structural elements and insufficient clearances between building components to cater for the interaction of non structural elements under seismic actions. Investigations have found a clear connection between the poor performance of non-structural elements and the issues causing pain in the industry (procurement methods, risk aversion, the lack of clear understanding of design and inspection responsibility and the need for better alignment of the design codes to enable a consistent integrated design approach). The challenge to improve the seismic performance of non structural elements in New Zealand is a complex one that cuts across a diverse construction industry. Adopting the key steps as recommended in this paper is expected to have significant co-benefits to the New Zealand construction industry, with improvements in productivity alongside reductions in costs and waste, as the rework which plagues the industry decreases.

Audio, Radio New Zealand

Nine to Noon has been told that the Ministry of Business, Innovation and Employment is leading a multiagency group - including the Earthquake Commission, Fletcher Construction's EQR and the Department of Prime Minister and Cabinet - to try to identify which houses may have have had a high risk of containing asbestos and thereby quantify how many people may have been exposed. With Graham Darlow, Chief executive of Fletcher Construction and Gerry Brownlee, Minister for Canterbury Earthquake Recovery.

Audio, Radio New Zealand

So what's the Prime Minister Jacinda Ardern got to look forward to when she's back at work? Construction firms falling over, business confidence at a nine-year low, unemployment rising and New Zealand is desperate need of infrastructure to cope with its 10 percent population shock in the last five years. Welcome back Ms Ardern! Ebert Construction is the latest construction company to go belly-up. The Panelists consider why, when the country needs new buildings the most, construction companies aren't making the grade? Peter Silcock of Civil Contractors talks bout the failing of processes and business models used by building firms. Christchurch central seems to have a business micro-climate. And right now it's chilly. The CBD is nothing like it used to be before the 2011 earthquake and those businesses that re-opened say they really had no choice because of the demands of insurance companies. The Kingsland Business Society in Auckland is offering free child minding for couples who go out for the evening in the suburb. United States federal air marshals now follow seemingly ordinary citizens not suspected of a crime, nor on any terrorist watch list. It's a new surveillance programme called "Quiet Skies" and it collects extensive information on travellers based on their behaviour on flights and especailly in airports.