Search

found 1024 results

Images, UC QuakeStudies

A member of the New Zealand Fire Service adjusting his face mask at the base of the collapsed Canterbury Television Building on Madras Street. Behind him, emergency personnel are searching the rubble for trapped people.

Images, UC QuakeStudies

Damage to the Lyttelton Hotel on Norwich Quay. The top of the building has crumbled, bringing the roof down with it. Bricks have fallen on the awning and all along the footpath. Wire fencing and road cones have been used to create a cordon around the building.

Images, UC QuakeStudies

Christchurch-based technician, Nick Brown, and Ralph Moore, Deputy Task Force Leader for New Zealand Search and Rescue, talking to the press. Nick and Ralph were part of the USAR team working on the Cathedral and Press Buildings after the earthquake.

Images, UC QuakeStudies

Christchurch-based technician, Nick Brown, and Ralph Moore, Deputy Task Force Leader for New Zealand Search and Rescue, talking to the press. Nick and Ralph were part of the USAR team working on the Cathedral and Press Buildings after the earthquake.

Images, UC QuakeStudies

Christchurch-based technician, Nick Brown, and Ralph Moore, Deputy Task Force Leader for New Zealand Search and Rescue, talking to the press. Nick and Ralph were part of the USAR team working on the Cathedral and Press Buildings after the earthquake.

Images, UC QuakeStudies

Damage to the former Lyttelton Public Library on the corner of Oxford Street and Sumner Road. The facade along the top of the building has crumbled into the street. Tape and road cones have been used to create a cordon around the building.

Images, UC QuakeStudies

Christchurch-based technician, Nick Brown, and Ralph Moore, Deputy Task Force Leader for New Zealand Search and Rescue, talking to the press. Nick and Ralph were part of the USAR team working on the Cathedral and Press Buildings after the earthquake.

Images, UC QuakeStudies

An image from a Army News March 2011 photo compilation titled, "All in a Days Work". The image is captioned, "USAR workers sift through the crumbled ruins of a building". The building they are working on is the CTV building which collapsed during the 22 February 2011 earthquake.

Images, UC QuakeStudies

Damage to the Lyttelton Hotel on Norwich Quay. The top of the building has crumbled, bringing the roof down with it. Bricks have fallen on the awning and all along the footpath. Wire fencing and road cones have been used to create a cordon around the building.

Images, UC QuakeStudies

Damage to the Royal Hotel on the corner of Norwich Quay and Canterbury Street in Lyttelton. The columns next to the windows have cracked, indicating that there is major structural damage to the building. Wire fencing and cones have been used to create a cordon around the building.

Images, UC QuakeStudies

Damaged buildings along London Street. Wire fencing has been used to keep people away. To the left is the Volcano Cafe, centre the Lava Bar and on the right is a fish and chip shop. A pile of rubble lies on the street from the damaged buildings.

Research papers, The University of Auckland Library

The 2010–2011 Canterbury earthquakes, which involved widespread damage during the February 2011 event and ongoing aftershocks near the Christchurch Central Business District, left this community with more than $NZD 40 billion in losses (~20 % GDP), demolition of approximately 60 % of multi-storey concrete buildings (3 storeys and up), and closure of the core business district for over 2 years. The aftermath of the earthquake sequence has revealed unique issues and complexities for the owners of commercial and multi-storey residential buildings in relation to unexpected technical, legal, and financial challenges when making decisions regarding the future of their buildings impacted by the earthquakes. The paper presents a framework to understand the factors influencing post-earthquake decisions (repair or demolish) on multi-storey concrete buildings in Christchurch. The study, conducted in 2014, includes in-depth investigations on 15 case-study buildings using 27 semi-structured interviews with various property owners, property managers, insurers, engineers, and government authorities in New Zealand. The interviews revealed insights regarding the multitude of factors influencing post-earthquake decisions and losses. As expected, the level of damage and repairability (cost to repair) generally dictated the course of action. There is strong evidence, however, that other variables have significantly influenced the decision on a number of buildings, such as insurance, business strategies, perception of risks, building regulations (and compliance costs), and government decisions. The decision-making process for each building is complex and unique, not solely driven by structural damage. Furthermore, the findings have put the spotlight on insurance policy wordings and the paradoxical effect of insurance on the recovery of Christchurch, leading to other challenges and issues going forward.