![](https://live.staticflickr.com/4112/5090006195_8fba64fd61_m.jpg)
A photograph of the Durham Street Methodist Church. Damage can be seen to the parapet of the northern tower.
A photograph of the Durham Street Methodist Church. Damage can be seen to the parapet of the northern tower.
A photograph of a van from the Christchurch Chinese Methodist Church. The van has been crushed by fallen bricks.
A photograph of workers in a crane-raise platform removing bricks from the earthquake-damaged Christchurch Chinese Methodist Church on Papanui Road.
A photograph of a van from the Christchurch Chinese Methodist Church. The van has been crushed by fallen bricks.
Strengthening work being undertaken by two workers suspended over the gable of the Wesleyan Methodist Church on the corner of Colombo and Brougham Street in Sydenham.
A photograph of workers in a crane-raise platform removing bricks from the earthquake-damaged Christchurch Chinese Methodist Church on Papanui Road.
A photograph of the Christchurch Chinese Methodist Church on Papanui Road. The top of the tower's walls have crumbled, the bricks falling onto the pavement below.
The roof of the right tower on the Durham Street Methodist Church. Part of the stonework on the left has broken and fallen off the building.
The roof of the right tower on the Durham Street Methodist Church. Part of the stonework on the left has broken and fallen off the building.
The Methodist Church of Durham Street with wire fencing around the building. A red sticker on the front door indicates that the building is unsafe to enter.
A photograph of the Durham Street Methodist Church blocked off by wire fencing. The tip of the façade is damaged.
Damage to the Christchurch Chinese Methodist Church (formerly the St Albans Wesleyan Church) in Merivale.
Damage to the Christchurch Chinese Methodist Church (formerly the St Albans Wesleyan Church) in Merivale.
Damage to the Christchurch Chinese Methodist Church (formerly the St Albans Wesleyan Church) in Merivale.
A photograph of the Christchurch Chinese Methodist Church on Papanui Road. The bricks have crumbled from the gable, exposing the wooden structure underneath and crushing a van.
A photograph of the earthquake damage to the back of the Christchurch Chinese Methodist Church on Papanui Road. The brick wall has crumbled at the gable, exposing the wooden structure inside.
A photograph of the Christchurch Chinese Methodist Church on Papanui Road. The bricks have crumbled from the gable, exposing the wooden structure underneath and crushing a van.
The tip of the gable on the Durham Street Methodist Church. The stone work has cracked and is leaning forward. Bracing can be seen at the back, holding the stonework in place.
A photograph of a van crushed by fallen bricks outside Christchurch Chinese Methodist Church in Merivale.
A photograph of a van crushed by fallen bricks outside Christchurch Chinese Methodist Church in Merivale.
A photograph of a van crushed by fallen bricks outside Christchurch Chinese Methodist Church in Merivale.
A photograph of a van crushed by fallen bricks outside Christchurch Chinese Methodist Church in Merivale.
Damage to the Edgeware Road Methodist Church. The front gable wall and rose window have fallen.
The Christchurch Methodist Church van takes a hit from the falling gable end of the church.
A photograph of the Durham Street Methodist Church blocked off by wire fencing. The tip of the façade is damaged, and bracing holds it up from behind.
A photograph of a clothing bin crushed by fallen bricks outside Christchurch Chinese Methodist Church in Merivale.
A photograph of the Durham Street Methodist Church blocked off by wire fencing. The top right corner of the building is damaged and some of the masonry has fallen onto to the footpath below.
A photograph of the Durham Street Methodist Church. The parapet at the tip of the front gable has come loose and is leaning towards the road. Wire fencing has been placed around the building as a cordon.
The Durham Street Methodist Church. The top of the roof has broken away and is now boarded up. Bracing has been placed in the front of the building to hold it together and limit further damage from aftershocks. Scaffolding has been erected on the right side.