Damage to the Music Centre of Christchurch building on Barbadoes Street. Tarpaulins have been used to weather proof a gap in one of the building's gables from where masonry has fallen.
The southern side of the Christ Church Cathedral with boarded up windows and damage to the roof above both of the transepts. Damaged masonry has been piled on the ground in front and one of the spires has been removed and braced with steel in the foreground.
Damage to one of the front towers of the Durham Street Methodist Church. Some masonry from the corner of the tower has collapsed, and the structure has been secured by blue straps.
Damage to one of the gables of the Music Centre of Christchurch building on Barbadoes Street. The gaps left by the collapse of the building's masonry have been weather proofed with a tarpaulin.
Damage to one of the gables of the Music Centre of Christchurch building on Barbadoes Street. The gaps left by the collapse of the building's masonry have been weather proofed with a tarpaulin.
A photograph of the earthquake damage to the Canterbury Provincial Chambers Buildings on Durham Street. Large sections of the masonry have collapsed, spilling onto the road. Wire fencing has been placed around the building as a cordon. Scaffolding erected up the side of the building after the 4 September 2010 earthquake has collapsed. In the distance, a crane is parked on the street.
Damage to the former Sumner Borough Council building. The brickwork is badly cracked, and parts of the wall have collapsed, exposing the interior. Shipping containers below the building protect the street from falling masonry.
Damage to the former Sumner Borough Council building. The brickwork is badly cracked, and parts of the wall have collapsed, exposing the interior. Shipping containers below the building protect the street from falling masonry.
Damage to the former Sumner Borough Council building. The brickwork is badly cracked, and parts of the wall have collapsed, exposing the interior. Shipping containers below the building protect the street from falling masonry.
The connections between walls of unreinforced masonry (URM) buildings and flexible timber diaphragms are critical building components that must perform adequately before desirable earthquake response of URM buildings may be achieved. Field observations made during the initial reconnaissance and the subsequent damage surveys of clay brick URM buildings following the 2010/2011 Canterbury, New Zealand earthquakes revealed numerous cases where anchor connections joining masonry walls or parapets with roof or floor diaphragms appeared to have failed prematurely. These observations were more frequent for the case of adhesive anchor connections than for the case of through-bolt connections (i.e. anchorages having plates on the exterior façade of the masonry walls). Subsequently, an in-field test program was undertaken in an attempt to evaluate the performance of adhesive anchor connections between unreinforced clay brick URM walls and roof or floor diaphragm. The study consisted of a total of almost 400 anchor tests conducted in eleven existing URM buildings located in Christchurch, Whanganui and Auckland. Specific objectives of the study included the identification of failure modes of adhesive anchors in existing URM walls and the influence of the following variables on anchor load-displacement response: adhesive type, strength of the masonry materials (brick and mortar), anchor embedment depth, anchor rod diameter, overburden level, anchor rod type, quality of installation and the use of metal foil sleeve. In addition, the comparative performance of bent anchors (installed at an angle of minimum 22.5o to the perpendicular projection from the wall surface) and anchors positioned horizontally was investigated. Observations on the performance of wall-to-diaphragm connections in the 2010/2011 Canterbury earthquakes and a snapshot of the performed experimental program and the test results are presented herein. http://hdl.handle.net/2292/21050
A photograph of a block of earthquake-damaged buildings on Manchester Street. The outer wall of the second storey has collapsed, the bricks and other rubble spilling onto the footpath. Several cars have been crushed by the falling rubble.
A photograph of the Durham Street Methodist Church blocked off by wire fencing. The tip of the façade is damaged, and bracing holds it up from behind.
A photograph of the earthquake damage to the Cathedral of the Blessed Sacrament on Barbadoes Street. The tower on the right has crumbled and the masonry has fallen to the pavement below. A car has been crushed by the fallen rubble. The dome of the left tower has collapsed and the cross at the top of the building is on a lean.
An earthquake-damaged building on Ferry Road. A silver tarpaulin has been used to weather proof a section of the building where masonry has fallen away, and a safety fence has been erected at the building's base.
A photograph of the earthquake damage to the Iconic bar on the corner of Manchester and Gloucester Streets. Large sections of the outer walls have collapsed, the bricks and masonry spilling onto the footpath below, crushing several cars. USAR codes have been spray-painted near the door and a red sticker has been taped above. The red sticker indicates that the building is unsafe to enter.
St John the Baptist Church on Latimer Square. The masonry of the bell tower has crumbled onto the lawn, exposing the inside. Damage to the roof and the tip of the gable can also be seen.
A photograph of the earthquake damage to the Canterbury Provincial Chambers. The top section of the building has crumbled, the masonry spilling onto the footpath. Wire fencing has been placed around the building as a cordon.
A photograph of the earthquake damage to the Iconic bar on the corner of Manchester and Gloucester Streets. Large sections of the outer walls have collapsed, the bricks and other rubble spilling onto the footpath below.
Structural damage to St Elmo Courts with diagonal cracks between the windows of the building. These cracks show that there has been rocking of the masonry piers which means there is no vertical reinforcement provided in the walls.
A photograph of a member of the Wellington Emergency Management Office Emergency Response Team standing in front of the earthquake-damaged Avonmore House on Hereford Street. Sections of the walls have crumbled, spilling bricks and masonry onto the footpath and street below. Many of the windows have warped, breaking the glass. USAR codes have been spray-painted on one of the columns. A red sticker taped to the door indicates that the building is unsafe to enter.
A photograph of a member of the Wellington Emergency Management Office Emergency Response Team standing in front of the earthquake-damaged Avonmore House on Hereford Street. Sections of the walls have crumbled, spilling bricks and masonry onto the footpath and street below. Many of the windows have also warped, breaking the glass. USAR codes have been spray-painted on one of the columns. A red sticker taped to the door indicates that the building is unsafe to enter.
A photograph of the earthquake damage to the Avonmore House on the corner of Hereford Street and Latimer Square. Large cracks have formed in the building, causing sections of the masonry to crumble. The windows on the Hereford Street side of the building have bent out of shape and many of the glass panes have shattered. USAR codes have been spray painted on the column next to the door. In the distance wire fencing has been placed across the street as a cordon.
A house on Avonside Drive showing damage from the 4 September 2010 earthquake. Numerous cracks in the masonry can be seen, and several sections of brick have fallen off the walls. The building's porch has also collapsed. A pile of dried liquefaction is visible in the driveway.
A house on Avonside Drive showing damage from the 4 September 2010 earthquake. Numerous cracks in the masonry can be seen, and several sections of brick have fallen off the walls. The building's porch has also collapsed. A pile of dried liquefaction is visible in the driveway.
Damage to the church hall of St John the Baptist Church in Latimer Square. The roof has been weather proofed with plywood and there are cracks in the buildings masonry. The remains of fallen bricks can be seen on the footpath. A safety fence has been erected around the building.
Damage to the church hall of St John the Baptist Church in Latimer Square. The roof has been weather proofed with plywood and there are cracks in the buildings masonry. The remains of fallen bricks can be seen on the footpath. A safety fence has been erected around the building.
Damage to the front gable of the Durham Street Methodist Church. Masonry has fallen from the top of the gable, and the resulting gap has been weather proofed with plywood, tarpaulins and metal tiles. The steel bracing propping the whole front wall can be seen at the bottom of the photograph.
The September Canterbury earthquake. These pictures were taken of The New Zealand Army, along with Police, minding the cordons. This was beside The Press building, and behind the Christchurch Cathedral. Note: these photos were taken on a cellphone; mind the quality.
Damage to the church hall of St John the Baptist Church in Latimer Square. Masonry has fallen from one of the building's gables and has been piled against its base. The site has been enclosed in a safety fence. A spray-painted sign can be seen at the base of the building reading, "Danger! Wall unstable, stay clear". A piece of plywood is also visible weather proofing the building's roof.
This thesis describes the strategies for earthquake strengthening vintage clay bricks unreinforced masonry (URM) buildings. URM buildings are well known to be vulnerable to damage from earthquake-induced lateral forces that may result in partial or full building collapse. The 2010/2011 Canterbury earthquakes are the most recent destructive natural disaster that resulted in the deaths of 185 people. The earthquake events had drawn people’s attention when URM failure and collapse caused about 39 of the fatality. Despite the poor performance of URM buildings during the 2010/2011 Canterbury earthquakes, a number of successful case study buildings were identified and their details research in-depth. In order to discover the successful seismic retrofitting techniques, two case studies of retrofitted historical buildings located in Christchurch, New Zealand i.e. Orion’s URM substations and an iconic Heritage Hotel (aka Old Government Building) was conducted by investigating and evaluating the earthquake performance of the seismic retrofitting technique applied on the buildings prior to the 2010/2011 Canterbury earthquakes and their performance after the earthquakes sequence. The second part of the research reported in this thesis was directed with the primary aim of developing a cost-effective seismic retrofitting technique with minimal interference to the vintage clay-bricks URM buildings. Two retrofitting techniques, (i) near-surface mounted steel wire rope (NSM-SWR) with further investigation on URM wallettes to get deeper understanding the URM in-plane behaviour, and (ii) FRP anchor are reported in this research thesis.