Search

found 89 results

Images, UC QuakeStudies

Plant beds made out of corrugated iron, greening the empty building sites along Colombo Street. These were placed here by Greening the Rubble, a community project in Christchurch to create temporary public parks and gardens on the sites of demolished buildings.

Images, UC QuakeStudies

The roof of this collapsed building on Atlas Lane has fallen almost intact on top of the rubble. The photographer comments, "Whenever I go past this place it reminds me of a sinking ship".

Images, UC QuakeStudies

A digitally manipulated image of the word 'Lyttelton' made out of damaged bricks. The photographer comments, "This shows the courage and humour of the earthquake wrecked port of Lyttelton. There is lots of little things that make you smile that the locals and volunteers from around the area have created".

Images, UC QuakeStudies

Warning tape on the gate of a residential property near Cranmer Square. The photographer comments, "The yellow tape was put on the gate to warn property [owners] that the house beyond was unsafe. Now there is no house, but by the cobwebs on the handle the tape is doing a great job".

Images, UC QuakeStudies

A toppled chimney on a house in Christchurch. The chimney has toppled onto the house but luckily not broken through the roof. It is now broken and lying on the corrugated iron. Below, plastic sheeting has been placed along the side of the roof to replace the missing gutter.

Images, UC QuakeStudies

A digital copy of a concept drawing of Crack'd for Christchurch's armchair and ottoman artworks. The drawing is of an armchair and an ottoman. A written note near the bottom of the drawing reads, "Cast iron legs sources from Victorian bath tubs".

Images, UC QuakeStudies

The Poet Tree", a Japanese-inspired poetry project on the corner of Liverpool and Cashel Streets. A poem by Matsuo Basho has been hand-written and displayed on a bamboo wall. Below is a bench dedicated to Japanese poet Matsuo Basho and a garden with corrugated iron flowers.

Images, UC QuakeStudies

The Poet Tree", a Japanese-inspired poetry project on the corner of Liverpool and Cashel Streets. A poem by Matsuo Basho has been hand-written and displayed on a bamboo wall. Below is a bench dedicated to Japanese poet Matsuo Basho and a garden with corrugated iron flowers.

Images, UC QuakeStudies

A photograph of Crack'd for Christchurch's partially-constructed armchair artwork. The armchair is on a pallet in Greening the Rubble's workshop. Jonathan Hall has moulded polystyrene, wood, mesh, and concrete over the steel frame to construct the armchair. Two cast-iron bath feet have been attached to the front legs.

Images, UC QuakeStudies

A photograph of Crack'd for Christchurch's partially-constructed armchair artwork. The armchair is on a pallet in Greening the Rubble's workshop. Jonathan Hall has moulded polystyrene, wood, mesh, and concrete over the steel frame to construct the armchair. Two cast-iron bath feet have been attached to the front legs.

Images, UC QuakeStudies

A photograph of Crack'd for Christchurch's partially-constructed armchair artwork. The armchair is on a pallet in Greening the Rubble's workshop. Jonathan Hall has moulded polystyrene, wood, mesh, and concrete over the steel frame to construct the armchair. Two cast-iron bath feet have been attached to the front legs.

Images, UC QuakeStudies

A photograph of Crack'd for Christchurch's partially-constructed armchair artwork. The armchair is on a pallet in Greening the Rubble's workshop. Jonathan Hall has moulded polystyrene, wood, mesh, and concrete over the steel frame to construct the armchair. Two cast-iron bath feet have attached to the front legs.

Images, UC QuakeStudies

A photograph of the steel frame of Crack'd for Christchurch's armchair artwork. The frame is on a pallet in the Greening the Rubble workshop. Two cast-iron bath feet have been attached to the front legs.Crack'd for Christchurch comments, "Mid September 2013. The chair frame was made by Bob Hamilton from Total Fabrications."

Images, UC QuakeStudies

Volunteers photographed around one of Gap Filler's painted pianos. The piano has been set up at the demolished site of the Crowne Plaza Hotel. A wooden structure has been built around the piano with Perspex and corrugated iron on top and plastic sheeting to the left and right. This is to protect the piano and pianist from wind and rain.

Images, UC QuakeStudies

A photograph captioned by BeckerFraserPhotos, "Pieces of iron fretwork from the entrance to the Warners Hotel carefully laid on the ground in front of the building. Thisshows the careful salvaging which has taken place during the demolistion of many heritage building in order to be able to re-use significant pieces later".

Images, UC QuakeStudies

A digitally manipulated image of a damaged building in Madras Street. The photographer comments, "After the 22 February earthquake in Christchurch there was a lot of damaged buildings. Sometimes there is the odd one where being unclothed or de-bricked let the world see their beauty".

Images, UC QuakeStudies

A photograph of the steel frame of Crack'd for Christchurch's armchair artwork. The frame is on a pallet in the Greening the Rubble workshop. Two cast-iron bath feet have been attached to the front legs. The bottom half of the frame has been covered with mesh, wood, polystyrene, and concrete by Jonathan Hall.

Images, UC QuakeStudies

A photograph of a child posing with (from left to right) Iron Man, 'Flat Man', Captain America, Batman and Batman (front) at Christchurch Hospital. The superheroes were there as part of 'Outrageous Burst of All Right: Superhero Surprise', which involved people dressed as superheroes surprising children at Christchurch Hospital with gifts and entertainment. All Right? posted the photograph to their Facebook Timeline on 2 July 2014 at 12:43pm.

Images, UC QuakeStudies

Volunteers photographed with one of Gap Filler's painted pianos. The piano has been set up at the demolished site of the Crowne Plaza Hotel. In the background, Gap Filler's Pallet Pavilion can be seen. The back of the piano has been covered by plastic sheeting with a picture of a dog. A wooden structure has also been built around the piano with Perspex and corrugated iron on top and plastic sheeting to the left and right. This is to protect the piano and pianist from wind and rain.

Images, UC QuakeStudies

The damaged clock tower on Victoria Street, wrapped and braced to prevent further damage. The photographer comments, "Diamond Jubilee Clock Tower in Christchurch. Its legs wrapped up for protection. Volcanic stone and limestone clock tower with ornate wrought iron work with coloured glass around part of the tower and four clock faces. Clock Tower built in this location to commemorate the Diamond Jubilee of Queen Victoria. Has two white marble plaques and one bronze plaque set on stone work above arches".

Videos, UC QuakeStudies

A video showing superheroes and 'All Righties' entertaining and giving gifts at the Christchurch Hospital childrens' wards. The video features Batman, Iron Man, Superwoman, Mr Incredible, Captain America, Black Widow, and Christchurch's own Flat Man, with Batman and Spiderman descending down the side of the building. The video and event were organised by All Right? as part of 'Outrageous Burst of All Right: Superhero Surprise'. The Press published the video in an article by Ged Cann on 28 June 2016 at 5:00am. All Right? posted the link to this article on their Facebook Timeline on 28 June 2014 at 10:55am.

Research papers, University of Canterbury Library

Access to clean and safe drinking water is a fundamental human requirement. However, in many areas of the world natural water sources have been impacted by a variety of biological and chemical contaminants. The ingestion of these contaminants may cause acute or chronic health problems. To prevent such illnesses, many technologies have been developed to treat, disinfect and supply safe drinking water quality. However, despite these advancements, water supply distribution systems can adversely affect the drinking water quality before it is delivered to consumers. The primary aim of this research was to investigate the effect that water distribution systems may have on household drinking water quality in Christchurch, New Zealand and Addis Ababa, Ethiopia. Water samples were collected from the source water and household taps in both cities. The samples were then tested for various physical, chemical and biological water quality parameters. The data collected was also used to determine if water samples complied with national drinking water quality standards in both countries. Independent samples t-test statistical analyses were also performed to determine if water quality measured in the samples collected from the source and household taps was significantly different. Water quality did not vary considerably between the source and tap water samples collected in Christchurch City. No bacteria were detected in any sample. However, the pH and total iron concentrations measured in source and tap water samples were found to be significantly different. The lower pH values measured in tap water samples suggests that corrosion may be taking place in the distribution system. No water samples transgressed the Drinking Water Standards for New Zealand (DWSNZ) MAVs. Monitoring data collected by the Christchurch City Council (CCC) was also used for comparison. A number of pH, turbidity and total iron concentration measurements collected by the CCC in 2011 were found to exceed the guideline values. This is likely due to structural damage to the source wells and pump-stations that occurred during the 2011 earthquake events. Overall, it was concluded that the distribution system does not adversely affect the quality of Christchurch City’s household drinking water. The water quality measured in samples collected from the source (LTP) and household taps in Addis Ababa was found to vary considerably. The water collected from the source complied with the Ethiopian (WHO) drinking water quality standards. However, tap water samples were often found to have degraded water quality for the physical and chemical parameters tested. This was especially the case after supply interruption and reinstatement events. Bacteria were also often detected in household tap water samples. The results from this study indicate that water supply disruptions may result in degraded water quality. This may be due to a drop in pipeline pressure and the intrusion of contaminants through the leaky and cross-connected pipes in the distribution network. This adversely affects the drinking water quality in Addis Ababa.

Research papers, University of Canterbury Library

This project was initiated by ENGEO Limited and KiwiRail Holdings Limited to assess the stability of Slovens Creek Viaduct (specifically its western abutment) and a 3km section of rail corridor between Slovens Creek Viaduct and Avoca on the Midland Line (MDL). Commonly known as the scenic TranzAlpine rail journey (through Arthurs Pass National Park) the MDL connects Greymouth to Christchurch via Rolleston, where the MDL meets the Main South Line into Christchurch. The project area is approximately 40km southeast of Arthurs Pass Township, in the eastern extension of the Castle Hill Basin which is part of the Waimakariri Catchment and Canterbury Foothills. The field area is underlain by Rakaia Terrane, which is part of the Torlesse Composite Terrane forming the basement rock unit for the field area. Cretaceous-Tertiary rocks of the Castle Hill Basin overlie the basement strata and record a transgression-regression sequence, as well as mid-Oligocene submarine volcanism. The stratigraphic sequence in the Castle Hill Basin, and its eastern extension to Avoca, comprises two formations of the Eyre group, the older Broken River Formation and the younger Iron Creek Formation. Deep marine Porter Group limestones, marls, and tuffs of Oligocene age succeed the Iron Creek Formation of the Eyre Group, and probably records the maximum of the transgression. The Enys Formation lies disconformably on the Porter Group and is overlain unconformably by Late Pleistocene glacifluvial and glacial deposits. The Tertiary strata in the Slovens-Avoca rail corridor are weak, and the clay-rich tuff derived from mid-Oligocene volcanism is particularly prone to slaking. Extensive mapping carried out for this project has identified that some 90 percent of the surface along the length of the Slovens-Avoca corridor has been subject to mass movement. The landslides of the Slovens-Avoca rail corridor are clearly younger than the Last Glaciation, and Slovens Creek has been downcutting, with associated faulting and uplift, to form the present day geomorphology of the rail corridor. Deep-seated landslides in the rail corridor extend to Slovens Creek, locally deflecting the stream course, and a generic ground failure model for the rail corridor has been developed. Exploratory geotechnical investigations, including core drilling, installation of an inclinometer and a piezometer, enabled the construction of a simple ground model and cross section for the Slovens Creek Viaduct western abutment. Limit-equilibrium and pseudo-static slope stability analyses using both circular and block critical slip surface search methods were applied to the ground model for the western abutment of Slovens Creek Viaduct. Piezometric and strength data obtained during laboratory testing of core material have been used to constrain the western abutment stability assessment for one representative section line (C-C’). Prior to pseudo-static sensitivity analyses peak ground acceleration (PGA) for various Ultimate Limit State (ULS) design return periods, defined by an equation given in NZS1170.5:2004, were calculated and have been used as a calibration technique to find and compare specific PGA values for pseudo-static analyses in the Slovens Creek Viaduct area. The main purpose has been to provide an indication of how railway infrastructure could be affected by seismic events of various return periods defined by ULS design standards for the area. Limit equilibrium circular slip surface search methods, both grid search and auto refine search, indicated the slope is stable with a FoS greater than 1.0 returned from each, although one particular surface returned the lowest FoS in each. This surface is in the lower portion of the slope, adjacent to Slovens Stream and northeast of the MDL. As expected, pseudo-static analyses returned a lower FoS overall when compared to limit equilibrium analyses. The PGA analyses suggest that partial ground failure at the Slovens Creek Viaduct western abutment could occur in a 1 in 25-year return period event within materials on the slower slope beyond the immediate rail corridor. A ULS (1 in 500-year) event in the Slovens Creek Viaduct area would likely produce a PGA of ~0.9g, and the effects on the western abutment and rail infrastructure would most likely be catastrophic. Observed ground conditions for the western abutment of the Slovens Creek Viaduct suggest there is no movement within the landslide at depth within the monitoring timeframe of this project (22 May 2015 – 4 August 2015). Slope stability monitoring is recommended to be continued in two parts: (1) the inclinometer in BH1 is to be monitored on a six monthly basis for one year following completion of this thesis, and then annually unless ground movements become evident; and (2) surface movement monitoring should be installed using a fixed datum on the stable eastern abutment. Long-term stability management strategies for the Slovens Creek Viaduct western abutment are dependent upon future observed changes and ongoing monitoring. Hazard and risk assessment using the KiwiRail Qualitative Risk Assessment Framework (QRA) is recommended, and if slope stability becomes problematic for operation of the Midland Line consideration should be given to deep slope drainage. In the event of a large magnitude or high PGA earthquake all monitoring should be reviewed.