Search

found 106 results

Images, UC QuakeStudies

A photograph of 141 Cambridge Terrace taken from a vacant site on Gloucester Street. The building is under deconstruction and the windows have been removed so that the inside is visible.

Images, UC QuakeStudies

A photograph of 141 Cambridge Terrace taken from across a vacant site on Gloucester Street. The building is under deconstruction and the windows have been removed so that the inside is visible.

Images, UC QuakeStudies

A photograph of the Westpac Trust Building taken from behind a cordon fence on High Street. The building is under deconstruction, with many of the windows removed. In the background, cranes are filling the skyline.

Videos, UC QuakeStudies

A video of the first part of a series of talks on the topic of Planning and People, at the 2012 Seismics and the City forum. The talks are as follows: Mary Devine, Managing Director of Ballantyne and Co, on Anchoring Re:START and holding the centre; Anthony Leighs, Chief Executive of Leighs Construction, on Deconstruction and Reconstruction; and Sam Johnson, founder of the Student Volunteer Army, on Mobilising a Quick Response.