A photograph of the construction of Illusions taking place on an empty site on Gloucester street. The installation is part of LUXCITY.
A photograph of scaffolding and construction hoardings around the McKenzie & Willis building on the corner of High Street and Tuam Street.
A building under construction on Colombo Street in Sydenham. In the distance, two murals can be seen on the sides of a building.
A PDF copy of The Star newspaper, published on Friday 14 December 2012.
A photograph of wooden planks used in the construction of Gap Filler's temporary outdoor cinema. The boards have a crown logo painted on them.
Volunteers in hard hats and high-visibility vests, lifting a pallet up to place on steel rods during the construction of the Pallet Pavilion.
Volunteers in hard hats and high-visibility vests, lifting a pallet up to place on steel rods during the construction of the Pallet Pavilion.
Volunteers in hard hats and high-visibility vests, lifting a pallet up to place on steel rods during the construction of the Pallet Pavilion.
Building construction in Edgeware. This will eventually house a SuperValue supermarket, on the fence is a large sign that says 'Kia Kaha Chch'.
The public walking through and taking photographs of the ongoing deconstruction and construction work in the CBD. Two diggers can be seen in the background.
The man in charge of the construction of the Canterbury Television Building is continuing to refuse to give evidence at the Canterbury Earthquakes Royal Commission
The seismic response of unreinforced masonry (URM) buildings, in both their as-built or retrofitted configuration, is strongly dependent on the characteristics of wooden floors and, in particular, on their in-plane stiffness and on the quality of wall-to-floor connections. As part of the development of alternative performance-based retrofit strategies for URM buildings, experimental research has been carried out by the authors at the University of Canterbury, in order to distinguish the different elements contributing to the whole diaphragm's stiffness. The results have been compared to the ones predicted through the use of international guidelines in order to highlight shortcomings and qualities and to propose a simplified formulation for the evaluation of the stiffness properties.
The Canterbury Earthquakes Royal Commission says it will not re-open its inquiry into the CTV building collapse, despite fresh allegations against the building's construction manager.
Page 3 of Section A of the Christchurch Press, published on Saturday 20 October 2012.
A PDF copy of The Star newspaper, published on Friday 29 June 2012.
A PDF copy of The Star newspaper, published on Wednesday 28 November 2012.
Construction workers with high visibility clothing and hard hats assemble a crane on High Street to help demolish the Westpac Building. The BNZ building can be seen in the background.
Page 1 of Section A of the Christchurch Press, published on Saturday 15 September 2012.
Page 2 of Section C of the Christchurch Press, published on Saturday 15 September 2012.
Demolition along Kilmore Street. A digger can be seen as well as a construction worker with a high hat and high-visibility vest. The rubble has been separated into different piles.
The Government has handed the report of the Royal Commission on the Canterbury Earthquakes to the police to look at whether further action could be taken over the construction of the CTV building.
The spire of Christ Church Cathedral once stood 20 storeys high but was reduced to less than half that by last year's earthquake. Its temporary replacement's construction began yesterday with the first sod turned.
Page 16 of Section A of the Christchurch Press, published on Wednesday 27 June 2012.
Page 5 of Section A of the Christchurch Press, published on Wednesday 28 November 2012.
Page 3 of Section A of the Christchurch Press, published on Monday 22 October 2012.
Page 5 of Section A of the Christchurch Press, published on Tuesday 18 September 2012.
Kilmore Street, looking west from Manchester Street. The street has been barred off by wire fencing. A pile of steel, construction equipment and a portaloo sit in front of the cordon.
Photograph captioned by BeckerFraserPhotos, "The BNZ building on Armagh Street with the PWC building under construction and Copthorne Hotel being demolished behind. The Forsyth Barr building can also be seen".
Piles of rubble along Kilmore Street. A digger can be seen in the background as well as a construction worker in a hard hat and high-visibility vest. The rubble has been separated into different piles.
Photograph captioned by BeckerFraserPhotos, "The new Westende Jewellers building on the corner of Manchester and Worcester Streets. The former building collapsed in the 4 September 2010 earthquake".