Search

found 216 results

Images, UC QuakeStudies

A photograph of the Carlton Hotel on the corner of Papanui Road and Bealey Avenue. The top storey of the building's walls have crumbled, the bricks spilling onto the street below. Steel bracing has been placed against the building to the left.

Images, UC QuakeStudies

A photograph of the earthquake damage to Cranmer Courts on the corner of Montreal and Kilmore Streets. The brick walls of the gables have crumbled at the top, and wooden bracing has been placed against them to limit further damage.

Images, UC QuakeStudies

A photograph looking south down Colombo Street from the intersection of Gloucester Street. In the distance a crane is hanging over Cathedral Square. Below the crane is a pile of rubble from the partially-demolished tower of ChristChurch Cathedral. To the right is a smaller crane and a steel structure which will be used to brace the front of the Cathedral.

Images, UC QuakeStudies

The Harbourlight Theatre on London Street in Lyttelton. There is cracking along the side of the building and damage to the domes on top of the towers. Bracing has been placed at the top to limit further damage and to stop debris from falling on the road.

Images, UC QuakeStudies

A photograph of the earthquake damage to the Cranmer Courts on the corner of Montreal and Kilmore Streets. One of the gables of the section of the building on the corner has crumbled. Ties have been placed around all of the gables as bracing.

Images, UC QuakeStudies

A photograph of the earthquake damage to the Cranmer Courts on the corner of Montreal and Kilmore Streets. The tops of the gables of the section of the building on the corner have crumbled. Ties have been placed around all of the gables as bracing.

Images, UC QuakeStudies

The old Railway Station clock tower on Moorhouse Avenue with plywood and steel reinforcement covering two sides, a crane hanging over top. The brickwork suffered extensive cracking during the earthquake making it in need for reinforcement. The clock has stopped at around 16:35, the time of the earthquake.

Images, UC QuakeStudies

The old Railway Station clock tower on Moorhouse Avenue with plywood and steel reinforcement covering two sides, and a crane hanging over top. The brickwork suffered extensive cracking during the earthquake making it in need of reinforcement. The clock has stopped at around 16:35, the time of the earthquake.

Images, UC QuakeStudies

The old Railway Station clock tower on Moorhouse Avenue with plywood and steel reinforcement covering two sides, and a crane hanging over top. The brickwork suffered extensive cracking during the earthquake making it in need of reinforcement. The clock has stopped at around 16:35, the time of the earthquake.