A view down Durham Street. Cordon fencing and green scaffolding nets can be seen down the street.
A photograph of the earthquake damage to the Provincial Hotel. Scaffolding has been constructed up the side.
A photograph of the earthquake damage to the Provincial Hotel. Scaffolding has been constructed up the side.
A photograph of the scaffolding which was constructed around the Provincial Hotel before the building was demolished.
Damaged building in Christchurch central, steel bracing and scaffolding are used to support the walls on the building.
Workers survey the poles of scaffolding ready to be assembled in the E8 and E9 lecture theatres.
Scaffolding surrounding a building. In front is a wall, which has been painted in orange, yellow, and red hues.
Construction workers on the scaffolding which surrounds the Millennium Hotel. Fencing has been placed around the buildings to restrict access.
The Grange Guest House with scaffolding in front of the windows. Rubbish skips can be seen on the property grounds.
A photograph of the earthquake damage to the Austral Building on Colombo Street. Scaffolding has been placed up the side.
A photograph of the earthquake damage to the Austral Building on Colombo Street. Scaffolding has been placed up the side.
A photograph of the earthquake damage to the Austral Building on Colombo Street. Scaffolding has been placed up the side.
A photograph of the earthquake damage to the Austral Building on Colombo Street. Scaffolding has been placed up the side.
A photograph of the earthquake damage to the Austral Building on Colombo Street. Scaffolding has been placed up the side.
The Isaac Theatre Royal on Gloucester Street. The windows have been boarded up and scaffolding has been placed out the front.
A photograph of the earthquake damage to 139 Manchester Street. Inside the building, scaffolding is being used to hold up the damaged roof.
A photograph of the earthquake damage to 139 Manchester Street. Inside the building, scaffolding is being used to hold up the damaged roof.
Earthquake damage to the Cranmer Centre. Bricks have fallen from the wall, exposing the inside rooms. Scaffolding has been placed around the building.
Earthquake damage to the Cranmer Centre. Bricks have fallen from the wall, exposing the inside rooms. Scaffolding has been placed around the building.
The damaged New Regent Street facades. Scaffolding has been placed under the awnings. The BNZ building on Armargh Street can be seen in the background.
A photograph of scaffolding in front of the side entrance to 170 Tuam Street. A sign above the door reads, "No admittance, goods entrance only".
Detail of earthquake damage to the Cranmer Centre. Bricks have fallen from the wall, exposing the inside rooms. Scaffolding has been placed around the building.
A photograph of the Austral Building on Colombo Street with scaffolding up the side. A sign on a side door reads, "No admittance. Goods entrance only".
Damage to a house where the side wall has crumbled, exposing the inside. Scaffolding has been set up on one side to prevent any futher damage.
A view from Cambridge Terrace of the damaged Our City O-Tautahi building, formerly the Municipal Chambers. Scaffolding has been placed along the side of the building.
Damage to a building on Colombo Street. Scaffolding has been constructed against the wall and it has blue and yellow tarp to protect it from the rain.
View of the intersection of Victoria Street and Bealey Avenue, looking towards the Knox Church. Across the street are unstable buildings with scaffolding erected around the sides.
Damage to a building on Colombo Street. Scaffolding has been constructed across the front and it has a blue and yellow tarp to protect it from the rain.
Scaffolding in front of the damaged building that housed Satchmo Hairdressing on Victoria Street. The street has been cordoned off with Police and Army personnel guarding the entrace.
Photograph captioned by Fairfax, "The new Christchurch Council building has suffered only cosmetic damage in the September 4th earthquake. Construction workers are kept busy moving scaffolding and fixtures".